Search results for: wind tunnel motor

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 24
  • Ram Air Turbine Wind Tunnel Motor Repair

    Type : Bid Notification

    Due : 07 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 02 Feb, 2022 (about 2 years ago)

    The Fleet Readiness Center Southeast (FRCSE) hereby gives notice of their intent to award a contract for the repair of a Ram Air Turbine motor. The Ram Air Turbine motor tests small wind turbines that connect to a hydraulic pump installed on an aircraft to help with the in air refueling process. 

    From: Federal Government (Federal)

  • Ram Air Turbine Wind Tunnel Motor Repair - Request For Proposals

    Type : Bid Notification

    Due : 22 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 17 Feb, 2022 (about 2 years ago)

    The Fleet Readiness Center Southeast (FRCSE) hereby requests proposals for the repair of a Ram Air Turbine motor. The Ram Air Turbine motor tests small wind turbines that connect to a hydraulic pump installed on an aircraft to help with the in air refueling process.  The RAT houses a three-phase-wye medium-voltage (4160/2300 volts) induction type motor that weighs in excess of 1000 pounds and is driven by variable speeds under computer control. 

    From: Federal Government (Federal)

  • Wind Tunnel Repair/Upgrade Services for NBDC

    Type : Bid Notification

    Due : N/A
    Posted : about 5 years ago
    Started : 27 Aug, 2018 (about 5 years ago)

    The company was the designer/inventor of the closed circuit wind tunnel that was previously purchased by the government, and therefore are uniquely qualified to determine the optimal motor and control system for the NDBC wind tunnel based on the company’s proprietary knowledge to determine the proper motor/controller combination as well as the sensing elements. 

    From: Federal Government (Federal)

  • NAFT Wind Tunnel Pipes

    Type : Bid Notification

    Due : 23 Aug, 2023 (8 months ago)
    Posted : 8 months ago
    Started : 16 Aug, 2023 (8 months ago)

    **THIS HAS BEEN AMENDED. PLEASE DISREGARD SOW IN SF-18 SECTION C. PLEASE REFER TO THE SECONDARY ATTACHED FILE WITHIN THE ATTACHMENTS SECTION OF THIS SOLICITATION**Full and Open CompetitionU.S. Government ~ Tax ExemptAll quotes/responses shall be submitted via email to Michael.j.coffey52.civ@us.navy.mil no later than 16 August 2023 07:00 am Eastern Standard Time.Solicitation N00421-23-Q-0506 is issued as a competitive procurement. The Government intends to purchase on a firm fixed-price basis, and to solicit and award the proposed purchase order on a competitive basis, under the authority implemented by Federal Acquisition Regulation (FAR) by FAR Part 12 and FAR 13. Offe...

    From: Federal Government (Federal)

  • Pump 6 Motor Rewind

    Type : Bid Notification

    Due : 23 Jun, 2023 (10 months ago)
    Posted : 10 months ago
    Started : 16 Jun, 2023 (10 months ago)

    The Bureau of Reclamation intends to award a solesource purchase order to KOFFLER ELECTRICALMECHANICAL APPARATUS REPAIR, INC. for motorrewind services represented in the PerformanceWork Statement. All responsible sources maysubmit a capability statement, proposal, orquotation, which shall be considered by theagency.

    From: Federal Government (Federal)

  • USAFA Trisonic Wind Tunnel Repair / Upgrade

    Type : Bid Notification

    Due : 24 Jul, 2023 (9 months ago)
    Posted : 11 months ago
    Started : 08 Jun, 2023 (11 months ago)

    This is a FINAL REQUEST FOR QUOTATION USAFA Combo Synopsis Solicitation for Trisonic Wind Tunnel Repair/Upgrade Attachment 1 – Description of Requirement TWT

    From: Federal Government (Federal)

  • 0512-03 Wind Tunnel Tests

    Type : Bid Notification

    Due : 28 Jul, 2023 (9 months ago)
    Posted : 9 months ago
    Started : 21 Jul, 2023 (9 months ago)

    This requirement is not eligible for small business set-aside.The Naval Surface Warfare Center Dahlgren Division (NSWCDD) intends to award on a sole source basis to University of Mississippi for testing and evaluation of the Hypersonic wind tunnel conditions to include base wind tunnel testing with an option to build an aerodynamic test apparatus with delivery required no later than one year from date of purchase order.

    From: Federal Government (Federal)