Operating Supplies (Stock)

expired opportunity(Expired)
From: Tacoma(City)
TW24-0081N

Basic Details

started - 25 Mar, 2024 (1 month ago)

Start Date

25 Mar, 2024 (1 month ago)
due - 01 Apr, 2024 (27 days ago)

Due Date

01 Apr, 2024 (27 days ago)
Bid Notification

Type

Bid Notification
TW24-0081N

Identifier

TW24-0081N
City of Tacoma

Customer / Agency

City of Tacoma
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Delivery date will default to two weeks ARO if vendor fails to provide. Please Circle or underline the part number and manufacturer quoted or bid may be considered non-responsive. If applicable, you must select from the approved manufacturer(s) listed. Substitutions will not be approved at the time of the bid awarding. If you have a material that you would like to have added, it must be submitted for review and approved by the City of Tacoma's Material Committee before the bid issue date listed on this request for quotation. For more information regarding this process, please contact: Merry Mitchell, mmitchell@cityoftacoma.org Responses MUST BE SUBMITTED on the provided City of Tacoma bid solicitation form. Vendor signature is MANDATORY. Bid results will be posted at: http://www.cityoftacoma.org/government/ci
ty_departments/finance/procurement_and_payables_division/purch asing/bid_results/ Note: You must register at this website as a bid holder for each solicitation of interest in order to receive notification regarding amendments or other updates to the original bid solicitation documents. City Contact: Anela Olson, aolson1@cityoftacoma.org 10 31864 2 EA RISER,56IN X 56IN X 6IN, VAULT,CONCRETE RISER, VAULT, CONCRETE, REINFORCED, CERTIFIED H-20 LOAD RATING, OUTSIDE DIMENSIONS- 56 INCHES X 56 INCHES X 6 INCHES HIGH. SIX (6)-INCH WALL THICKNESS. FLAT TOP AND BOTTOM, 5/8-INCH STAINLESS STEEL LIFT INSERTS ON TOP OF EACH CORNER WITH REMOVABLE PLASTIC PLUGS INSTALLED. CITY OF TACOMA THIS IS NOT AN ORDER All prices quoted shall be F.O.B. Destination, Freight Prepaid and Allowed Item # Material# Delivery QTY UM Net Price Total Description Date Page 2 of 6 All responses & inquiries must be plainly marked with this REQUEST FOR QUOTATION 6000052651 20 31866 2 EA 30 31867 2 EA 40 31428 126 FT RISER,56IN X 56IN X 12IN,VAULT,CONCRETE RISER, VAULT, CONCRETE, REINFORCED, CERTIFIED H-20 LOAD RATING, OUTSIDE DIMENSIONS- 56 INCHES X 56 INCHES X 12 INCHES HIGH. SIX (6) INCH WALL THICKNESS. FLAT TOP AND BOTTOM, 5/8-INCH STAINLESS STEEL LIFT INSERTS ON TOP OF EACH CORNER WITH REMOVABLE PLASTIC PLUGS INSTALLED. RISER,56IN X 56IN X 18IN,VAULT,CONCRETE RISER, VAULT, CONCRETE, REINFORCED, CERTIFIED H-20 LOAD RATING, OUTSIDE DIMENSIONS- 56 INCHES X 56 INCHES X 18 INCHES HIGH. SIX (6) INCH WALL THICKNESS. FLAT TOP AND BOTTOM, 5/8-INCH STAINLESS STEEL LIFT INSERTS ON TOP OF EACH CORNER WITH REMOVABLE PLASTIC PLUGS INSTALLED. PIPE,12IN,TYTON JOINT,DUCTILE IRON PIPE, 12", TYTON JOINT, DUCTILE IRON. SPECIAL THICKNESS CLASS 52. 18 FOOT LENGTHS. SBR TYTON JOINT. GASKETS. CEMENT MORTAR LINED PER ANSI/ AWWA C-104. MUST COMPLY WITH THE LATEST REVISION OF THE ANSI/AWWA C-111 AND C-151. Material # 10011413 Manf Part# Manufacturer Name U.S. PIPE US PIPE CITY OF TACOMA THIS IS NOT AN ORDER All prices quoted shall be F.O.B. Destination, Freight Prepaid and Allowed Item # Material# Delivery QTY UM Net Price Total Description Date Page 3 of 6 All responses & inquiries must be plainly marked with this REQUEST FOR QUOTATION 6000052651 MCWANE PIPE MCWANE DUCTILE10011412 50 46610 6 EA 60 50049 40 EA SLING, 6 FEET, POLYESTER, DOUBLE EYE SLING, 6 FEET, POLYESTER ROUND WITH ABRASION RESISTANT POLYESTER SLEEVE TO CREATE AN EYE AND EYE SLING. THE MINIMUM RATED CAPACITY SHALL BE 5,300 POUND VERTICAL, 4,200 POUND CHOKER, 10,600 POUND VERTICAL BASKET. ALL SLINGS SHALL HAVE DURABLE PERMANENTLY AFFIXED TAG THAT INDICATED THE RATED CAPACITY (WORKING LOAD LIMITS) IN VARIOUS CONFIGURATIONS. THE POLYESTER SLEEVE AND COVERS SHALL BE GREEN FOR EASY IDENTIFICATION. ADAPTER,1IN TO 2IN,METER,BRASS ADAPTER, METER, 1IN METER TO 2IN METER SETTER SIZE, INCLUDING GASKETS, BRASS. BRASS COMPONENTS THAT CONTACT