RVSD Athletic Facilities Phases 1, 2, and 3 Utility, Grading, Driveway, Walls, and Drainage Project

expired opportunity(Expired)
From: Pennsylvania(State)
River Valley School District, Indiana County

Basic Details

started - 19 Mar, 2023 (13 months ago)

Start Date

19 Mar, 2023 (13 months ago)
due - 21 Apr, 2023 (12 months ago)

Due Date

21 Apr, 2023 (12 months ago)
Bid Notification

Type

Bid Notification
River Valley School District, Indiana County

Identifier

River Valley School District, Indiana County
Pennsylvania

Customer / Agency

Pennsylvania
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

River Valley School District will be accepting bids for the Athletic Facilities Phases 1, 2, and 3 Utility, Grading, Driveway, Walls, and Drainage Project. The work scope for the RVSD Athletic Facilities Phases 1 and 2 Utility, Grading, Driveway, Walls, and Drainage Project: The project includes replacement of 8” existing Sanitary Main Sewer, new 8” Sanitary Main Sewer Alignment, 6” lateral reconnections, lateral wye and reconnections, sanitary manhole replacements, new sanitary manholes, with a doghouse and flat-top sanitary manhole. The storm culvert relocations will include two new inlet tie-ins to existing, as well as new 12”, 18”, 24”, and 36” SLCPP, inlets, storm manholes, a subgrade detention system using Modular Units encased with AASHTO No. 57 drainage aggregate, control structures using PADOT Type 4 and Type 5 double inlets with weirs, and precast end wall structures with rip-rap outlet aprons. An aggregate haul road, stockpile area, three (3) Sediment Basins, and borrow
area are to be completed and remain with restorations. Existing sidewalk and curb will be demolished for new Asphalt driveway pavements. A new Retaining Wall “1” will be constructed. The Bleacher Support Structure will be built for the Home Grandstand and Visitor Bleachers. The work also includes major topsoil removal, grading, as well as erosion controls to remain in place. Pavements and surfaces include seed restorations, as well as a new parking lot and driveway full depth with transitional hot mix asphalt pavements, and an 8” layer of compacted crushed limestone aggregate subgrade layer under a drainage subbase. The Contractor shall be responsible for the proper disposal of excavated sewer, structures, culvert, endwalls/headwalls, pavement, and restorations including reseeding associated with this project. The contractor will submit a proposal cost for the option alternates for underground detention and infiltration required by the owner, as well as proposal pricing for any Allowances that will be negotiated in accordance with the specifications. Contractor to coordinate with the Engineer for actual field locations of all construction items. Bidders shall review the Information for Bidders, General Conditions, and Special Conditions. Sealed bids are to be submitted online (www.PennBid.net) prior to Friday, April 21, 2023 at 10:00am, at which time they will be opened and read aloud for the River Valley School District at the offices of Remington & Vernick Engineers, 105 Braunlich Road, Pittsburgh, PA 15237 and displayed in summary on the PennBID website. Bid Bond of 10% required. Performance and Payment Bonds 100% required on Award. Warranty Bond for 2 years in 100% of contract required.There will be a Non-Mandatory Pre-Bid Meeting held Thursday, April 6, at 10:00 AM at the site of the project 102 School Lane, Blairsville, PA 15717, off of Cornell Road, off State Route 119. Number River Valley School District, Indiana County Title RVSD Athletic Facilities Phases 1, 2, and 3 Utility, Grading, Driveway, Walls, and Drainage Project Available Date 3/19/2023 12:00 AM Clarification Deadline 4/18/2023 11:13 AM Due Date 4/21/2023 10:00 AM Contact Information Bid Type Fixed Fee Contract

2221 Pacific Street,Bellingham,WA 98229Location

Address: 2221 Pacific Street,Bellingham,WA 98229

Country : United StatesState : Washington

You may also like

BAS Replacement Project - Group 3

Due: 29 Apr, 2024 (in 5 days)Agency: Dufferin Peel Catholic District School Board

North Street Gravity Sewer Improvements - Phases 2 and 3

Due: 07 May, 2024 (in 13 days)Agency: City of Pass Christian

BAS Replacement Project - Group 2

Due: 24 Apr, 2024 (Today)Agency: Dufferin Peel Catholic District School Board

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.