Type : Contract
REPLACE SIDEWALKS AND INSTALL DRAINAGE SYSTEMS - ZLC ARTCC - SALT LAKE CITY, UTAH Solicitation ID/Procurement Identifier: 697DCK-24-R-00222 Ultimate Completion Date: Fri Oct 04 17:00:00 GMT 2024
REPLACE SIDEWALKS AND INSTALL DRAINAGE SYSTEMS - ZLC ARTCC - SALT LAKE CITY, UTAH Solicitation ID/Procurement Identifier: 697DCK-24-R-00222 Ultimate Completion Date: Fri Oct 04 17:00:00 GMT 2024
This project is to renovate the Salt Lake City ARTCC B-105 & B-107 restrooms per the solicitation specifications.The work includes but is not limited to:(1) Removal of floor and wall finishes; (2) Removal of water closets, shower stalls, vanities, urinals, toilets, door B-107, solid surfaces and various restroom accessories; (3) Removal of mechanical systems such as duct accessories, plumbing fixtures and associated piping; (4) Removal of electrical
The FAA has a requirement to replace or reline the main sewer pipe and sanitary pipes at the Salt Lake City, ZLC, ARTCC in Salt Lake City, UT.The acquisition strategy for this procurement has not been determined at this time; however, either an unrestricted competition or set-aside will be chosen depending on the responses to this market survey.The responses to this market survey will be used to gather information to make an award and provide a time
Redacted Justification
This Solicitation (SIR) is for Landscape and Grounds Maintenance Services for the Salt Lake City Air Traffic Control Tower (SLC ATCT) and Air Route Traffic Control Center / Child Care Facility (ARTCC/CCF ZLC) to be completed as required in the Scope of Work that is located as attachment J-1 of the attached Solicitation 697DCK-20-R-00082.This acquisition is does not have a set-aside and is open to full competition.