POTABLE WATER MUST MEET NSF/ANSI 372. BRASS COMPONENTS THAT DO NOT CONTACT POTABLE WATER MAY BE MANUFACTURED WITH 85-5-5-5 BRASS, UNS NO C83600. Material # Manf Part# Manufacturer Name 10006773 710J47 A.Y. MCDONALD 10006774 A47NL FORD METER BOX CO CITY OF TACOMA THIS IS NOT AN ORDER All prices quoted shall be F.O.B. Destination, Freight Prepaid and Allowed Item # Material# Delivery QTY UM Net Price Total Description Date Page 4 of 6 All responses & inquiries must be plainly marked with this REQUEST FOR QUOTATION 6000052651 70 50110 32 EA ADAPTER,1-1/2IN TO 2IN,METER,BRASS ADAPTER, METER, 1-1/2 INCH METER TO 2 INCH METER SETTER SIZE, BRASS. BRASS COMPONENTS THAT CONTACT POTABLE WATER MUST MEET NSF/ANSI 372. BRASS COMPONENTS THAT DO NOT CONTACT POTABLE WATER MAY BE MANUFACTURED WITH 85-5-5-5 BRASS, UNS NO C83600. Material # Manf Part# Manufacturer Name 10006777 A67NL FORD METER BOX CO 10006776 710J67 A.Y. MCDONALD 80 57530 8 EASHOVEL,3IN X 11IN,11 GAUGE,PT,EXTRA HVY SHOVEL, 3IN X 11IN, 11 GAUGE, POINTED, EXTRA HEAVY DUTY, CLOSED BACK, STEEL HEAD WITH REINFORCING RIBS, 48IN WOOD HANDLE, MUST BE 3" WIDE. APPROVED: CORONA, TRENCH SHOVEL MODEL # SS64103 MIDWEST RAKE "BULLHEAD" MODEL #89023 KENYON 89023 OR APPROVED EQUAL. NOT ACCEPTABLE: WESTWARD 12U496 TRENCHING SHOVEL 4" X 11-3/4" CITY OF TACOMA THIS IS NOT AN ORDER All prices quoted shall be F.O.B. Destination, Freight Prepaid and Allowed Item # Material# Delivery QTY UM Net Price Total Description Date Page 5 of 6 All responses & inquiries must be plainly marked with this REQUEST FOR QUOTATION 6000052651 90 78667 100 EABOX,SMALL,METER,ARMORCAST BOX,METER,ROTOCAST,POLYMER CONCRETE FRAME,SMALL,NO MOUSE HOLE CUTOUT, MUST BE SMOOTH AND FREE OF CRACKS AND OTHER DEFECTS. MATERIAL WILL BE INSPECTED AND ALL DAMAGED AND/OR DEFECTIVE WORK SHALL BE RETURNED TO THE SUPPLIER AND REPLACED AT THEIR EXPENSE. BOX DIMENSIONS: 15-1/4IN X 22IN X 12IN OVERALL (WORKING AREA 17-5/8IN X 10-7/8IN). APPROVED: ARMORCAST P6000495T ******************************************** NO COVER ******************************************** Material # Manf Part# Manufacturer Name 78667 P6000495T ARMORCAST CITY OF TACOMA THIS IS NOT AN ORDER All prices quoted shall be F.O.B. Destination, Freight Prepaid and Allowed Net Value $ Plus Tax at __________% $ Total Amount $ Item # Material# Delivery QTY UM Net Price Total Description Date Page 6 of 6 All responses & inquiries must be plainly marked with this REQUEST FOR QUOTATION 6000052651 Standard Terms & Conditions, Form No. SPEC-190A Page 1 of 20 Rev.: 02/17/2023 CITY OF TACOMA STANDARD TERMS AND CONDITIONS GOVERNS BOTH GOODS AND SERVICES AS APPLICABLE In the event of an award by the City, these Terms and Conditions stated herein, Additional Contract Documents if issued, Solicitation if issued, Purchase Orders if issued by City, and Supplier's Submittal, if provided, shall constitute the Contract between City and Supplier for the acquisition of goods, including materials, supplies, and equipment or for the provision of services and deliverables. Said documents represent the entire Contract between the parties and supersede any prior oral statements, discussions, or understandings between the parties, and/or subsequent Supplier invoices. No modification of the Contract shall be effective unless mutually agreed in writing. The specific terms and conditions of any Solicitation (Specification, Request for Bids, Request for Proposals, Requests for Qualifications, Requests for Quotations, Request for Information, bid documents, request to enter into negotiations, or other form of solicitation issued by City including any general, special, or technical provisions associated with such Solicitations) are incorporated herein by reference and supersede these Terms and Conditions where there is conflict or inconsistency. In the event Additional Contract Documents are negotiated and agreed to in writing between Supplier and City, the specific terms of such Additional Contract Documents are incorporated herein by reference and supersede all other terms and conditions where there is conflict or inconsistency. These Terms and Conditions, Additional Contract Documents if issued, Solicitation if issued, City purchase order if issued, are controlling over Supplier’s Submittal if a Submittal is provided. Submittals if provided are incorporated herein by reference. 