BRIDGE REHABILITATION

expired opportunity(Expired)
From: Arizona Department of Transportation(Transportation)
A89-B-(217)T

Basic Details

started - 07 Nov, 2019 (about 4 years ago)

Start Date

07 Nov, 2019 (about 4 years ago)
due - 21 Jan, 2022 (about 2 years ago)

Due Date

21 Jan, 2022 (about 2 years ago)
Bid Notification

Type

Bid Notification
A89-B-(217)T

Identifier

A89-B-(217)T
Arizona Department of Transportation

Customer / Agency

Arizona Department of Transportation
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The proposed project 089A CN 387 H8778 01C is located in Coconino County within the Coconino National Forest on State Route 89A, MP 387.28 to MP 387.43. The work consists of Pumphouse Wash Bridge Rehabilitation. The work includes bridge deck and railing replacement, new approach slabs, painting of the bridge, pier encasement and scour mitigation; milling and repaving; guardrail replacement; restoration of a culvert outlet; signing and striping; seeding and other related work.

The proposed project 089A CN 388 H8907 01C is located in Coconino County within the Coconino National Forest on State Route 89A from MP 387.92 to MP 388.73 for location A and B and from MP 388.90 to MP 388.96 for Location C. The work consists of drainage and sediment control improvement by reducing erosion to preserve deteriorating slopes and reduce downstream pollution. The work includes installing concrete barrier, pipes, retaining wall and catch basin; gabion mattresses; roadside drainage excavation; seeding and other related work.

The proposed project 089A CN 375 F0154 01C is located in Coconino County on State Route 89A at MP 375.1 and MP 389.2. The work consists of improvements to mitigate rockfall at those locations, pavement improvements, pavement marking, traffic control and other related

1325 Alona's Way, Bullhead City, AZ 86442, United StatesLocation

Address: 1325 Alona's Way, Bullhead City, AZ 86442, United States

Country : United StatesState : Arizona

You may also like

Pavement Rehabilitation at the Brown Center

Due: 29 Mar, 2024 (Today)Agency: Washoe County School District

Pavement Rehabilitation of Multiple Roadways

Due: 18 Apr, 2024 (in 20 days)Agency: Pennsylvania Department of Conservation and Natural Resources

Pedestrian Bridge Replacement Design-Build

Due: 04 Apr, 2024 (in 6 days)Agency: City of Oshawa

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.