BARREN RIDGE SWITCHING STATION TO HASKELL CANYON SWITCHING STATION LINE 1 UPGRADE PROJECT - JRD

expired opportunity(Expired)
From: Los Angeles World Airports(Airport)
39144

Basic Details

started - 19 Feb, 2020 (about 4 years ago)

Start Date

19 Feb, 2020 (about 4 years ago)
due - 31 Mar, 2020 (about 4 years ago)

Due Date

31 Mar, 2020 (about 4 years ago)
Bid Notification

Type

Bid Notification
39144

Identifier

39144
Los Angeles World Airports

Customer / Agency

Los Angeles World Airports
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

General Information BAVN ID: 39144 Category:ConstructionType: Request For Proposal Description: THE LOS ANGELES DEPARTMENT OF WATER AND POWER (LADWP) IS SOLICITING PROPOSALS FOR BARREN RIDGE SWITCHING STATION TO HASKELL CANYON SWITCHING STATION LINE 1 UPGRADE PROJECT. CONTRACTOR SHALL DEMOLISH AND HAUL AWAY THE REMAINING SEGMENTS OF THE EXISTING 51-MILE BARREN RIDGE SWITCHING STATION TO HASKELL CANYON SWITCHING STATION LINE 1 (BAR-HSK L1) CONDUCTORS, GROUND WIRE, INSULATORS HARDWARE ASSEMBLIES, STRUCTURES AND THE TOPS OF THE FOOTINGS BETWEEN THE BARREN RIDGE SWITCHING STATION AND HASKELL CANYON SWITCHING STATION. CONTRACTOR SHALL ALSO ENGINEER, DESIGN, PROCURE, AND CONSTRUCT NEW FOUNDATIONS AND TOWERS, INSTALL THREE (3) SINGLE ALUMINUM CONDUCTOR STEEL SUPPORTED (ACSS) ; AND INSTALL ONE (1) OVERHEAD GROUND WIRE FROM THE BARREN RIDGE S.S. TO THE HASKELL CANYON SWITCHING S.S. NAICS: 237130: Power and Communication Line and Related Structures Construction 238120: Structural Steel and Precast Concrete Contractors 327320: Ready-Mix Concrete Manufacturing 332312: Fabricated Structural Metal Manufacturing 335931: Current-Carrying Wiring Device Manufacturing 335932: Noncurrent-Carrying Wiring Device Manufacturing 541330: Engineering

111 North Hope Street Los Angeles, CA 90012Location

Address: 111 North Hope Street Los Angeles, CA 90012

Country : United StatesState : California

You may also like

​Fi​re Station #1 Roof Installation

Due: 08 May, 2024 (in 12 days)Agency: City of Ann Arbor

141551 - 141551 Rosamond Switching Station Modular Fire Barrier System

Due: 26 Apr, 2024 (Today)Agency: City of Los Angeles

​FIre Station #1 Roof Installation

Due: 08 May, 2024 (in 12 days)Agency: City of Ann Arbor

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.