Search results for: water rate study

Showing opportunity 1 - 10 of 126
  • Comprehensive Sewer and Water Rate Study

    Type : Bid Notification

    Due : 13 May, 2024 (in 15 days)
    Posted : 14 days ago
    Started : 12 Apr, 2024 (15 days ago)

    Publication Date/Time: 4/12/2024 10:00 AM Closing Date/Time: 5/13/2024 2:00 PM Related Documents: RFP 20241020 Comprehensive Sewer and Water Rate Study Return To Main Bid Postings Page

    From: James City County (County)

  • WATER AND WASTEWATER ENTERPRISES - COST OF SERVICE STUDY, FINANCIAL PLAN, AND RATE STUDY

    Type : Bid Notification

    Due : 03 May, 2024 (in 4 days)
    Posted : 14 days ago
    Started : 12 Apr, 2024 (15 days ago)

    The City of Thousand Oaks invites proposals and pricing from qualified consultants for the City’s water and wastewater cost of service studies, financial plan updates, and rate studies.

    From: Thousand Oaks (City)

  • City Controller - Water Solid Waste and Sewer Rate Study RFP

    Type : Bid Notification

    Due : 15 May, 2024 (in 17 days)
    Posted : 16 days ago
    Started : 10 Apr, 2024 (17 days ago)

    The City is in need of a Water, Solid Waste, and Sewer rate study to ensure that the current rates are sufficient and will allow the City to meet its financial obligations and ensure long term stability. RFP: 2024 - City Controller - Water Solid Waste and Sewer Rate Study RFP

    From: City of Compton (City)

  • Request for Qualifications-Financial Consulting Services-Sewer Utility Rate Study

    Type : Bid Notification

    Due : 22 May, 2024 (in 24 days)
    Posted : 2 days ago
    Started : 24 Apr, 2024 (3 days ago)

    Similar studies of water and stormwater utility rates may follow. Successful firms must be licensed under the laws of the State of Washington.This rate study is intended to (1) analyze current and expected cost burdens against the existing rate structure, (2) evaluate rate equity within the system, and (3) provide rate recommendations designed to fully fund utility expenditures for 20 years.

    From: Lynden (City)

  • RFP Wastewater and Water Utility Rate Model and System Development Charges Methodology Update

    Type : Bid Notification

    Due : 30 May, 2024 (in 1 month)
    Posted : 2 days ago
    Started : 10 Apr, 2024 (17 days ago)

    to conduct a comprehensive water and wastewater rate study and an update to existing System Development Charge methodology.

    From: Johnday (City)

  • Cost of Service (Rate) Study

    Type : Bid Notification

    Due : 03 Jun, 2024 (in 1 month)
    Posted : 9 days ago
    Started : 18 Apr, 2024 (9 days ago)

    TUID operates a water tank, supplied by two water pumps which run on solar power and sewer lagoon, just outside of town. Solid waste gets hauled to a nearby landfill operated by Garfield County, UT. Who May Respond The Proposer must be a consulting or engineering firm that is experienced in conducting comprehensive power, water, sewer and solid waste utility rate studies. All responses must be uploaded to U3P by the closing date.

    From: Utah (State)

  • Cost of Service (Rate) Study

    Type : Bid Notification

    Due : 03 Jun, 2024 (in 1 month)
    Posted : 9 days ago
    Started : 18 Apr, 2024 (9 days ago)

    TUID operates a water tank, supplied by two water pumps which run on solar power and sewer lagoon, just outside of town. Solid waste gets hauled to a nearby landfill operated by Garfield County, UT. Who May Respond The Proposer must be a consulting or engineering firm that is experienced in conducting comprehensive power, water, sewer and solid waste utility rate studies. All responses must be uploaded to U3P by the closing date.

    From: Utah (State)