Search results for: wind engineer

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • On-site SolarWinds Support

    Type : Bid Notification

    Due : 06 May, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 05 May, 2020 (about 4 years ago)

    (QTY 15)  Day(s) of  On Site Solar Winds Health Check, Upgrade, Solar Winds Engineer for NPM, SAM, VNQM, IPAM, WPM, NCM and NTA. The 15 days will consist of:5 days onsite evaluation and tune up of current Solar Winds installation.5 days Solar Winds Basic Administrator training for 6 people5 Days Solar Winds Advanced Administrator training for 6 people(QTY 1) Travel for InstructorPlease see attached solicitation for further details.

    From: Federal Government (Federal)

  • ITB Z614700000 Little Diomede Helipad Improvements

    Type : Bid Notification

    Due : 25 May, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 04 May, 2023 (11 months ago)

    The project consists of rehabilitating the rock revetment, helipad surface and the lighting system, and replace the wind cone and rotating beacon. Engineer's Estimate is between $5,000,000 and $10,000,000. The project completion date is October 31, 2024.

    From: Alaska (State)

  • Request for Quotes #2203-A Mini-Split for IT

    Type : Bid Notification

    Due : 28 Dec, 2022 (15 months ago)
    Posted : 16 months ago
    Started : 13 Dec, 2022 (16 months ago)

    Fayette County dumpsters may NOT be used. e The contractor shall apply and received a permit from Fayette County Building Safety for new installation. e Contractor shall submit and engineer stamped design for wind uplift.

    From: Fayette (County)

  • McDuffie Terminal Roof Replacements

    Type : Bid Notification

    Due : 16 Feb, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 01 Feb, 2023 (14 months ago)

    Prior to commencement of work, the Contractor shall provide proof to include calculations by an Alabama license engineer as well as documentation by the manufacturer that the proposed roofing system meets the latest applicable ASCE wind code requirements. Documentation by the engineer must be stamped. 6. Prior to commencing construction, the Contractor shall have each roof tested for asbestos for worker safety.

    From: Alabama State Port Authority (Port)

  • Fuel Tank Foundations

    Type : Bid Notification

    Due : 30 Jun, 2022 (21 months ago)
    Posted : 22 months ago
    Started : 14 Jun, 2022 (22 months ago)

    The term “Engineer” shall mean the Engineer employed by the Owner for the Project and said Engineer’s duly authorized assistants and representatives. B. The term “Project” shall mean the substation(s), lines, and other facilities described and included in the Specifications and Drawings. C.

    From: City of Rocky Mount (City)

  • Tornado Modeling Support Services

    Type : Bid Notification

    Due : 21 Dec, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Dec, 2021 (about 2 years ago)

    The contractor shall use the acquired data to evaluate, validate, and propose changes, as needed, to the Smart^DI and other DIs included in the American Society of Civil Engineers / American Meteorological Society (ASCE/AMS) Wind Speed Estimation in Tornadoes draft chapter on EF Scale Methodology. 

    From: Federal Government (Federal)

  • :

    Type : Bid Notification

    Due : 29 Apr, 2023 (11 months ago)
    Posted : 15 months ago
    Started : 14 Apr, 2023 (12 months ago)

    The Engineer may order the Contractor to cease such activity temporarily if, in the judgement of the Engineer, wind or storm conditions threaten to cause the deposit of such materials into a waterway. d. No materials resulting from construction activities shall be placed in or allowed to contribute to the degradation of an adjacent wetland or watercourse.

    From: Watertown (Town)