The project can generally be described:Interior renovation of an existing active passenger terminal with the removal of 750’ of demising wall, associated security doors, and fixtures. Renovation includes flooring replacement, ceiling tile and grid replacements, modification to fire sprinkler head placement and HVAC diffuser placements. Relocation of gate podium locations with associated low voltage, electrical, and fixtures.The time of completion for the Base Bid work is anticipated to be 135 calendar days to achieve Substantial Completion. Exact time requirements are defined in the Instructions to Bidders.TimelineProject Documents Posted:April 16, 2024Mandatory Pre-Bid Conference & Site Visit (Mandatory):April 26, 2024, 2:00pm The Boardroom is located at the Authority's headquarters - 2nd Floor - 1200 Red Cleveland Boulevard, Sanford, FL 32773. The elevator to the 2nd floor is located in the terminal next to baggage claim area #3. Park in any available lot at the Airport and a parking voucher will be provided.Request for Clarification Deadline:May 7, 2024, 5:00pmFinal Addendum Posted:May 10, 2024, 5:00pmBid Submittal Time and Date:May 17, 2024, 2:00pm Responses will be accepted up to Friday, May 17, 2024 @ 2:00 p.m., at which time all responses received will be publicly opened, the contents noted and read aloud. The opening will take place at the Sanford Airport Authority, 2nd Floor Boardroom, 1200 Red Cleveland Blvd., Sanford, FL