Search results for: work and near surface

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 314
  • South Battery Park City Resiliency Project: Pier A Plaza / Battery Site Work and Near Surface Isolation (NSI) Construction Services

    Type : Contract

    Due : 07 Feb, 2023 (15 months ago)
    Posted : 17 months ago
    Started : 09 Dec, 2022 (17 months ago)

    South Battery Park City Resiliency Project: Pier A Plaza / Battery Site Work and Near Surface Isolation (NSI) Construction Services Agency: Hugh L. Carey Battery Park City Authority Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:12/09/2022 Due Date: 02/07/2023 Ad Type:General

    From: New York State Contract Reporter (City)

  • Site-specific Environmental Investigation

    Type : Bid Notification

    Due : 13 May, 2024 (in 8 days)
    Posted : 22 days ago
    Started : 10 Apr, 2024 (23 days ago)

    Exceedances of arsenic in near-surface soils of the established background concentrations ranged from 10 to 190 mg/kg. In eight surface soil samples and three near-surface soil samples, arsenic concentrations exceeded the established background concentration of 9 mg/kg in soils. Lead concentrations in 17 surface soil samples and 17 near-surface soil samples exceeded the DTSC SL of 80 mg/kg for lead in soils.

    From: Sacramento Housing and Redevelopment Agency (Other)

  • Allegheny River Tunnel Final Design

    Type : Bid Notification

    Due : 12 Apr, 2024 (21 days ago)
    Posted : 2 months ago
    Started : 28 Mar, 2024 (1 month ago)

    The project will build upon the work performed by the Preliminary Planning team, as well as other work completed to date on the Ohio River Tunnel (ORT) and ART-Near Surface Package 6 (ART-NSF6), to advance the ART and associated drop shafts, regulators, outfalls, and consolidation sewers to a final design.

    From: Allegheny County Sanitary Authority (County)

  • DAVINCI Connectors

    Type : Bid Notification

    Due : 21 Jul, 2023 (9 months ago)
    Posted : 10 months ago
    Started : 22 Jun, 2023 (10 months ago)

    THIS IS NOT A REQUEST FOR PROPOSAL. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.This notice is issued by the NASA/Goddard Space Flight Center (GSFC) to post a Statement of Work to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.Mission Overview:The Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging (DAVINCI) mission will investigate the evolution of Venus’ atmosphere using an architecture designed to optimize science-relevant measurements within the atmosphere through a chemistry pro...

    From: Federal Government (Federal)

  • Cultural Resources Services for Civil Works, Military and Work for Others Projects at Various Locations in the Los Angeles District ( Southern Cal...

    Type : Bid Notification

    Due : 01 Jul, 2021 (about 2 years ago)
    Posted : about 3 years ago
    Started : 29 Jun, 2021 (about 2 years ago)

    Use of mechanical equipment such as backhoes, augers, and application of remote sensing techniques (i.e. near surface geophysical studies) may be required.

    From: Federal Government (Federal)

  • DAVINCI Beryllium

    Type : Bid Notification

    Due : 25 Mar, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 10 Mar, 2023 (14 months ago)

    This notice is issued by the NASA/Goddard Space Flight Center (GSFC) to post a Statement of Work to solicit responses from interested parties. This document is for information and planning purposes and to allow industry the opportunity to verify reasonableness and feasibility of the requirement, as well as promote competition.

    From: Federal Government (Federal)

  • Frozen Soil Triaxial for ERDC GSL

    Type : Bid Notification

    Due : 01 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Aug, 2020 (about 3 years ago)

    A new system is necessary to continue research into near surface soil behavior, along with the study of sensors and their relationship with the top 1 meter of soils.  The unique Triaxial laboratory equipment and associated software has been utilized on multiple research and development projects by the GSL Sensor Coupling and Soil Behavior Laboratory for the last six (6) years.  

    From: Federal Government (Federal)