Search results for: wheelchair ramp repairs

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 32
  • Concrete Sidewalk & Wheelchair Ramp Repairs

    Type : Bid Notification

    Due : 09 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 26 Jan, 2022 (about 2 years ago)

    Publication Date/Time: 1/26/2022 9:00 AM Closing Date/Time: 2/9/2022 11:00 AM Related Documents: HUD-2992 Debarment and Suspension osha form 22-55 Sidewalk and wheelchair ramp prevailing wagesIFB 22-55 2022 Concrete Sidewalk and WCR repairs IFB 22-55 2022 Concrete Sidewalk and WCR repairs-bid sheets

    From: Lowell City Hall (City)

  • Concrete Sidewalk & Wheelchair Ramp Repairs, 4 addenda issued

    Type : Bid Notification

    Due : 15 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 26 Jan, 2022 (about 2 years ago)

    Publication Date/Time: 1/26/2022 9:00 AM Closing Date/Time: 2/15/2022 11:00 AM Related Documents: HUD-2992 Debarment and Suspension osha form 22-55 Sidewalk and wheelchair ramp prevailing wagesIFB 22-55 2022 Concrete Sidewalk and WCR repairs IFB 22-55 2022 Concrete Sidewalk and WCR repairs-bid sheets22-55 Sidewalk and Wheelchair Ramp addenda 122-55 Sidewalk and Wheelchair Ramp addenda 222-55 Sidewalk and Wheelchair Ramp addenda 322-55 Sidewalk and

    From: Lowell City Hall (City)

  • Exterior Wall Repair & Wheelchair Ramp Replacement

    Type : Bid Notification

    Due : 14 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 28 Jun, 2023 (10 months ago)

    Project Description :

    From: MerX (Federal)

  • Resurfacing FY 2023-2024

    Type : Bid Notification

    Due : 24 Jan, 2023 (15 months ago)
    Posted : 17 months ago
    Started : 17 Nov, 2022 (17 months ago)

    The project includes traffic control, asphalt and concrete pavement milling, asphalt paving, base failure repair, asphalt surface treatment, utility adjustments, manhole frame and cover replacements, wheelchair ramp installation, sidewalk, curb repairs, and pavement markings.

    From: Charlotte (City)

  • Riverside Avenue - Monroe Street to Division Street

    Type : Bid Notification

    Due : 04 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Feb, 2022 (about 2 years ago)

    This project consists of the construction of approximately 19,000 square yards of 2-inch thick HMA pavement, 3,000 linear feet water line, 5,000 square yards of pavement repair, wheelchair ramp replacement, STA bus stop construction, sundry utility replacements and adjustments, and other related miscellaneous items. The City of Spokane will receive bids until 1:00 p.m.

    From: Washington State Office of Minority and Women (State)

  • Resurfacing FY 2020-2022

    Type : Bid Notification

    Due : 06 Aug, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 22 Jul, 2020 (about 3 years ago)

    The project includes traffic control, pavement milling, bituminous surface treatment, structure adjustment, full depth patching, sidewalk & curb repairs, wheelchair ramp installation, and pavement markings.

    From: Charlotte (City)

  • Library Loop Trail North

    Type : Bid Notification

    Due : 06 Apr, 2023 (13 months ago)
    Posted : 12 months ago
    Started : 22 Mar, 2023 (13 months ago)

    Minor replacements of Concrete sidewalk and wheelchair ramps replacement. Minor slope repairs to small sections of berm between existing sidewalk and channel. Clearing and grubbing berm section and hydromulch disturbed areas. Minor pavement striping and traffic signs. Installation of automated pedestrian safety system which includes ITS poles and foundations.

    From: Lockwood Andrews and Newnam (Co-op)