Type : Contract
WEST DITCH-MAIN DITCH WATERSHED PLAN AND ENVIRONMENT DOCUMENT - STODDARD COUNTY, MISSOURI. Solicitation ID/Procurement Identifier: 12FPC324D0007 Ultimate Completion Date: Fri Feb 20 18:00:00 GMT 2026
WEST DITCH-MAIN DITCH WATERSHED PLAN AND ENVIRONMENT DOCUMENT - STODDARD COUNTY, MISSOURI. Solicitation ID/Procurement Identifier: 12FPC324D0007 Ultimate Completion Date: Fri Feb 20 18:00:00 GMT 2026
ON SR 26 OVER UNT TO EAST FORK LITTLE WILDCAT CREEK ANDON US 31 OVER KELLY WEST DITCH, 7.41 MILES NORTH OF SR 28 Bid Number: R -38979-A Due Date: September 15, 2021 Address: Indianapolis, IN 46219
Horse Run Ditch West Drainage Improvements Agency:City of Chesapeake Number:IFB-20-171-1339-1-2020/KEH Due Date:5/28/2020 4:00 PM Eastern To make improvement to the Horse Run Ditch Drainage
Summary DetailsThe District of Squamish is seeking a qualified contractor for the excavation and ditch profiling of an existing ditch approximately 400m long on the west side of Highway 99, south of Industrial Way. The objective is to remove infill material and reinstate the ditch to its original design.
RFP #24-021 - 2024 Orland Hills West Road and Ditch Reconstruction Date: 02/16/2024 11:00 AM 02/16/2024 11:00 AM02/16/2024 11:00 AM Location:Location: Village Hall14700 S. Ravinia AvenueOrland Park, Illinois 60462
A sink hole has developed in the ditch fore slope on the west side of the roadway. The tile is an 18” diameter clay tile that has failed at the abovementioned mile post and station referenced. The fore slope of the west ditch will need to be shored and stabilized for repairs to be made. The tile is located at a depth of 12-14 feet below the surface grade of the Right of Way.
The fore slope of the west ditch will need to be dug out and shoring placed to stabilize the existing subgrade for repairs to be made. Repaired tile section shall be connected to existing Tile at a location where the existing tile is not damaged and clean connection can be made. Tile shall be replaced to the outlet at the existing box culvert.