1.01 SUPPLIER / CONTRACTOR As used herein, “Supplier” or "Contractor" shall be the Supplier(s) entering a Contract with City, whether designated as a Supplier, Contractor, Vendor, Proposer, Bidder, Respondent, Seller, Merchant, Service Provider, or otherwise. 1.02 SUBMITTAL Submittal means Bids, Proposals, Quotes, Qualifications or other information, content, records or documents submitted in response to a City Solicitation. 1.03 FORMS OF SUBMITTAL Unless stated otherwise, all submittals must be in SAP Ariba and submitted exactly as specified or directed, and all required forms must be used. 1.04 COSTS TO PREPARE SUBMITTAL The City is not liable for any costs incurred by Supplier for the preparation of materials or a Submittal provided in response to a solicitation, conducting presentations to the City, or any other activities related to responding to the City’s Solicitation. 1.05 LICENSES/PERMITS A. Suppliers, if applicable, must have a Washington state business license at the time of Submittal and throughout the term of the Contract. Failure to include a Washington state business license may be grounds for rejection of the Submittal or cancellation of contract award. Information regarding Washington state business licenses may be obtained at http://bls.dor.wa.gov. B. Upon award, it is the responsibility of the Supplier to register with the City of Tacoma's Tax and License Division, 733 South Market Street, Room 21, Tacoma, WA 98402-3768, 253-591-5252, https://www.cityoftacoma.org/government/city_departments/finance/tax_and_license/. Supplier shall obtain a business license as is required by Tacoma Municipal Code Subtitle 6C.20. C. During the term of the Contract, Supplier, at its expense, shall obtain and keep in force any and all necessary licenses and permits. http://bls.dor.wa.gov/ https://www.cityoftacoma.org/government/city_departments/finance/tax_and_license/ Standard Terms & Conditions, Form No. SPEC-190A Page 2 of 20 Rev.: 02/17/2023 1.06 PUBLIC DISCLOSURE: PROPRIETARY OR CONFIDENTIAL INFORMATION A. Supplier Submittals, all documents and records comprising the Contract, and all other documents and records provided to the City by Supplier are deemed public records subject to disclosure under the Washington State Public Records Act, Chapter 42.56 RCW (Public Records Act). Thus, City may be required, upon request, to disclose the Contract and documents or records related to it unless an exemption under the Public Records Act or other laws applies. In the event CITY receives a request for such disclosure, determines in its legal judgment that no applicable exemption to disclosure applies, and Supplier has complied with the requirements to mark records considered confidential or proprietary as such requirements are stated below, City agrees to provide Supplier 10 days written notice of impending release. Should legal action thereafter be initiated by Supplier to enjoin or otherwise prevent such release, all expense of any such litigation shall be borne by Supplier, including any damages, attorneys’ fees or costs awarded by reason of having opposed disclosure. City shall not be liable for any release where notice was provided and Supplier took no action to oppose the release of information. B. If Supplier provides City with records or information that Supplier considers confidential or proprietary, Supplier must mark all applicable pages or sections of said record(s) as “Confidential” or “Proprietary.” Further, in the case of records or information submitted in response to a Request for Proposals, an index must be provided indicating the affected pages or sections and locations of all such material identified Confidential or Proprietary. Information not included in the required index will not be reviewed for confidentiality or as proprietary before release. If Supplier fails to so mark or index Submittals and related records, then the City, upon request, may release said record(s) without the need to satisfy the requirements of subsection A above; and Supplier expressly waives its right to allege any kind of civil action or claim against the City pertaining to the release of said record(s). C. Submission of materials in response to City’s Solicitation shall constitute assent by Supplier to the foregoing procedure and Supplier shall have no claim against the City on account of actions taken pursuant to such procedure. 