Project Title AC Water & Sewer Group 1049 Invitation # K-24-2166-DBB-3 Bid Posting Date 03/13/2024 11:43 AM (PDT) Project Stage Bidding Bid Due Date 04/11/2024 2:00 PM (PDT) Response Format Electronic Project Type Bid Response Types Line Items Subcontractor Bid Bond CONTRACTOR’S CERTIFICATION OF PENDING ACTIONS (required) SUBCONTRACTOR LISTING FOR ALTERNATE ITEMS (required) MANDATORY DISCLOSURE OF BUSINESS INTERESTS FORM (required) DEBARMENT AND SUSPENSION CERTIFICATION FOR PRIME CONTRACTOR (required) DEBARMENT AND SUSPENSION CERTIFICATION FOR SUBCONTRACTORS, SUPPLIERS AND MANUFACTURERS (required) Type of Award Lump Sum Categories 91200 - Construction Services, General (Incl. Maintenance And Repair Services) 91400 - Construction Services, Trade (New Construction) 237310 - Highway, Street, and Bridge Construction 238210 - Electrical Contractors and Other Wiring Installation Contractors 238910 - Site Preparation Contractors 238990 - All Other Specialty Trade Contractors 541330 -
Engineering Services 561730 - Landscaping Services 334290 - Other Communications Equipment Manufacturing 524126 - Direct Property and Casualty Insurance Carriers 541820 - Public Relations Agencies 237110 - Water and Sewer Line and Related Structures Construction License Requirements A or (C-34 and C-42) Department Purchasing & Contracting, Public Works Address 1200 Third Ave Suite 200 San Diego, California 92101 County San Diego Bid Valid Liquidated Damages Estimated Bid Value 22,740,000.00 Start/Delivery Date Project Duration Bid Bond Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Information Pre-Bid Meeting Yes - Not Mandatory Pre-Bid Meeting Date 03/27/2024 10:00 AM (PDT) Pre-Bid Meeting Location Teams Online Q&A Online Q&A No Contact Information Contact Info Ron McMinn 619-533-4618
rmcminn@sandiego.gov Bids to Ron McMinn Owner's Agent Description Scope of Services Construction of AC Water & Sewer Group 1049 consists of the installation of approximately 26,796 linear feet (5.08 miles) of replace-in-place, realigned, and new 8-inch, 12-inch and 16-inch water main and installation of approximately 3,223 linear feet (0.61 miles) of replacein- place and realigned 8-inch and 10-inch sewer mains, and rehabilitation of approximately 2,458 linear feet (0.47 miles) of 8-inch and 15-inch sewer mains. Related work includes potholing, water and sewer main abandonment, replacement of water services and laterals, fire hydrant installation, traffic control, street resurfacing, curb ramp installation, traffic striping, and construction best management practices (BMPs). 1.1. The Work shall be performed in accordance with: 1.1.1. The Notice Inviting Bids and Plans numbered 41460-01-D through 41460-71-D, Traffic Control Plans numbered 41460-T1-D through 41460-T225-D, and Bike Lane Striping and Electrical Plans: Balboa Avenue Kearny Villa Road to View Ridge (100499-1-D through 100499-16- D), Convoy St Aero Drive to Kearny Mesa Road (100499-17-D through 100499-23-D), Kearny Mesa Road Convoy St to Balboa Ave (100499-24-D through 100499-33-D), Kearny Villa Road I-805 to Tech Way (100499-34-D through 100499-54-D), Othello Ave Convoy. Other Details Notes Special Notices Local Programs & Policies Place eBid