The Bull Road Utility Extension consists of the construction of approximately 5,700 linear feet of 12-inch ductile iron watermain, 12-inch and 15-inch sanitary sewer main, 4-inch HOPE natural gas distribution main; approximately 6,400 linear feet of PVC power and communication conduits; and approximately 460 linear feet of 15-inch irrigation piping. Structures to be installed include approximately (20) manholes, (2) irrigation structures, and (2) concrete box culverts. A tunnel beneath Interstate 90 will be sealed off with self-compacting fill. Earthwork will be done to fill in the tunnel entrances and to redirect a fish-bearing creek. Surface restoration includes paving and