1.07 SUSTAINABILITY A. The City has interest in measures used by its contractors to ensure sustainable operations with minimal adverse impact on the environment. The City seeks to do business with vendors that value community and environmental stewardship that help us meet our sustainable purchasing goals. B. The City encourages the use of environmentally preferable products or services that help to minimize the environmental and human health impacts of City operations. Suppliers are encouraged to incorporate environmentally preferable products or services into Submittals wherever possible. "Environmentally preferable" means products or services that have a lesser or reduced effect on human health and the environment when compared with competing products or services that serve the same purpose. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product or service. C. Environmental Standards. The City seeks to ensure that all purchases comply with current environmental standards and product specifications. Where appropriate, third party independent certifiers such as Green Seal and USEPA Standards shall be a minimum specification for products to the City, unless specified otherwise herein. D. The City encourages the use of sustainability practices and desires any awarded Suppliers to assist in efforts to address such factors when feasible for: 1. Pollutant releases 2. Toxicity of materials used 3. Waste generation 4. Greenhouse gas emissions, including transportation of materials and services 5. Recycle content 6. Energy consumption 7. Depletion of natural resources 8. Potential impact on human health and the environment Standard Terms & Conditions, Form No. SPEC-190A Page 3 of 20 Rev.: 02/17/2023 1.08 ALTERATIONS NOT ALLOWED Except as otherwise specifically provided in a Solicitation, Submittals that are incomplete or conditioned in any way, contain erasures, alternatives or items not called for, or not in conformity with law, may be rejected as being non-responsive. Any attempt to condition a Submittal by inserting exceptions to the Solicitation or any conditions, qualifications or additions that vary its terms may result in rejection of the Submittal. The City may reject any submittal containing a material deviation from the Solicitation. 1.09 CORRECTION OF AMBIGUITIES AND OBVIOUS ERRORS A. The City reserves the right to correct obvious errors in Supplier's Submittal. In this regard, if the unit price does not compute to the extended total price, the unit price shall govern. B. Supplier shall notify the City of Tacoma Procurement and Payables Division in writing of any ambiguity, conflict, discrepancy, omission or other error in a Solicitation no later than five business days prior to the submittal deadline. 1. For solicitations conducted in SAP Ariba, Supplier shall notify the City of Tacoma Procurement and Payables Division on the message board of the event. 2. For all other solicitations, Supplier shall notify the contract person listed in the Solicitation. C. The City will make necessary modifications by addendum. D. Supplier is responsible for identifying ambiguities, conflicts, discrepancies, omissions or other errors in the Solicitation prior to providing its Submittal or the ambiguity, conflict, discrepancy, omission, or other error is waived. Any Submittal that includes assumed clarifications and/or corrections without the required authentication of the same is subject to rejection. 1.10 WARRANTIES/GUARANTEE A. Suppliers warrant that all items, including services, as applicable: 1. Are merchantable. 2. Comply with the City's latest drawings and specifications. 