Open 3 Q&A 935401-Prequalification of Prime Contractors for Long Term Neighbourhood/Streetscape Projects The City of Edmonton Loading... if (ariba_IR) ariba.Dom.removeRelocatedCopy(''); Posted On: 19 Oct 2023 Open for bidding on: 19 Oct 2023 Response Deadline: 30 Oct 2024 3:00 PM PDT Respond to Posting Add to Watchlist Not Interested Wrong product and service category Wrong ship-to or service location Other (Tell us why...) if (ariba_IR) ariba.Dom.removeRelocatedCopy('NotInterested'); | Share: Leave feedback Opportunity Amount: $0.00 USD Contract Length: 12 months Response Deadline: 30 Oct 2024 3:00 PM PDT (Buyers can close postings early) Posting ID: 17760059(Doc4234036954) Posting Type: Request for Information Public Posting: https://discovery.ariba.com/rfx/17760059 Product and Service Categories (10) Landscaping services Sidewalk or curb construction Asphalt Lighting pole or post and hardware
Landscape protection services View More Ship-to or Service Locations Edmonton - Alberta Posting Summary The City of Edmonton (the “City”) invites participants to submit responses for this Sourcing Event to prequalify participants for Neighbourhood/Alley Renewal and Streescape Renewal Construction projects which shall include the removal and replacement of sidewalk, curb and gutter (separate and monolithic structures), lane crossings, curb crossings, roadway milling, road base reconstruction, asphaltic concrete resurfacing, catch basin realignment and manhole adjustment, topsoil, sod, landscaping, low impact development features, streetlighting, streetscape features and related work on developed streets, according to the referenced plans, profiles, sections and details. The scope of work also includes improvements to open spaces (eg. pathways, planting beds, plazas, soft landscaping, etc.) as outlined in the referencedplans. The City intends to issue sourcing events to the prequalified participants in order toselect general contractors for some of the City’s multi-year projects starting in the 2024 construction season, using the Design Bid Build project delivery model and the City’s standard Design-Bid-Build contract (modified as needed for each particular project). The City may issue up to five (5) Covered Sourcing Events, if the capital budgets for the relevant projects are approved. The projected completion for these projects ranges from 2025 to 2027, depending upon the project. Questions & Answers Ask Buyer a question... Send