Type : Bid Notification
Due : 14 Mar, 2023 (13 months ago)
Posted : 15 months ago
Started : 26 Jan, 2023 (15 months ago)
to install a replacement air supply line for the aeration basins at the Central Wastewater Treatment Plant.
to install a replacement air supply line for the aeration basins at the Central Wastewater Treatment Plant.
Therefore, any and all steps must be taken to preventplant shutdowns, process delays or damage to the existing equipment. to install a replacement air supply line for the aeration basins at the Central Wastewater Treatment Plant. The project will include replacement of a 24-inch diameter airline that supplies air to the nearby aeration basins. Pressure testing of the airline is a critical portion of the project to ensure an airtight system.