UPDATED--AFFF FOAM TRAILERS

expired opportunity(Expired)
From: Federal Government(Federal)
F1D3228127AW01

Basic Details

started - 13 Jul, 2018 (about 5 years ago)

Start Date

13 Jul, 2018 (about 5 years ago)
due - 31 Jul, 2018 (about 5 years ago)

Due Date

31 Jul, 2018 (about 5 years ago)
Bid Notification

Type

Bid Notification
F1D3228127AW01

Identifier

F1D3228127AW01
Department of the Air Force

Customer / Agency

DEPT OF DEFENSE (708219)DEPT OF THE AIR FORCE (60380)AFDW (1170)FA2860 316 CONS PK (574)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (2)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

 THIS IS SOLICITATION HAS BEEN AMENDED AS FOLLOWS--PLEASE READ IN FULL:1.  Purpose: This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in the Federal Acquisition Regulation (FAR) Subpart 12.6 as supplemented with additional information included in this notice.  This announcement constitutes the solicitation only; proposals are being requested and a written solicitation will not be issued. Solicitation number F1D3228127AW01 is being issued as a Request for Quote (RFQ) using the Simplified Acquisition Procedures in accordance with FAR Part 13 guidelines. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular (FAC) 2005-95. All responsible sources may submit an offer to be considered by the agency.1. The following paragraphs list the requirments for the manufacture, purchase and delivery of two (2) Aircraft Rescue Firefighting (ARFF) Foam Trailers.  2. Description of
Requirement: The Fire and Emergency Services Flight (CEF) requires the procurement and delivery of (2) 1000 gallon ARFF foam trailers. The procurement of the materials, delivery of all components, and travel to and from Joint Base Andrews will all be the responsibility of the contractor. 3. Required Equipment/Services that must be provided by the contractor:General Requirements:The following are the required specifications for two (2) mobile foam resupply trailers of 1000 gallon capacity with accessories for use as a firefighting unit.The trailer is intended to be towed by a support vehicle, of adequate capacity, to the scene of a fire and/or various types of spills for the purpose of fire suppression support. A one person operation shall allow for the transfer of foam to the fire at the scene of major incidents.Product shall be completely brand new and of the best quality materials currently used in commercial practice for emergency vehicle fabrication. Materials that deteriorate when exposed to sunlight, extreme weather or operational conditions shall not be used or shall have a means of protection against such conditions that will not prevent compliance with performance standards. Protective coatings that chip, crack, or scale with age or extremes of climatic conditions or by exposure to heat or cold shall not be used.The foam resupply trailer offered shall comply with all applicable Motor Carrier Safety Regulations, as it pertains to municipal emergency firefighting, concerning size, weight, brakes, lights, load rating and balance. Conformance must meet FMVSS #108, FMVSS #115, FMVSS #120, and FMVSS #125 as stated in FCR title 49 in effect at time of delivery. The trailer shall comply with the NFPA 1901 chapter 26 standard on fire department trailers. Incoming exemptions applicable to municipal fire departments shall be permitted.Vendor shall demonstrate that the product offered for this bid is a proven foam resupply of a type that has been manufactured for (and successfully used by) other emergency services. The vendor shall be certified to the ISO 9000:2015 standard.Weight shall be distributed as equally as practical over the axles and tires of the fully loaded vehicle. Fully loaded units that are unbalanced during standalone operations or while being towed will not be accepted. Tires, wheels and axles shall be adequately sized for the load imposed by the in service weight of the completed trailer.The use of proven non-metallic materials in lieu of metal is permitted if that use contributes to reduced weight, lower cost or less maintenance and there is no degradation in performance or increase in long term operations and maintenance costs.Foam resupply trailer must be constructed with lowest possible center of gravity when fully loaded with foam concentrate, tools, and the appliances specified herein. Performance must be commensurate with smooth and safe highway and moderate off highway operation. Proper weight and balance configuration is essential.4. System Requirements: I. TRAILER, TANK, AND COMPARTMENTS(A) TRAILER FRAME:GVWR - Gross vehicle weight rating shall not exceed 14,000 pounds when fully loaded and equipped.Size - Overall size of completed