Search results for: wide curb ramps

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 86
  • City Wide Curb Ramps 2023 Project

    Type : Contract

    Due : 13 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 27 Oct, 2022 (18 months ago)

    Project Name:City Wide Curb Ramps 2023 ProjectProject Type:BuildingOwnership:Public Project City, State:Elk Grove, California Engineer's Estimated Cost:$840,000 to $840,000 Pre-Qualification for Bidders:Not RequiredLicense Type Required:A and/or C-8Project/Contract Number:WAC035Project Contact: Kim Brown City of Elk Grove Public Works - CIP 8401 Laguna Palms Way Elk Grove, CA 95758 Tel:(916) 627-3316 Fax:(916) 691-3173

    From: Elk Grove City (City)

  • RFLOI for Construction Engineering and Inspection (CEI)

    Type : Bid Notification

    Due : 26 Apr, 2024 (Yesterday)
    Posted : 17 days ago
    Started : 08 Apr, 2024 (18 days ago)

    Bid Title:RFLOI for Construction Engineering and Inspection (CEI) Category:Bids and Request for Proposals (RFPs)Status:Open Description: The Town of Hope Mills is soliciting proposals for Construction Engineering and Inspection Services for the construction of approximately 785.7 feet of 10' wide concrete multi-use path, asphalt driveway connections, curb ramps and approximately 8.2 feet of 5' wide concrete sidewalk along the east side on NC 59/SR

    From: Hope Mills (Town)

  • 443976-1-58 CITY OF HOLLYWOOD VARIOUS LOCATIONS BIKE LANE/ SIDEWALK

    Type : Bid Notification

    Due : 06 May, 2024 (in 9 days)
    Posted : 21 days ago
    Started : 03 Apr, 2024 (23 days ago)

    Approximately 23,627 linear feet of new sidewalk 5 feet wide will be constructed on either side of the streets with curb ramps to fill-in and provide connectivity to existing sidewalks within the Hollywood Beach Heights and Hollywood Beach Estates neighborhood.

    From: Hollywood (City)

  • 2024 Trail Construction Program

    Type : Bid Notification

    Due : 17 Apr, 2024 (9 days ago)
    Posted : 29 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Approximate Quantities/Summary of Work:Trail Replacement - 2300m of 3.0m Wide Heavy Use TrailSidewalk Installation - 125m of 1.5m Wide Separate SidewalkConcrete Curb and Sidewalk Ramps

    From: Grande (City)

  • City-Wide Curb & Gutter, ADA Ramps & Miscellaneous Sidewalk Replacement Projects

    Type : Bid Notification

    Due : 28 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 25 Jul, 2018 (about 5 years ago)

    Lucie desires to obtain quotations from qualified individuals, firms, and legal entities relative to the City Wide Curb & Gutter, ADA Ramps and Miscellaneous Sidewalk Replacement Projects. The Contract period will be for two (2) years with the option of one (2) year renewal.

    From: Port St. Lucie (City)

  • Trail Program 2023

    Type : Bid Notification

    Due : 23 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 26 Feb, 2023 (14 months ago)

    Heavy Use TrailTrail Replacement - 310m of 3.0m Wide Heavy Use TrailConcrete Curb and Sidewalk Ramps Bid Document Access: Bid Opportunity notices and awards and a free preview of the bid documents is available on this site free of charge without registration.

    From: Grande (City)

  • Biola Community Sidewalk Improvements State Project Number: ATPL-5942(303)

    Type : Bid Notification

    Due : 21 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 07 Feb, 2024 (2 months ago)

    23-27-C Biola Community Sidewalk Improvements State Project Number: ATPL-5942(303) The work to be done consists, in general, of installing 5-foot wide sidewalks, curb ramps, approximately 2,000 linear feet of curbs and gutters, and a storm drainage system.

    From: Fresno (County)