Search results for: water main design

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 434
  • B-Level Water Main Design - Ibach to Norwood Reservoirs

    Type : Bid Notification

    Due : 10 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Aug, 2021 (about 2 years ago)

    Description of project: Provide routing analysis and design of approximately 5000 linear feet of a new 18 inch diameter water main to replace aging infrastructure. Existing main runs down SW Boones Ferry Road from SW Ibach Street to the Norwood Reservoir site just west of Interstate 5. Proposals must be submitted on letter-sized (8.5” X 11”) paper with font size no smaller than Arial 11.

    From: Tualatin (City)

  • RFP for Adelanto Road Water Main Design Services

    Type : Bid Notification

    Due : 14 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 25 Jul, 2023 (9 months ago)

    Publication Date/Time: 7/25/2023 12:00 PM Closing Date/Time: 8/14/2023 3:00 PM Contact Person: acastellanos@adelantoca.gov Related Documents: RFP Adelanto Rd Water Main Design Services Return To Main Bid Postings Page

    From: Adelanto (City)

  • B-Level Water Main Design - Ibach to Norwood Reservoirs

    Type : Bid Notification

    Due : 10 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 26 Aug, 2021 (about 2 years ago)

    Description of project: Provide routing analysis and design of approximately 5000 linear feet of a new 18 inch diameter water main to replace aging infrastructure. Existing main runs down SW Boones Ferry Road from SW Ibach Street to the Norwood Reservoir site just west of Interstate 5. Proposals must be submitted on letter-sized (8.5” X 11”) paper with font size no smaller than Arial 11.

    From: Tualatin ()

  • Chester (West) - Main Street Water Main Design

    Type : Bid Notification

    Due : 17 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 20 Dec, 2022 (16 months ago)

    Description: The design an 8-inch water main, largely within SHA right of way from the intersection of Main Street (south extension) and Castle Marina Road west to the intersection of Main Street and Shopping Center Road. The design is time critical. As detailed following, once an alignment is determined, the Project will solely be for the drafting and plan sheet generation, as well as preparing permit applications.

    From: Queen Anne (County)

  • Chester (West) - Main Street Water Main Design

    Type : Bid Notification

    Due : 17 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 20 Dec, 2022 (16 months ago)

    The design an 8-inch water main, largely within SHA right of way from the intersection of Main Street (south extension) and Castle Marina Road west to the intersection of Main Street and Shopping Center Road. The design is time critical. As detailed following, once an alignment is determined, the Project will solely be for the drafting and plan sheet generation, as well as preparing permit applications.

    From: Queen Anne County (County)

  • Chester (West) - Main Street Water Main Design

    Type : Bid Notification

    Due : 17 Jan, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 06 Dec, 2022 (17 months ago)

    Bid (w/ Min Quals)Price OnlyRFP: Double Envelope ProposalTORFPCost breakdownRFP: Triple Envelope ProposalService purchase - Fixed FeeService purchase - T&MQuick QuoteMain CategoryIssuing AgencyProcurement Officer / BuyerKaren RODGERSSee AllEmail Summary:The design an 8-inch water main, largely within SHA right of way from the intersection of Main Street (south extension) and Castle Marina Road west to the intersection of Main Street and Shopping

    From: Maryland (State)

  • Consulting Services for Zone 4N Secondary Water Main Detailed Design and Construction Management

    Type : Bid Notification

    Due : 16 May, 2024 (in 14 days)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    The Town of Okotoks (the “Town”) is currently accepting proposals from qualified engineering consultants for the Zone 4N Secondary Water Main project. Consultants are required to complete the design and, subject to Council approval of the construction budget, administer the construction contract and conduct construction supervision. The project will start in early 2024, with construction occurring in 2025.

    From: Okotoks (Town)