PROJECT NO. 528A6-18-622 DEMO H-CAP RAMP, B-35 & B-78 VA MEDICAL CENTER, BATH, NY 7/19/2023 RFI Response DEMO H-CAP RAMP, B-35 & B-78/ NEW RAMP, B-76 & B-44 528A6-18-622 Question: There are 5 specs not included in the body of the document, are they being issued? Response: The missing specs that relate to the project have been added; removed 09 29 00 Gypsum Board as it doesn t relate to this project. Question: Is the curb being removed in this project? Response: The curb and asphalt are to be removed to the limits shown in the contract drawings. Question: Does the brick need to be keyed in for the door opening? Response: Yes, the interior and exterior brick needs to be keyed in when infilling the door