Search results for: weir widening

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 11
  • Sacramento Weir Widening Construction Project

    Type : Bid Notification

    Due : 22 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 10 Jan, 2022 (about 2 years ago)

    Solicitation Number: W9123822B0005AMERICAN RIVER COMMON FEATURES, 2016 Sacramento Weir Widening Project – REVERSE INDUSTRY DAYSMonday, January 24 through Friday, January 28 January 2022.You are invited to request a One (1) Hour meeting with the U.S. Army Corps of Engineers, Sacramento District, between the hours of 0900 – 1700 PST to discuss this project. Interested contractors can request a time slot by contacting Mr. Sean McNeil at sean.t.mcneil@usace.army.mil. Contractors are required to submit an itinerary, fully describing all items of discussion.The Government is interested in soliciting reverse industry day interest. PLEASE NOTE THAT THERE IS NO SOLICITAT...

    From: Federal Government (Federal)

  • Sacramento Weir Widening Construction Project

    Type : Bid Notification

    Due : 09 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Nov, 2021 (about 2 years ago)

    Product Service Code is Y1PZ Construction of Other Non-Building FacilitiesGENERAL SCOPE:The purpose of the Sacramento Weir Widening project is to reduce the water surface elevation in the Sacramento River and allow more water to flow into the Yolo Bypass system. 

    From: Federal Government (Federal)

  • American River Common Features 2016, Sacramento Weir Widening

    Type : Pre-Bid Notification

    Due : 31 Mar, 2023 (13 months ago)
    Posted : 15 months ago
    Started : 11 Jan, 2023 (15 months ago)

    Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates solicitation of a requirement for Design-Bid-Build (DBB) construction services to be performed in support of the Sacramento Weir Widening at Yolo County, California.The scope of work for the Sacramento Weir Widening Project includes construction of project features with approximate lengths provided: 1,500 Length Feet (LF) road bridge, 1,450 LF passive weir, 2,500 LF levee, fish

    From: Federal Government (Federal)

  • Sacramento Weir Clearing Project

    Type : Bid Notification

    Due : 03 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Sep, 2021 (about 2 years ago)

    This is a non-personal services contract to provide vegetation and debris clearing for the American River Common Features 2016 Sacramento Weir Widening Project.

    From: Federal Government (Federal)

  • Sacramento Weir Clearing Project

    Type : Bid Notification

    Due : 03 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Sep, 2021 (about 2 years ago)

    This is a non-personal services contract to provide vegetation and debris clearing for the American River Common Features 2016 Sacramento Weir Widening Project.

    From: Federal Government (Federal)

  • Woodland Lake Outlet Structure/Channel Improvements

    Type : Bid Notification

    Due : 29 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 14 Jul, 2022 (21 months ago)

    Sheet Pile weir with concrete cap. 3. Widening of existing concrete box culvert and associated roadway items. 4. Select bank stabilization with riprap and/or grouted riprap and gabions. 5. Excavation and reshaping of ditches to typical sections. A pre-bid meeting will be held at 10:00 A.M. on Tuesday, August 16, 2022 in the 1st Floor Conference Room of City Hall located at 9200 Pigeon Roost Road, Olive Branch, MS.

    From: City of Olive Branch (City)

  • Tule River/Success Lake Spillway Enlargement Phase 2 Solicitation

    Type : Bid Notification

    Due : 16 Jul, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 16 Jul, 2021 (about 2 years ago)

    The work will include widening of the spillway, excavating the Ogee weir and Apron foundation and weir slope embedment using blasting and/or excavation, and installation of rock anchors.Additional project improvements include construction of trench drains at the main dam left abutments, flood proofing of existing recreation facilities, and raising and relocation of existing wells and storage tanks.

    From: Federal Government (Federal)