24-027 Summit Blvd Drainage Improvements, 12th Avenue to Firestone Drive

From: Pensacola(City)
24-027

Basic Details

started - 10 Apr, 2024 (19 days ago)

Start Date

10 Apr, 2024 (19 days ago)
due - 09 May, 2024 (in 9 days)

Due Date

09 May, 2024 (in 9 days)
Bid Notification

Type

Bid Notification
24-027

Identifier

24-027
City of Pensacola

Customer / Agency

City of Pensacola

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

SUMMIT BOULEVARD DRAINAGE IMPROVEMENTS12TH AVENUE TO FIRESTONE DRIVE SCOPE OF WORKThis project is intended to improve storm drainage along Summit Boulevard at the intersection of Summit and Piedmont Road. Work will include the excavation of a new stormwater retention pond on the north side of Summit Boulevard and will include the removal of several existing shrubs and the protection of multiple trees within the pond area. A “Type C Ditch Bottom Inlet with Skimmer” will be installed at the east end of the retention facility and will connect to the existing storm drain inlet by RCP shown in the construction plans. The 18-inch RCP will be located beneath existing utilities as shown in the plans. Additionally, 4 curb inlets will be installed at the Summit-Piedmont intersection. The eastmost inlet will replace an existing manhole located in the sidewalk. The inlets will take in additional water flowing downhill towards Piedmont Road. All new or renovated structures will be connected to existing stormwater infrastructure. The project will require MOT for work performed in or near the right-of-way. The City shall be notified 24 hours at minimum prior to any changes in the traffic pattern including road, lane closures, and sidewalk closures. The contractor is responsible for the protection of existing utilities and infrastructure located below ground level, and additional utility locates may be necessary during construction. The pond area will be sodded once the pond has been excavated to final depth, and disturbed grass areas will be re-sodded. Any facilities unrelated to this project that are damaged or destroyed during the project will be restored at the contractor’s expense. The city will perform inspections during the project, and work shall be approved by the city inspector. All work shall be in accordance with the standards and specifications provided by the City of

222 West Main Street Pensacola, FL 32502Location

Address: 222 West Main Street Pensacola, FL 32502

Country : United StatesState : Florida

You may also like

Willow Ave and Alhambra Ave Drainage Improvements

Due: 15 May, 2024 (in 15 days)Agency: Seminole County

SW 121st Avenue Watermain Improvements

Due: 02 May, 2024 (in 3 days)Agency: City of Sunrise

24-027 Summit Blvd Drainage Improvements, 12th Avenue to Firestone Drive

Due: 09 May, 2024 (in 9 days)Agency: City of Pensacola

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Bids