Type : Bid Notification
This is a FINAL REQUEST FOR QUOTATION USAFA Combo Synopsis Solicitation for Trisonic Wind Tunnel Repair/Upgrade Attachment 1 – Description of Requirement TWT
This is a FINAL REQUEST FOR QUOTATION USAFA Combo Synopsis Solicitation for Trisonic Wind Tunnel Repair/Upgrade Attachment 1 – Description of Requirement TWT
Description of the Supplies/Services BACKGROUND:The Department of Aeronautics, United States Air Force Academy, has a requirement to repair the Trisonic Wind Tunnel (TWT). The TWT is a blown-down tunnel capable of operating from Mach 0.3 to 4.5 with dynamic pressures as high as 35 psi in the test section.The tunnel is over 60 years old with a control system from the 1980’s.
SEE AMENDMENT 0001 CHANGESSEE Q&A RESPONSES Update to Q&A: Question 8, response relating to CAD Drawings. The CAD Drawings will be made available upon request to Robert.Loughman@us.af.mil.
The Fleet Readiness Center Southeast (FRCSE) hereby gives notice of their intent to award a contract for the repair of a Ram Air Turbine motor. The Ram Air Turbine motor tests small wind turbines that connect to a hydraulic pump installed on an aircraft to help with the in air refueling process.
The Fleet Readiness Center Southeast (FRCSE) hereby requests proposals for the repair of a Ram Air Turbine motor. The Ram Air Turbine motor tests small wind turbines that connect to a hydraulic pump installed on an aircraft to help with the in air refueling process. The RAT houses a three-phase-wye medium-voltage (4160/2300 volts) induction type motor that weighs in excess of 1000 pounds and is driven by variable speeds under computer control.
Army Corps of Engineers (USACE), Engineer Research and Development Center (ERDC), Cold Regions Research Laboratory (CRREL) intends to award a contract on a sole source basis to TSI, Incorporated upon the basis of the authority provided at FAR 13.106-1(b)(1).ERDC-CRREL's Biogeochemical Sciences Branch in Hanover, NH requires parts and services to upgrade and repair the Wind Tunnel in the Ice Engineering Facility by bringing back to operational capacity
When submitting your proposal online please be aware that your session will time out if not submitted within 45 minutes.Project InvolvesDesignProposals FromDesign ConsultantsType of FacilityMunicipal/GovernmentPosted inNYLocationMain Street, Buffalo NYEstimate$15,000,000.00DescriptionThe design services scope of work consists of preparing bid documents to completely remove and replace the Steel Hose Standpipe System (SHSS) in the NFTA-Metro rail tunnel