trailer (less packaging) not to exceed (approximately) 234" long, 88" wide, 80" high when measured from the ground surface.Frame Weldment - The main trailer platform, cross members and a-frame hitch shall be constructed from rectangular tube steel and entirely MIG welded for maximum strength and torsional stiffness. Frame cross members shall be adequately spaced to support the load of the tank. A channel shaped rear bumper shall be included at the rear behind the tank to protect the rear of the tank. A .125 high bright aluminum diamond plate step area approximately 8" deep x 60" wide shall be provided for reaching the top of the foam tank. The A-Frame nose tubes shall under lap the main frame tubes for maximum strength in this area. A .187 thick steel plate shall be provided at the nose area of the trailer for the mounting of the transfer pump.Lashing Points - There shall be (4) lashing points which shall allow the trailer to be safety lashed to the deck of a trailer should the trailer need to be moved other than towing it. These lash points shall be made from ¾" diameter solid steel and bent to form a "V" and shall be positioned appropriately (2) each side of the main trailer frame tubes.Fenders - Trailer fenders shall be heavy duty steel diamond plate type with center reinforcement supports. They shall support a firefighter in full turnout gear. The tops and slanted portions of the fenders shall have non-slip aluminum diamond plate surfaces.Axles - There shall be two axles, each with a rated capacity of 7,000 lbs. properly located under the trailer frame. Each wheel is to have individual functioning electric brake. Brakes shall have slack adjusters accessible from the back side of the backing plate. The bearings shall be sealed grease type. Hubs shall be cast type with pressed in wheel studs. The suspension shall meet or exceed the capacity of the axles and shall have slipper type springs. The main equalizer pivot point of the suspension shall have grease fittings.Tires and Wheels - Tires shall be a minimum ST235-80R16 tires. Wheels must be 6" x 16" and rated for 3500 lbs. at 80 psi."A" Frame Stand - One heavy duty 5,000 pound crank down detachable type stand to support the loaded trailer during stand-alone trailer operations shall be provided.Draw Bar - A 3" ID ring type drawbar shall be provided. Safety chains with slip hooks shall be rated for 14,000 lbs. each shall be provided at the front of the trailer. A break away line and trailer mounted battery shall be provided to activate brakes should the trailer become uncoupled from the tow vehicle.Trailer Electrical Plug - A round 7 pin male connector shall be provided at the extreme front of the nose tube with at least a 30" cord extending beyond the front of the trailer. The matching female plug shall be provided with a wiring diagram for proper interface between the tow vehicle and the trailer. The main power cord shall terminate into a main sealed junction box located under the nose of the trailer. All wiring shall extend from this box as required. Wiring shall be heavy duty all weather type insulated sized properly for all applied loads and protected from damage by foam concentrate overflow and normal use. An electrical schematic is to be provided for wiring tow vehicle. All wiring to be GXL cross linked with color coded function imprint every 4" wherever practical. All wiring shall be in protected channels or metal conduit.Tail, Clearance and License Plate Lights - The trailer lighting shall comply with FMVSS section 108 of FCR 49. There shall be two combination LED stop-tail-turn lights recess and shock mounted into a channel bumper at the rear of the trailer. Individual clearance lights on brackets shall mark the corners and rear of the trailer as required. A license plate light and bracket shall be located on the street side rear tapered plane of the fender.Warning Lights - Two 3" x 7" LED red flashing lights shall be provided on the rear and each side of the trailer. These lights shall be powered from the vehicles emergency light circuit.Rear Tank Overlay - The rear of the tank below the hose bed shall be overlaid with 1/8" high bright aluminum diamond plate to protect the back of the tank from hose and couplings.Work Lights - Two 2.5 x 6 clear lights shall be mounted (1) each side of the pump to illuminate all pump and piping controls for night operation. The switch for these lights shall be on the pump control panel. The power for these lights shall be from the main tail light circuit when the trailer is plugged into the tow vehicle.