Search results for: water well and pump

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 70
  • Water Well 4 Pump Station

    Type : Bid Notification

    Due : 09 May, 2024 (in 8 days)
    Posted : 1 month ago
    Started : 22 Mar, 2024 (1 month ago)

    Construction of a new water well pump station and related site work. The well pump station building includes a CMU building composed of a pump room, electrical room and chemical room. The pump room will house one vertical turbine pump capable of pumping approximately 1,825 gallons per minute, and all associated electrical equipment including a new PG&E service, switchboard, and standby generator.

    From: Watsonville (City)

  • WSP 2023 Water Program, Claiborne Street Water Well Repair, Contract No. 23-1988-28

    Type : Bid Notification

    Due : 23 May, 2024 (in 22 days)
    Posted : 12 days ago
    Started : 18 Apr, 2024 (12 days ago)

    WSP 2023 Water Program, Claiborne Street Water Well Repair, Contract No. 23-1988-28 postdate:- 18-Apr-2024 6:00:00 AM CDT responsedate:- 23-May-2024 2:00:00 PM CDT ( 35d, 6h+ ) description:- The City of New Roads will receive separate sealed Bids for WSP 2023 Water Program, Claiborne Street Water Well Repair, Contract No. 23-1988-28. The Work consists of the removal of existing 100 HP motor. 1,000 gpm pump and 150' of column pipe from the well.

    From: New Roads (City)

  • Nottingham Country MUD Remote Well 2 Electrical Improvements and Remote Well No. 3 Hurricane Harvey Mitigation

    Type : Bid Notification

    Due : 14 May, 2024 (in 13 days)
    Posted : 8 hours ago
    Started : 15 Apr, 2024 (15 days ago)

    Scope of Work of the Contract Documents includes the following: the rehabilitation of remote Well No. 2 including the conversion of electrical facilities from 2400 volts to 480 volts, the replacement of the well pump and motor, replacement of motor control center and construction of MCC building.

    From: IDS Engineering Group (State)

  • Resilient Surveillance Mission Cooling Water Supply

    Type : Pre-Bid Notification

    Due : 15 May, 2024 (in 14 days)
    Posted : 4 days ago
    Started : 25 Apr, 2024 (5 days ago)

    The main goals is to abandon the existing non potable water well in place, remove the existing underground storage tank if possible, demolish existing pump house which will include HEMP shielding, piping, and other water distribution system components, construct a new well into the lower Arapahoe aquifer, construct a new 1,000 SF pre-engineered pump house with HEMP equipment protection, construct a tie between the well and the cooling tower sump for

    From: Federal Government (Federal)

  • New Seminole Well Hwy 20 & Cedar Street

    Type : Bid Notification

    Due : 08 May, 2024 (in 7 days)
    Posted : 20 days ago
    Started : 26 Mar, 2024 (1 month ago)

    (CST) May 8th, 2024, for the New Seminole Well - Hwy 20 & Cedar Street. The Project consists of construction of a new potable water well including CMU building, one well pump and motor, piping, valves, flowmeter, tablet disinfection system, controls, electrical including a generator set (generator, ATS and HVAC supplied by Owner, installed by Contractor) and sitework.

    From: Okaloosa (County)

  • Solicitation for Test-Well Drilling Costs

    Type : Bid Notification

    Due : 10 May, 2024 (in 9 days)
    Posted : 5 days ago
    Started : 22 Apr, 2024 (8 days ago)

    The well contractor will furnish and install a submersible well pump capable of 50 gpm from 80 feet, along the equipment to conduct a 4-hour pumping test (valving, meter, discharge line, etc.). Water-level data and water quality samples will be collected by the Town’s hydrogeologist.

    From: Vermont (State)

  • Solicitation for Test-Well Drilling Costs

    Type : Bid Notification

    Due : 10 May, 2024 (in 9 days)
    Posted : 7 days ago
    Started : 22 Apr, 2024 (8 days ago)

    The well contractor will furnish and install a submersible well pump capable of 50 gpm from 80 feet, along the equipment to conduct a 4-hour pumping test (valving, meter, discharge line, etc.). Water-level data and water quality samples will be collected by the Town’s hydrogeologist.

    From: Vermont (State)