Type : Bid Notification
DISCLOSURE OF MAGNITUDE OF CONSTRUCTION PROJECT: The estimated magnitude of this requirement is between $25,000 and $100,000.General ScopeThe contractor shall repair, replace and/or modify the existing duck work and other components of the HVAC system at Watts Bar Lock. The work will be located inside the lock operation building.