Type : Bid Notification
Crab Winch Refurbishment Project Ontario Waterways – Trent Severn Waterway (5P300-22-0061/B) Project Description :5P300-22-0061/B
Crab Winch Refurbishment Project Ontario Waterways – Trent Severn Waterway (5P300-22-0061/B) Project Description :5P300-22-0061/B
Bid Classification: Services Bid Type: Public Tender Bid Number: 98235 JB Bid Name: Menihek Crance Refurbishment – Fabrication and Supply of Winch Trolleys Bid Status: Open Bid Closing Date: Fri May 10, 2024 3:00:59 PM (NDT) Question Deadline: Thu May 2, 2024 11:59:00 PM (NDT) Electronic Auctions: Not Applicable Language for Bid Submissions: English unless specified in the bid document Submission Type: Online Submissions Only Submission Address: Online
Army Contracting Command - Warren (ACC-WRN) is soliciting a sole source, firm-fixed price, contract modification under the authority of FAR 6.302-1 (only one responsible source and no other supplies or services will satisfy agency requirements) for the refurbishment of Winch Control Kits (WCK) for the Modular Catastrophic Recover System (MCRS). The proposed contract action is for refurbishment of up to 54 WCKs.
This requirement is being 100% SET-ASIDE for SMALL BUSINESS.This procurement is for REFURBISHMENT OF ONE DYNACON WINCH.4. The procedures at FAR 13.106-2 apply to this acquisition.
The solicitation closing date is 30 March 2020 at 10:00 am CST.All interested companies shall provide a quotation for the following:00001 One (1) EBI W20-1000 Crane Winch and motor safety Inspection00002 One (1) Tulsa Winch TWG 1241W and motor safety Inspection00003 ShippingAdditional information including the scope of work, applicable clauses and price sheet can be found in the attachment sections of this posting.Services Performed in Support of
Steel Replacement, Flight Deck Preservation, Deckhouse Preservation, Annual LifeBoat and Davit Instpections, Refurbish Staterooms, DryDocking and Undocking, Propeller System Maintenance, Saddle Winch Electric Motor & Brake Refurbishment, Saddle Winch Gearbox Seal and Shaft Replacement.a. Unit of issue: Eachb. Destination information: East/Gulf Coastc. Delivery schedule: POP, commence on 12 February 2024 for 181 daysd. Procedures: FAR Part 15e.
All electronic correspondence shall have the subject line read: Announcement Number: NM-AN2122-22-00085Project Title: Refurbishment of the MVP-200 Moving Vessel Profiler Winch for NOAA Ship FairweatherNOAA's Marine Operations Center, Acquisition, Accountability, and Analysis Branch requires that all contractors doing business with this office be registered with the System for Award Management (SAM).