Type : Bid Notification
23-008055 - Brighton Recreation Center Water Slide Replacement postdate:- 03/10/2023 responsedate:- 04/25/2023 09:00 AM MDT Solicitation Number:- 23-008055 to solicitation details & future business opportunities.
23-008055 - Brighton Recreation Center Water Slide Replacement postdate:- 03/10/2023 responsedate:- 04/25/2023 09:00 AM MDT Solicitation Number:- 23-008055 to solicitation details & future business opportunities.
The "Project" of which the "Work" of the Contract is a part titled “Paradise Park Pool Water Slide Replacement and is located at 4775 McLeod Drive, Las Vegas, Nevada 89121 The "Work" is described in the Project Drawings and Divisions 01 through 32 of the Project Manual. The Work consists of the demolition and removal of an existing pool slide assembly, structural supports, foundations, and area drains within the slide assembly area.
Department:Public WorksRFP Number:531- Slide EngineeringStart Date:05/30/2023 4:43 PMClose Date:06/28/2023 5:00 PM
Town of Fairview Regional Aquatic Centre Structural Rehabilitation Project Description :The Fairview Aquatic Centre requires the structural replacement of the water slide stairs and a structural beam and column. Tender bid documents can be found at ae.bidsandtenders.ca
Bid Number00002129 Short DescriptionRFP-Dam 1 Slide Gates Replacement Project CMGCBureauPortland Water BureauPlanned Open for Submission6/1/2023 12:00 AMActual Open for Submission6/1/2023 5:16 PMClosed for Submission (Review Starts)7/27/2023 4:00 PM
The Fairbanks North Star Borugh is soliciting bids for work consisting of, but not necessarily limited to, refurbishment of the existing water slide,including recoating water slide steel, repairing and recoating fiberglass slide components, replacement of hardware and wear components, and other ... See more 0000258012 David Bates 9074591293 david.bates@fnsb.gov PU.AG.USA.1206906.C9857251
The 366 Force Support Squadron at Mountain Home AFB, Idaho, requires replacement of its non-operational water slide in accordance with (IAW) the specifications dated 24 August 2023. Please see combo and all referenced attachments.Attachments:1. Combo2. Specifications (24 August 2023)3. Photos (2) of current slide