Project consists of installation of a new septic system at the Descanso Fire Station on the Cleveland National Forest. The system will serve an office building and residence building. The office building serves approximately 20 employees year-round and the residence serves a family of three year round. The new system shall connect to the existing system in the front yard of the Residence building, just before the septic tank. The existing septic system shall be capped and abandoned in place.site utility investigation and protection, excavation, septic tank demolition, septic tank installation, lift station installation, installation of sewer line with connections and cleanouts, surge tank installation, infiltrator system installation, backfilling, and transportation/disposal of excess
Location
Place Of Performance : N/A
Country : United StatesState : CaliforniaCity : Descanso