(B) FOAM TANK:Size - Capacity for 1000 U.S. gallons. Low center of gravity type with adequate baffles.Construction - The foam tank shall be constructed from ½" and ¾" thick PT III E co-polymer sheet stock. The material shall be a non-corrosive stress relieved thermo-plastic, black in color and UV stabilized for maximum protection. The tank shall be designed to be an independent component of the completed vehicle. All joints shall be welded using Nitrogen shielding gas and tested for maximum weld integrity. The transverse partitions are to be fabricated from 3/8 polypropylene and shall be black in color and shall extend from within 4" of the tank floor to the underside of the covers. The longitudinal partitions shall be fabricated from ½" polypropylene (black in color) and extend from the floor thru the covers to allow for positive welding and maximum integrity. All partitions shall be equipped with vent and flow holes to permit proper flow of foam and air within the tank under all conditions. All partitions interlock with each other and are fully welded to the sidewalls of the tank as well as to each other. The tank covers shall be of a flush design to eliminate trapping of water or foam on the top surface.Fill Tower - A fill tower shall be constructed which will allow the tank to be filled from 5 gallon foam cans. This tower shall be configured to allow two cans to be poured simultaneously into the foam tank. The tower shall have (2) recessed pockets which hold each of the 5 gallon cans in place. The design shall let the main tank vent as well as positioning the 5 gallon cans to fully self-draining. The tower shall have a hinged lid and a retaining devise to stop the lid from folding over on itself. Two pressure/vacuum vents shall be installed in this tower lid to eliminate air exchange unless foam is pumped into or out of the main tank or if thermal expansion or contraction of the liquid occurs. A label on the outside of the tower shall read "FOAM CONCENTRATE ONLY".Sump - A sump shall be provided to trap any foreign items that may become trapped in the tank. The sump shall be fabricated from ½" copolymer sheet stock and shall be permanently welded to the bottom of the tank.Sump Drain - The floor of the sump shall be fitted with drain outlet. A 3" port in the sump shall be piped to a 1-1/2" ball valve to allow the tank to be drained. The outlet shall be a 1-1/2" NST female swivel with a tethered plug. The valve shall be labeled "DRAIN - FOAM CONCENTRATE".Gauge - A vertical 2" wide translucent section of the tank shall be provided near the pump operator's position to accurately monitor foam level within the tank. Tanks utilizing electronic level devises will not be acceptable.(C) COMPARTMENTS:Hose Compartments - There shall be two (2) cross lay type hose beds approximately 12"H x 13" W across the front of the tank. Each compartment shall have a minimum capacity of 200 feet of 1.75" double jacketed fire hose. These hose beds shall hold the hose to be used for foam concentrate transfer operations. Each cross lay shall be labeled "CROSS LAY - CONCENTRATE #1, AND CROSSLAY CONCENTRATE #2" respectively. A vinyl cover shall be provided over these hose beds.Tool/Adapter/Accessory/Compartments - There shall be one compartment on top of the foam tank immediately behind the cross lay beds on the street side constructed of polypropylene. The compartment shall be fitted with a bright aluminum diamond plate cover and equipped with a "hold open" device and a draw type latch. A weather resistant seal shall be provided on the cover. Drain provisions to allow any water entering the compartment to drain out shall be provided.Large Diameter Hose bed - A hose bed open to the rear of the trailer shall be provided on top of the tank. It shall be the entire top width of the tank and shall occupy approximately two thirds of the total tank top surface. The bed shall have 3 sides to form the walls. The side walls shall be capped with 1" OD tubes with a rear 3" radius to allow hose to pay out without damage. This hose bed area shall have a capacity of 1000 ft. of 5" Large Diameter Hose (LDH) or 1200 ft. of 4" LDH. A vinyl cover shall be provided to prevent the accidental deployment of the rear hose.II. PUMP(A) PUMP:There shall be a 100 GPM self-priming gasoline driven pump for on loading and off-loading the foam concentrate. Pump must be cast iron with foam resistant internal components. Pump is to have an electric start with recoil back-up, gasoline driven, fuel tank and battery. A battery box shall be fabricated from ¼" co-polymer polypropylene sheet stock to hose battery. This box shall have a removable cover and shall have 5" x 5" vented side panel. The pump shall be mounted at front on the "A" frame portion of the trailer frame. A plastic isolator shall be installed under pump to eliminate contact of dissimilar metals. Provisions to manually fill the pump initially shall be provided. This shall be labeled "FILL TO PRIME". A yellow warning label shall be placed near the pump start controls which reads. "DO NOT RUN ENGINE WITH PUMP DRY OR PUMP SEAL WILL BE DAMAGED. FILL PRIME PORT PRIOR TO STARTING".