Search results for: water piping infrastructure

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 86
  • Site Visit: Water Piping Infrastructure for the Armed Forces Retirement Home

    Type : Bid Notification

    Due : 30 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 28 Jul, 2021 (about 2 years ago)

    Water Piping Infrastructure – Armed Forces Retirement Home, Washington, D.C.A site visit is scheduled for Contractors interested in proposing for this requirement. The place will be 3700 N.

    From: Federal Government (Federal)

  • Synopsis_GLEN 12-1027_Repair by Replacing Domestic Water Pumps B420

    Type : Pre-Bid Notification

    Due : 12 Jun, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 28 May, 2020 (about 3 years ago)

    Additionally, all steel water piping infrastructure in and around Building 420 requires replacement, with pipes resized for the flows from the new pumps, and equipped with new valves and fittings to provide simplicity of maintenance and repairs.

    From: Federal Government (Federal)

  • ACF Boiler Heating Upgrades

    Type : Bid Notification

    Due : 10 Apr, 2024 (22 days ago)
    Posted : 1 month ago
    Started : 12 Mar, 2024 (1 month ago)

    This includes the integration of hot water piping into the existing infrastructure tied to the steam-to-hot water heat exchangers which are to be demo’d as noted on the mechanical plans. One (1) of the existing steam boilers has been demo’d by the Owner as noted on the mechanical plans to make room for two (2) of the new hot water boilers.The addition of two (2) hydronic heaters for the boiler room’s freeze protection shall also be included.

    From: Hennepin (County)

  • ITT 30.22.06-03 - Construction Services for Hartland Landfill Cell 4 Liner

    Type : Bid Notification

    Due : 13 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 18 Sep, 2023 (7 months ago)

    , installation of a ground water HDPE pore pressure relief piping system, installation of a leachate collection HDPE piping system, tying-in temporary ground water and leachate piping to existing landfill piping infrastructure to allow complete functionality of Cell 4 by September 30, 2024, according to the design specifications and design intent.

    From: MerX (Federal)

  • ITT 30.22.06-03 - Construction Services for Hartland Landfill Cell 4 Liner

    Type : Bid Notification

    Due : 13 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 01 Sep, 2023 (8 months ago)

    , installation of a ground water HDPE pore pressure relief piping system, installation of a leachate collection HDPE piping system, tying-in temporary ground water and leachate piping to existing landfill piping infrastructure to allow complete functionality of Cell 4 by September 30, 2024, according to the design specifications and design intent.

    From: British Columbia (State)

  • College Creek Water Main Crossing (Construction)

    Type : Bid Notification

    Due : 20 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 17 Jan, 2020 (about 4 years ago)

    The proposed work consists of the installation of approximately 1,100-LF of 14-inch HDPE water main via horizontal directional drill (HDD) under College Creek and installation of all associated piping and appurtenances for connection to existing water main infrastructure associated with the College Creek Water Main Crossing. Installation of (2) - 2” HDPE conduits and 2 associated junction boxes.

    From: James City County (County)

  • ITT 30.22.06-03 - Construction Services for Hartland Landfill Cell 4 Liner

    Type : Bid Notification

    Due : 13 Oct, 2023 (6 months ago)
    Posted : 6 months ago
    Started : 15 Sep, 2023 (7 months ago)

    , installation of a ground water HDPE pore pressure relief piping system, installation of a leachate collection HDPE piping system, tying-in temporary ground water and leachate piping to existing landfill piping infrastructure to allow complete functionality of Cell 4 by September 30, 2024, according to the design specifications and design intent.

    From: Canada (Federal)