The intent of this special notice is to share the most current information available with respect to anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during fiscal year 2024.NOTE: This information includes projected requirements and schedules that are subject to change. All project information is subject to change as designs are refined and impacts are quantified.Principle features of work include various construction and repairs to existing dikes, revetments, chevrons, bendway weirs, and other river training structures at various locations. Additional land-based construction may include bank grading and dressing, excavation, placement of crushed stone blanket, riprap upper bank paving, placement of stone fill and stone paving in specified areas such as dike fields, revetments, and other locations along top bank and in overbank areas landward of top bank. Repairs to existing