(B) PUMP CONNECTIONS AND PIPING:The permanently mounted pump shall be capable of pumping foam concentrate from the tank or from 55 gallon drums. All piping shall be stainless steel or high pressure foam resistant hose. All concentrate valves shall be bronze body full flow with chrome plated brass ball with a nylon seat. Valves shall have lever type handles for rapid opening and closing.NOTE: All plumbing shall be designed for easy maintenance and/or replacement using grooved couplings or mechanical couplings.Must provide one (1) 2" suction piping arrangement from the tank to the pump with a ¼ turn tank isolation valve mounted at the tank. There shall be a label to identify this valve as "TANK TO PUMP"Must provide one (1) 1.5" NST-M inlet on main tank to pump (suction) line to be used as an auxiliary suction port connection for a pick up tube device through the suction side of the pump. Also, provide cap and chain for the 1.5" inlet. This inlet shall be labeled "AUX. SUCTION"Must provide two (2) 1.5" gated concentrate outlets from discharge side of pump. Both shall be plumbed to the bottom of each of the two cross lay hose compartments for concentrate transfer operations. Each discharge shall terminate in a 1.5" 90 degree continuous type brass swivel device mounted below hose beds to facilitate left or right side deployment of foam supply hose without kinking from the pump. Each valve shall be labeled "CROSS LAY - CONCENTRATE #1 AND CROSS LAY - CONCENTRATE #2" respectively.Must provide (1) gated concentrate outlet from the pump back to the tank to allow foam to be on loaded into the tank from the on board pump. The inlet connection within the tank shall extend straight downward to within 1" of the floor to reduce foam agitation while filling.III. ACCESSORIES:(A) SUCTION HOSEProvide one (1) approximately 72" long PVC 1.5" suction line with an 18" and a 40" PVC pipe pick up tube for drawing concentrate from 5 gallon cans or from 55 gallon barrels. This suction hose assembly shall also have a PVC 1-1/2" quarter turn ball valve located at the suction end of the hose to allow the pump operator to control foam flow into the pump while switching concentrate supply containers. Provisions shall be made to safely carry these items on the trailer.(B) FILL NOZZLESProvide two fill nozzles for the end of each of the concentrate hose bed hoses. Each fill nozzle shall consist of a 1-1/2" quarter turn PVC ball valve with a 1-1/2 NSTF swivel inlet x 1-1/2 NSTM outlet. These are to allow for direct bottom filling of foam tanks. Two 90degree pipe extensions shall be included that are approximately 42" in length and have a 1-1/2" NSTF swivel inlet connection. These can be added to the fill valves for top filling of other foam tanks through their fill towers. Provisions shall be made to safely carry these items on the trailer.(C) FOAM MONITOR WITH NOZZLEThe trailer shall have a pre-piped 3" riser with a 5" Storz inlet located at the front of the trailer ahead of the tank. There shall be a cap for the 5" inlet connection with a chain to connect it to the trailer. A 3" vertical pipe riser shall be permanently attached to the trailer frame. A bronze 3" full flow valve shall be provided in this riser. A 500 GPM flow adjustable nozzle with a 3% mixture rate shall be mounted on the monitor and shall be connect to an internal foam tank pick up tube through a clear hose. The hose connection at the tank shall be a cam and groove coupler to allow for easy flushing of the hose.(D) MANUALS/INSTRUCTIONSTechnical manuals, parts manuals, and repair manuals for all installed equipment and accessories shall be provided with the trailer. They shall include all maintenance recommendations and full operational information for each function that the trailer is designed to perform.(E) WHEEL CHOCKSOne set of wheel chocks shall be provided to allow the trailer to operate as a stand-alone unit. Provisions shall be made to safely carry these wheel chocks on the trailer.