* 3 Equipment w/ 10’ plow & w/ 1.5-2.5 yard dry spreader (V-box) * 2 Equipment with 10’ Snow Pusher Box Blade ** 5 15-Yard Dump truck for hauling snow 2 *SIA will provide materials (i;e. salt, sand, liquid deicer, etc.) for dry spreaders and liquid applicators ** Critical Equipment - All critical equipment required shall be staged at the Airport in the designated area from October 15th to April 15th for each contract year. 3. Additional Personnel: The Proposer shall supply two (2) additional personnel to perform hand shoveling work at the direction of the Airport as needed. Spokane International Airport RFP for Landside Snow Removal Services Page 6 of 18 Schedule “B”: The following Locations and Equipment are required for the Schedule “B” Scope of Work. 1. Locations: Snow is to be cleared from all of the following areas: a) Airport Parking Lots b) RAC/QTA c) Airport roadways, including, but not limited to Airport Drive, Flint Road, Spotted Road, Flightline Boulevard, Pilot Drive and Will D. Alton Drive d) Various sidewalks in the Terminal and Parking areas e) Other Common Use Areas and Roadways (as assigned) 2. Equipment: The Proposer must furnish all equipment, along with drivers/operators, necessary to spread salt, plow/haul snow, ice, sleet, and/or hail from designated roadways, parking lots, sidewalks, walkways, and other common use areas and roadways. a) The Proposer must own, lease, or have immediate access to the following equipment: b) Additional equipment listed below may be requested at the Airport’s discretion. Schedule “B” Additional Equipment Quantity Front End Loader, Rubber Tire (2-4 yard bucket) ** 3 Equipment w/ 10’ plow & w/ 1.5-2.5 yard dry spreader (V-box) * 2 Equipment with 10’ Snow Pusher Box Blade ** 5 15-Yard Dump truck for hauling snow 3 Road Truck w/ 12’ plow and 5-7 yard dry spreader */** 2 Road Truck w/ 12’ plow and 1000 gallon liquid applicator */** 1 Sidewalk