Search results for: welded steel

Showing opportunity 1 - 10 of 43
  • ITB #24-1453-KS - PWC - Kayak Reservoir No. 2 Construction

    Type : Bid Notification

    Due : 01 May, 2024 (in 4 days)
    Posted : 6 days ago
    Started : 04 Apr, 2024 (21 days ago)

    Engineer's Estimate : $2,450,000.00 Deadline for Questions : Wednesday, April 24, 2024, by 4:00pm and submit to Bids@snopud.com Responses to Questions Posted : on or before Thursday, April 25, 2024, by 4:30pm Work Description and Site: The project includes, but is not limited to, the installation of a 500,000-gallon welded steel reservoir (approximately 85-feet-high, 34-feet diameter) set on a new

    From: Snohomish County PUD (Utilities)

  • 3499 GELBERMAN Drydock

    Type : Pre-Bid Notification

    Due : 28 Apr, 2024 (in 2 days)
    Posted : 13 days ago
    Started : 12 Apr, 2024 (13 days ago)

    The principal dimensions and physical data for the vessel are shown below:GENERAL DESCRIPTION Length Overall 85'‐0" Breadth, Molded 26'‐0" Depth, Molded 10’-0” Material All Welded Steel Displacement, light 213 short tons Propellers (2) 64"Dx52"P, 4 blade Draft, loaded, aft 8'-6” Hull Form Monohull/Keel Coolers ABS I.D.

    From: Federal Government (Federal)

  • Notice of intent to restrict competition for repairs to Drift Collection Barge

    Type : Bid Notification

    Due : 22 Dec, 2024 (in 8 months)
    Posted : 4 months ago
    Started : 08 Dec, 2023 (4 months ago)

    The principal dimensions and physical data for the vessel are shown below:GENERAL DESCRIPTION Length Overall 235' 0" Breadth, Molded 40' 0" Depth, Molded 12’-3” Material All Welded Steel Displacement, light 213 short tons Draft, loaded, 8'-6” Hull Form Deck BargeThe work scope includes drydocking the barge, cleaning and painting the hull, cleaning and painting the tanks, and miscellaneous modifications and repairs in accordance with these specifications

    From: Federal Government (Federal)

  • North Pressure Plane Water System Improvements

    Type : Bid Notification

    Due : 23 Apr, 2024 (2 days ago)
    Posted : 19 days ago
    Started : 22 Mar, 2024 (1 month ago)

    The project consist of expansion of existing CMU block building, two high service pumps, generator, 10,000 gallon pressure tank and 300,000 gallon welded steel ground storage tank. - Contact Info Contact: Stan Hayes Phone: 903-758-2010 x 22 Fax: 903-758-2099 Email: stan@hayesengineering.net Bid Package Notes

    From: Hayes Engineering Inc (Co-op)

  • 17Q-097 Marion Oaks Water Treatment Plant #4 Well Sampling

    Type : Bid Notification

    Due : 24 Feb, 2025 (in 10 months)
    Posted : about 7 years ago
    Started : 03 Mar, 2017 (about 7 years ago)

    Currently the well is capped with a welded steel plate. The contractor will be responsible for removing the cap and re-capping the well once the temporary well pump has been removed. The well is cased with a 12” steel casing to a depth of approximately 160’ below ground surface. The total well depth is approximately 242’ from ground surface to bottom of well.

    From: Marion (County)

  • Engineering Design Services for the Fassler Tank Replacement Project

    Type : Bid Notification

    Due : 22 Apr, 2024 (4 days ago)
    Posted : 17 days ago
    Started : 07 Apr, 2024 (19 days ago)

    Tank Construction Quantities Alternative Net Cut Volume (yd3) Retaining Wall Max Height Area (ft2) Alternative 1: Welded Steel 2,014 22’ 2,500 Alternative 2: Prestressed Concrete 4,240 N/A N/A yd3 = cubic yard(s) ft2 = square foot/feet The evaluation assumes the welded steel tank would be constructed at existing grade (elevation 709).

    From: North Coast County Water District (Utilities)

  • CMGC Project Delivery for SW 209th Ave Pump Station Project (CIP 4194)

    Type : Bid Notification

    Due : 19 Apr, 2024 (6 days ago)
    Posted : 27 days ago
    Started : 28 Mar, 2024 (28 days ago)

    Additionally, approximately up to 150 lineal feet (LF) of 36-inch CCP water main replacement with welded steel pipe and a meter vault (with an owner supplied 30-inch meter) is to be installed near Cornelius Pass Rd. within an existing utility easement.TimelineAdvertisement and Release of RFP:March 28, 2024Pre-Proposal Meeting (Non-Mandatory):April 4, 2024, 10:30am

    From: Beaverton (City)