(F) GENERATOR AND LIGHT PACKAGEA Honda 2000 watt / 12 volt gasoline driven generator shall be mounted on the trailer using rubber isolators. Two 120 volt x 500 watt Fire Research Focus light heads on telescopic aluminum poles, mounted one each side, shall be mounted to the side of the foam tank on external mounting blocks. The lights shall be switched at the light head and shall be hard wired to the generator. All wires shall be run in flexible conduit as practical. Each light head shall have a snap on wire frame shield to protect the lens.IV. TREATING, PAINTING, AND LETTERING:(A) PAINTINGColor must be Fire Truck Red.A proven paint system shall be used to prime and paint the foam resupply trailer frame with appropriate color paint and shall be of an automotive quality finish. The copolymer foam tank and the walls of the attached hose beds shall be black in color. The tank shall be unpainted with a manufactured black smooth finish. The tank process shall include special adhesion promoters and the proper primer and paint that is compatible with the copolymer material. Areas inside the hose beds and compartments shall not be painted. A proven urethane automotive paint system shall be used to prime and paint the foam resupply trailer and the tank. Prior to priming, the entire steel trailer frame weldment shall be sand blasted to remove all mill scale and oils. Then it is to be hand sanded and primed. Any areas of overlapping seams shall be caulked after priming and before finish top coat. A bottle of touch up paint matching the top coat color shall be provided. The paint finish shall be of an automotive type quality. The color is to be as follows: Fire Truck Red.(B) LETTERINGLettering shall be provided on each side of the tank, on the stripe and shall not exceed 60 letters. All lettering shall be on the Scotchlite stripe.Lettering on both sides of trailer must be: United States Air ForceA six-inch white Scotchlite stripe shall be provided on the front and sides of the trailer.Striping sides of trailer 1" White, 1" Gap, 4" White, 1" Gap, 1" WhiteA 6" chevron pattern of red and yellow stripes shall be provided on the rear of the trailer. (NFPA NPN)A 6" chevron pattern of red and yellow stripes shall be provided on the rear of the trailer. (NFPA NPN)(C) LABELSAll devices will have fixed weatherproof labels or tags. Instructional plates will be mounted directly adjacent to operational controls.5. Location: The contractor will provide the delivery within 60 days of their procurement of the contract. The contractor is required to acquire and bring all required parts and equipment necessary for delivery. Transportation to and from Joint Base Andrews will be the responsibility of the contractor. The units must be delivered to Fire Station 1 at Joint Base Andrews, Maryland. The address for Fire Station 1 is 1287 South Dakota Avenue.6. Warranties:I. GENERAL WARRANTYThe contractor shall warranty the foam resupply trailer to be free from defects in material and workmanship under normal use and service for a period of two (2) years. The obligation under this warranty is to cover minor materials and workmanship supplied that should fail within that two (2) year period. (See I and II for other specific warranties) A copy of this warranty shall be provided with the trailer upon delivery.II. TRAILER FRAME AND TANK WARRANTYThe contractor shall pprovide a two (2) year warranty on the trailer frame and related parts. Items such as tires, brakes and other normal wear items are excluded from this warranty. A lifetime warranty shall be provided for the foam tank which includes labor and materials should the tank fail. A copy of this warranty shall be provided with the trailer upon delivery.III. OTHER WARRANTIESAll additional equipment such as pumps, valves, generators, appliances and equipment shall be warranted by its manufacturer per the applicable warranty provided by its manufacturer. The trailer manufacturer shall not extend these warranties if they are less than the standard two year warranty.7. Hours of Operation: Once the contract is awarded, the contractor must contact 11 CES/CEF at 301-981-4986 at least 14 days prior to arrival. This will allow the flight to ensure the contractor has access to the installation. Upon arrival at Joint Base Andrews, the contractor must contact the fire department dispatch center (Commercial: 301-981-4986) at least thirty minutes prior to arrival. This will ensure there are personnel available to escort them to the location of the vehicles if necessary. The schedule for installation will be agreed upon by the customer and contractor before the contractor arrives at Joint Base Andrews. It is preferred that the contractor complete the work Monday through Friday between 0730 and 1730.*NOTE 1: Disregrd previous attachment on orginal solicitation notice labled "Specifications of Trailer".Clauses & Provisions It is the vendor's responsibility to be familiar with all applicable clauses and provisions. All FAR/DFARS/AFFARS clauses and provisions may be viewed in full text via the Internet at http://farsite.hill.af.mil/  or http://www.arnet.gov/far/ .   