Maintenance Dredging of Sandy Hook Channel, New York Harbor, Federal Navigation Project

expired opportunity(Expired)
From: Federal Government(Federal)
W912DS24B0008

Basic Details

started - 15 Mar, 2024 (1 month ago)

Start Date

15 Mar, 2024 (1 month ago)
due - 31 Mar, 2024 (26 days ago)

Due Date

31 Mar, 2024 (26 days ago)
Pre-Bid Notification

Type

Pre-Bid Notification
W912DS24B0008

Identifier

W912DS24B0008
DEPT OF DEFENSE

Customer / Agency

DEPT OF DEFENSE (708875)DEPT OF THE ARMY (133113)USACE (38130)NAD (5840)W2SD ENDIST NEW YORK (593)
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of New York Harbor, Sandy Hook Federal Channel. The dredged material would be placed for future beneficial use the Sea Bright Offshore Borrow Area (SBOBA), approximately 5 miles southeast of Sandy Hook Point, NJ; and/or at a nearshore placement site(s). The proposed maintenance dredging would remove approximately 200,000 cubic yards of dredged material from Sandy Hook Channel. Dredging would be required to a depth of -35 feet Mean Lower Low Water (MLLW) plus 2 feet allowable overdepth. The dredged material consists primarily of sand and gravel.The purpose of the proposed work is to alleviate the effects of shoaling and restore the authorized project dimensions, thereby providing safe and economical use of Sandy Hook Channel by military, commercial and recreational boating interests while providing future beneficial use of the dredged material.Based on past dredging cycles, it is
recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. Additionally, multiple ocean-going barges, tug boats and ancillary equipment will be needed to perform the dredging, transport and placement activities. The entire channel will generally not require maintenance dredging; only areas where shoaling has reduced the depth of the channel will require dredging. The dredged material would be required to meet all federal, state, and local criteria required by the government agencies having jurisdiction where the placement site is located.The Contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed, and to prosecute said work diligently and to complete all work ready for use not later than ninety (90) calendar days after the receipt by him of the notice to proceed (NTP). The contractor is required to maintain an integrated production of at least 8,000 cubic yards per calendar day.The work is estimated to cost between $1,000,000 and $5,000,000. Solicitation for the subject project is expected to be available in June 2024, with bid opening in July 2024. It is the intention of the government to award in August 2024 and issue the NTP within fourteen (14) calendar days of the award date.Liquidated Damages of $2,789.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete.This is an unrestricted Procurement.

Highlands ,
 NJ   USALocation

Place Of Performance : N/A

Country : United StatesState : New JerseyCity : Highlands

Office Address : KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300 NEW YORK , NY 10278-0004 USA

Country : United StatesState : New YorkCity : New York

You may also like

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

naicsCode 237990Other Heavy and Civil Engineering Construction
pscCode Y1KFCONSTRUCTION OF DREDGING FACILITIES