Gateway Park BLVD Bridge Widening Project

Gateway Park BLVD Bridge Widening Project(Expired)

Dates

Bid Notification started - 03 Jan, 2018 (10 months ago) - Gateway Park BLVD Bridge Widening Project

Start Date

03 Jan, 2018 (10 months ago)
Bid Notification due - 03 Jan, 2018 (10 months ago) - Gateway Park BLVD Bridge Widening Project

Due Date

17 Jan, 2018 (10 months ago)
Bid Notification - Gateway Park BLVD Bridge Widening Project

Opportunity Type

Bid Notification
B17181131050 - Gateway Park BLVD Bridge Widening Project

Opportunity Identifier

B17181131050
Bid Notification City of Sacramento - Gateway Park BLVD Bridge Widening Project

Customer / Agency

City of Sacramento
Bid Notification 915 I Street 2nd Floor Sacramento, CA 95814 - Gateway Park BLVD Bridge Widening Project

Location

915 I Street 2nd Floor Sacramento, CA 95814
From: Sacramento(City)
Project Name:Gateway Park BLVD Bridge Widening ProjectProject Type:BuildingOwnership:Public Project City, State:Sacramento, California Engineer's Estimated Cost:$1,440,000 to $1,440,000 Pre-Qualification for Bidders:Not RequiredProject/Contract Number:B17181131050Project Contact:
John Zellmer
City of Sacramento

915 I Street
2nd Floor
Sacramento, CA 95814
Tel:(916) 808-6240
Fax:(916) 808-6765
jzellmer@rja-gps.com Bid Due Date:01/17/18 Bid Due Time:2:00 PM Liquidated Damages: $3,650.00 Per Calendar Day Bid Bond Percentage: 10%  Non-Mandatory Pre Bid Conference Date:01/05/18 Pre Bid Conference Time :1:00 PM Pre Bid Conference Location:New City Hall, 2nd Floor, Conference Room 2105, 915 I Street,
Sacramento CA 95814 Project Description:Gateway Park BLVD Bridge Widening Project B17181131050

The proposed project consists of widening the Gateway Park Bridge to accommodate widening of Gateway Park Boulevard. The existing Gateway Park Bridge, which currently accommodates two lanes of traffic, would be expanded to four lanes of traffic with a median, bike lanes, and sidewalks. An existing concrete barrier and water utility line on the west side of the bridge would be removed as part of the project. The existing water utility line would be replaced with a new 12-inch water line on the western side of the bridge. Construction of the project would result in an increase in the total bridge width by 40-feet and three inches, to a total final width of 93 feet. The length of the bridge would remain unchanged with implementation of the proposed project. Ten 18-inch octagonal concrete pile-type piers and two abutments would be constructed to support the bridge expansion. In addition, a total of 0.09 acres of %-ton rock slope protection would be placed on both banks of the canal to stabilize the canal banks.

SELECT ONE OF THE FOLLOWING DELIVERY OPTIONS:
USPS/FEDEX/UPS/DHL OR PERSONAL HAND DELIVERY
Sacramento City Clerk’s Office
915 I Street, New City Hall
Public Counter - 5th Floor
Sacramento, CA 95814-2604

Copies of the Contract Documents are available at Planetbids:
http://www.planetbids.com/portal/portal.cfm?CompanyID=15300#


All questions should be submitted on-line via the Planet Bids website under the
"Q&A" tab 