Search results for: west lean

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 9 of 9
  • Repair West Lean To H141-2

    Type : Bid Notification

    Due : 15 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 18 Nov, 2022 (17 months ago)

    Description:  ASRC, Artic Slope regional Corporation Federal Field Services, LTC (ASRC) under the BOS contract FA3002-21-C-0003 is contemplating the issue of solicitation for the Work/Project as defined by the Contract Documents and consists of the following:  Plans and Specs attachedNotice to Offeror(s)/Supplier(s):  Any award will result in a contract between ASRC and selected contractor.  There will be no privity of contract between selected contractor and the US Government.  No award will be made under this solicitation until funds are available by issuance of funds against ASRC’s BOS contract.  ASRC reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals.  In the event ASRC cance...

    From: Federal Government (Federal)

  • Repair East & West Lean To Roof B187

    Type : Bid Notification

    Due : 07 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 14 Sep, 2021 (about 2 years ago)

    Replace the entire roof of the facility, including all lean-to areas, the valley gutter, and the rain leaders. Repoint select areas of the exterior CMU wall where necessary. Remove all flaking and loose paint and repaint exterior face of facility. Repair the slope of the earth directly along the western exterior wall.  Repair the rain guards along the western exterior wall. Repair exterior window seals and caulking.

    From: Federal Government (Federal)

  • Repair West Lean-To of Maintenance Hangar F141

    Type : Bid Notification

    Due : 10 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 03 Aug, 2021 (about 2 years ago)

    PROJECT SUMMARYThe Work of the Project as defined by the Contract Documents and consists of the following: Remove existing standing seam roof, provide new support framing on top of an existing low-sloped roof deck. Install new hidden fastener standing seam roof. Apply spray foam insulation to the underside of metal roof deck to a depth equal to an R-25. Additionally, interior office space will be repaired due to water damage resulting from the existing roof leaks including installation of new carpet, VCT, and a new acoustical drop ceiling. This work will include repairing an area of concrete floor.CONTRACTOR REQUIREMENTS:The Contractor awarded will need to provide information to have business set up for payment.  Also will need to fill out ...

    From: Federal Government (Federal)

  • Southwest Contract

    Type : Contract

    Due : 28 Feb, 2024 (2 months ago)
    Posted : about 5 years ago
    Started : 01 Mar, 2014 (about 10 years ago)

    Southwest Contract  strives to develop products that offer versatility and durability for today’s student environment. Their flexible furniture solutions are constructed with removable and replaceable components in order to maximize available floor space. Contract Highlights: All Southwest furniture is free-standing and does not require any additional support Products constructed with steel-to-steel fasteners Products available in a variety of sizes, configurations, and designs in order to optimize the space being furnished Options include fabric and exterior color options, a quick ship program, as well as design services that include AutoCAD 2D, 3D, and elevated drawings Southwest Contract takes great pride in creati...

    From: E and I Cooperative Services (Co-op)

  • Provide services on the genetics of type 2 diabetes in Africa

    Type : Bid Notification

    Due : 22 May, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 15 May, 2018 (about 6 years ago)

    These tissues represent key players in carbohydrates and lipids metabolisms and also participate in the low grade inflammation characteristic of both obesity and T2D in West-African obese T2D and lean T2D. The Contractor shall enroll 100 participants over 24 months. Both tissues shall be biopsied on each participant and blood samples shall also be obtained.Type 2 diabetes (T2D) is a major public health problem in the US and globally.

    From: Federal Government (Federal)

  • Y--CONSTRUCT POST-FRAME BUILDING, SACN

    Type : Bid Notification

    Due : N/A
    Posted : about 7 years ago
    Started : 17 Jun, 2016 (about 7 years ago)

    Additionally, a 32 foot long by 12 foot wide lean to shall be connected to the west side of the building and have a continuous roof line as that of the main building. The project is described in the Scope of Work that will be provided in the anticipated forthcoming solicitation.The successful offeror shall commence work within ten (10) calendar days after the issuance/receipt of a notice to proceed issued by the Government Contracting Officer.

    From: Federal Government (Federal)