The following provisions are applicable:   52.212-1 - Instructions to Offerors - Commercial (Jan 2017) 52.212-2 - Evaluation -- Commercial Items. The Government will award a Purchase Order resulting from this RFQ to the most responsive, responsible offeror whose offer represents the best value in terms of lowest price being technically acceptable.  The government intends to enter into an agreement without discussions, nevertheless, the government may communicate with an offeror in order to clarify or verify information submitted in its offer.   52.212-3 - Offerors Representations and Certifications - Commercial Items. All offerors must submit representations and certifications in accordance with this provision along with their offer. This provision can be downloaded from the internet via http://farsite.hill.af.mil/  or from https://www.sam.gov/  if registered in SAM (System for Award Management). Offerors that fail to furnish the required representation information or that reject the terms and conditions of the solicitation may be excluded from consideration.  52.252-1 - Solicitation Provisions Incorporated by Reference (Feb 1998). The following clauses are applicable: 52.204-7 - System for Award Management Registration Deviation (Jul 2013) 52.211-17 - Delivery of Excess Quantities (Sep 1989); 52.212-4 - Contract Terms and Conditions - Commercial Items (Jan 2017);      52.212-5 - Contract Terms and Conditions Required to Implement Statutes or Executive Orders - Commercial Items (Jan 2017) Alternate I (DEVIATION) (Jan 2017);  52.222-3 - Convict Labor (Jun 2003);  52.222-19 - Child Labor-Cooperation with Authorities and Remedies (Oct 2016);  52.222-21 - Prohibition of Segregated Facilities (Apr 2015);  52.222-26 - Equal Opportunity (Sep 2016); 52.222-50 - Combating Trafficking in Persons (Mar 2015); 52.223-3 - Hazardous Material Identification and Material Safety Data (Jan 1997);   52.223-6 - Drug-Free Workplace (May 2001); 52.223-18 - Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011); 52.225-13 - Restrictions on Certain Foreign Purchases (Jun 2008); 52.232-33 - Payment by Electronic Funds Transfer--System for Awards Management (Jul 2013); 52.233-3 - Protest After Award (Aug 1996); 52.233-4 - Applicable Law for Breach of Contract Claim (Oct 2004); 52.252-2 - Clauses Incorporated by Reference (Feb 1998); 52.252-6 - Authorized Deviations in Clauses (Feb 1998); 252.204-7004 - Alternate A, System for Award Management (May 2013); 252.212-7001 - Contract Terms and Conditions Required to Implement Statues or Executive Orders Applicable to Defense Acquisitions of Commercial Items (Jun 2011) (DEVIATION) applies to this acquisition and specifically the following clauses under paragraph (b) are applicable; 252.223-7004 - Drug-Free Work Force (September 1988); 252.232-7003 - Electronic Submission of Payment Requests and Receiving Reports (June 2012); 252.232-7006 - Wide Area Workflow Payment Instructions (May 2013); 6. The contracting office address is as follows:            11th Contracting Squadron            1349 Lutman DriveJoint Base Andrews, MD  20762 7.  All quotes must be sent via e-mail to Mr. Charles Maddox at charles.n.maddox.civ@mail.mil. Quotes shall be submitted no later than 12:00 PM EST, 31 Jul 2018. Questions shall be submitted no later than 12:00 PM EST, 26 Jul 2018 to allow responses to be posted on FBO prior to proposal due date. Email is the preferred method of communication. Late replies to the Combined Synopsis/Solicitation will be processed in accordance with FAR 52.212-1(f), "Late submission: modifications, revisions and withdrawals of offers."The government reserves the right to cancel this solicitation, either before or after the closing date for receipt of quotes. In the event the government cancels this solicitation the government has no obligation to reimburse an offeror for any costs incurred in preparation of this quote.

Fire Station 1, 1287 South Dakota Ave Joint Base Andrews, Maryland 20762 United StatesLocation

Place Of Performance : Fire Station 1, 1287 South Dakota Ave

Country : United States

You may also like

0414 SUPPLY BEAVERTAIL HEAVY EQUIPMENT TRANSPORT TRAILER

Due: 30 Apr, 2024 (in 4 days)Agency: FOREST SERVICE

Special Procurement: Firefighting Foam Trailer, BNSF

Due: 31 Dec, 2025 (in 20 months)Agency: Police, Oregon State

Slant Load Gooseneck Horse Trailer

Due: 31 May, 2024 (in 1 month)Agency: AGRICULTURE, DEPARTMENT OF

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

336 -- Transportation Equipment Manufacturing/336212 -- Truck Trailer Manufacturing
naicsCode 336212Truck Trailer Manufacturing
pscCode 12Fire Control Transmitting and Receiving Equipment, except Airborne