The Contractor is responsible to furnish all required materials, labor, equipment, tests, and tools to perform all necessary construction to build and erect a new 13,955-gallon fire water steel bolted tank as per plans and specifications. The services shall be performed at 300 US Hwy 97 Weed CA, 96094.
The project includes the construction of a new segmental gravity retaining wall, associated grading and drainage, and an access pathway around an existing water tank, as shown on the plans entitled “Ridgeville Water Tank Retaining Wall and Site Design”, latest edition. The project site is located at 276 Blue Stone Hills Drive in Harrisonburg, Virginia (Tax Map: 77-C-64).
The City of Las Cruces is seeking bids from qualified contractors for rehabilitation services of the Missouri water tank construction in accordance with the plans and specifications documents contained herein. 0000297279 City of Las Cruces Clerks 575-541-2525 bidclerk@las-cruces.org PU.AG.USA.1757.C12591301 United States, New Mexico, Dona Ana County Pre-Bidding Events:Prebid Conference Recommended
DocumentsAddendum 1.pdfMt_Sidney_Specs_complete_20mar2024 (red).pdfMt Sidney Tank Plans - March 14 2024.pdfDocumentsDocumentSizeDescriptionPosted OnType Addendum 1.pdf(768.38 KB)Addendum 14/12/24RFx Document Mt_Sidney_Specs_complete_20mar2024 (red).pdf(1.79 MB)ITB 2316 - Mt. Sidney Water Storage Tank3/20/24RFx Document Mt Sidney Tank Plans - March 14 2024.pdf(3.73 MB)ITB 2316 - Mt.
DocumentsAddendum 1.pdfMt_Sidney_Specs_complete_20mar2024 (red).pdfMt Sidney Tank Plans - March 14 2024.pdfDocumentsDocumentSizeDescriptionPosted OnType Addendum 1.pdf(768.38 KB)Addendum 14/12/24RFx Document Mt_Sidney_Specs_complete_20mar2024 (red).pdf(1.79 MB)ITB 2316 - Mt. Sidney Water Storage Tank3/20/24RFx Document Mt Sidney Tank Plans - March 14 2024.pdf(3.73 MB)ITB 2316 - Mt.