Advanced Meter Infrastructure (AMI) Implementation Program Phase I

expired opportunity(Expired)
From: San Bernardino Water Department(City)
1835

Basic Details

started - 15 Feb, 2024 (2 months ago)

Start Date

15 Feb, 2024 (2 months ago)
due - 19 Apr, 2024 (8 days ago)

Due Date

19 Apr, 2024 (8 days ago)
Bid Notification

Type

Bid Notification
1835

Identifier

1835
City of San Bernardino Water Department

Customer / Agency

City of San Bernardino Water Department
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Furnish all labor, equipment, and tools to remove 7,504 outdated analog water meters, replacing them with 7,504 advanced meters integrated with Itron 500W cellular ERT communication modules. Furthermore, within the scope of the AMI phase 1 project, 5,042 advanced meters are currently fitted with Itron 100W endpoints. These meters necessitate the replacement of all 100W endpoints with Itron 500W endpoints. In addition to this, the project entails supplying the labor, tools, and materials to eliminate 398 existing water meter boxes. Then 398 H20 Traffic Rated meter boxes will be installed, accompanied by constructing a concrete pad measuring 4 inches in thickness and 12 inches in diameter around each meter box. This construction process adheres to the SBMWD Standard W1.1 (Attachment), ultimately reaching the final grade. Minimum Experience Requirements: Each Bidder shall show that he/she has completed the installation of three (3) AMI Projects of similar size and complexity within the last five (5) years for a similar size and type of agency. Project experiences with a water utility or other governmental agency are preferred. Other Details Minority and disadvantaged businesses are strongly encouraged to submit bids for this project as a prime contractor. Minority and disadvantaged businesses are also encouraged to reach out to prime contractors to partner up as subcontractors on portions of the project that they are able to perform. All contractors must follow the Special provisions Section of the Technical Specifications and comply with all applicable general law, regulations, executive orders, FEMA policies, procedures, and directives. Contractors are required to submit with their bids the Federal Forms contained in Appendix

397 Chandler Place Building B San Bernardino, California 92408Location

Address: 397 Chandler Place Building B San Bernardino, California 92408

Country : United StatesState : California

You may also like

INL Management Coordinator for Program Implementation

Due: 30 Apr, 2024 (in 2 days)Agency: STATE, DEPARTMENT OF

Advanced Metering Infrastructure (AMI) Improvements

Due: 02 May, 2024 (in 4 days)Agency: Talbot County

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.