Type : Bid Notification
The project will entail the removal and reconstruction of the storm sewer system, residential street paving, sanitary sewer rehabilitation, water line crossings and construction of an approximately 5-acre detention pond. The scope of work for the storm sewer system consists of the removal of 15-inch to 36-inch storm sewer and realignment of the proposed 18-inch to 48-inch RCP, 4’x3’ RCB and 5’x3’ RCB storm sewer by open cut. The project also includes reconstruction of approximately 2.7 miles of 28-foot wide 6-inch and 7-inch concrete pavement 0.26 miles of 22-foot wide asphalt pavement, including 2,000 linear feet of roadside ditch regrading, 5.3 miles of 5-foot sidewalk and reconstruction of concrete driveways. The proposed sanitary sewer ...