Search results for: wharf and ramp

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 120
  • Fisherman's Wharf Boat Ramp Replacement

    Type : Bid Notification

    Due : 19 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 19 Jan, 2020 (about 4 years ago)

    Publications Fort Pierce Tribune1/19/2020 DocumentsBid PackageBid No. 20-028 Fisherman's Wharf Boat Ramp Replacement (226 Pages, Complete) Bid No. 20-028 Plan Set (23 Pages, Complete) Bid No. 20-028 Addendum #1 (1 Page, Complete) 20-028 Vol.

    From: St. Lucie (County)

  • RFQ 09-23 – Granite Bay Wharf Repairs

    Type : Bid Notification

    Due : 21 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 26 Jun, 2023 (10 months ago)

    . • Removal and replacement of the timber stringers, decking and handrails on the pier and walkway approach. • Disconnect gangway ramp and re-attach upon completion of timber repairs. • Disconnect the electrical lines and light standard attached to the pier, re-attach upon completion of timber repairs. • Disconnect all signs, lock box, fire extinguisher and any other components connected to the structure and remount upon completion of timber repairs

    From: MerX (Federal)

  • CMAR Louisiana International Terminal Wharf and Ramps

    Type : Bid Notification

    Due : N/A
    Posted : 18 months ago
    Started : 26 Oct, 2022 (18 months ago)

    CMAR Louisiana International Terminal Wharf and Ramps postdate:- responsedate:-

    From: Louisiana Purchasing Group (State)

  • ITT - Wharf Reconstruction DFO-SCH Carter’s Point Harbour Facility

    Type : Bid Notification

    Due : 26 Oct, 2023 (6 months ago)
    Posted : 7 months ago
    Started : 11 Oct, 2023 (6 months ago)

    Public Services and Procurement Canada (PSPC), has a requirement for the encapsulation of the existing wharf structure with a berlin wall system, including the supply and installation of steel support piles, concrete panels, concrete deck, wheel guard and seawall, ladders, mooring cleats, electrical system upgrades, as well, a new launching ramp and expansion to the existing service area at the Department of Fisheries and Oceans – Small Craft Harbours

    From: Canada (Federal)

  • Norman Wells Wharf Repair, Northwest Territories (EP922-180606/A)

    Type : Bid Notification

    Due : 14 Aug, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 27 Jul, 2017 (about 6 years ago)

    PWGSC is seeking the services of a qualified General Contractor to undertake the reconstruction and repair of the Canadian Coast Guard Wharf in Norman Wells, NWT. The existing wharf, located on the north bank of the Mackenzie River in Norman Wells, NWT. was built in 1975. The wharf consists of a steel sheet pile wall and ramp retaining a concrete and rock fill loading and storage area. Access is from a public service road.

    From: MerX (Federal)

  • HINGED RAMP

    Type : Bid Notification

    Due : 31 Jan, 2023 (15 months ago)
    Posted : 15 months ago
    Started : 30 Jan, 2023 (15 months ago)

    unloading platform, or receiving dock, at the expense of the Contractor.

    From: Federal Government (Federal)

  • Repair TC Wharf, Joint Base Charleston

    Type : Bid Notification

    Due : 30 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Oct, 2019 (about 4 years ago)

    A comprehensive inspection was completed by an engineering firm, and the results are included as an attachment to this sources sought announcement.The TC Wharf is composed of several different vintages, which include the TC Wharf, North Extension, West Addition, Train Trestle, North Ramp Addition, North Ramp, South Ramp and Center Ramp.The original TC Wharf was constructed circa 1941 and extends from bent 1 to bent 101.

    From: Federal Government (Federal)