3. Are fit for the City's intended use. 4. Will be performed according to the skill and care required by customarily accepted good practices and procedures followed by service providers rendering the same or similar type of service. 5. Are new and unused unless otherwise stated. 6. Comply with all applicable safety and health standards established for such products by the Occupational Safety and Health Administration (OSHA), Washington Industrial Safety and Health Act (WISHA) and/or Consumer Products Safety Act (CPSA), and all other applicable state and federal laws or agency regulations. 7. Are properly packaged and contain appropriate instructions or warnings, including applicable MSDS sheets. 1.11 PATENTS, TRADEMARKS AND COPYRIGHTS Suppliers warrant that equipment and/or materials furnished, including software, do not infringe on any patent, trademark or copyright, and agree to indemnify, defend and hold harmless, the City in the event of any infringement or claim thereof. 1.12 DELIVERY OF SUBMITTALS TO THE CITY’S PROCUREMENT AND PAYABLES DIVISION A. Submittal packages must be received by the City’s Procurement and Payables Division in SAP Ariba (unless another form of delivery is stated), prior to the scheduled time and date stated in the Solicitation. B. Supplier is solely responsible for timely delivery of its Submittal. C. Submittals received after the time stated in the solicitation will not be accepted. D. For purposes of determining whether a Submittal has been timely received in SAP Ariba, the City's Procurement and Payables Division will rely on the submittal clock in SAP Ariba. Standard Terms & Conditions, Form No. SPEC-190A Page 4 of 20 Rev.: 02/17/2023 1.13 SUBMITTAL IS NON-COLLUSIVE Supplier acknowledges that by its delivery of a Submittal to the City in response to a Solicitation, it represents that the prices in such Submittal are neither directly nor indirectly the result of any formal or informal agreement with another Supplier. 1.14 PARTNERSHIPS The City will allow firms to partner in order to respond to a Solicitation. Multiple suppliers may team under a Prime Supplier’s Submittal in order to provide responses to all sections in a single submission; however, each Supplier’s participation must be clearly delineated by section. The Prime Supplier will be considered the responding vendor and the responsible party at contract award. All contract negotiations will be conducted only with the Prime Supplier. All contract payments will be made only to the Prime Supplier. Any agreements between the Prime Supplier and other companies will not be a part of the Contract between the City and the Prime Supplier. The City reserves the right to select more than one Prime Supplier. 1.15 WITHDRAWAL OF SUBMITTALS A. Prior to Submittal Deadline. Submittals may be withdrawn (including in SAP Ariba) prior to the scheduled submittal deadline. B. After Submittal Deadline. No Submittal can be withdrawn after having been opened before the actual award of the contract, unless the award is delayed more than 90 calendar days beyond the date of opening. If a delay of more than 90 calendar days does occur, Supplier must submit written notice to the City purchasing manager that Supplier is withdrawing its submittal. 1.16 ACCEPTANCE OF SUBMITTALS A. If the solicitation announcement so states, submittals, unless previously withdrawn, will be read aloud, irrespective of any irregularities or informalities in such submittal, at the time and place specified in the solicitation announcement. B. All submittals must remain open for acceptance by the City for a period of at least 90 calendar days from the submittal deadline. 1.17 RIGHT TO REJECT The City of Tacoma reserves the right to reject any and all submittals, waive minor deviations or informalities, supplement, amend, reduce or otherwise modify the scope of work or cancel the solicitation, and if necessary, call for new submittals. 1.18 RESERVED RIGHTS A. By providing a submittal in response to a City solicitation, Supplier acknowledges and consents to the below City rights and conditions. With regard to this procurement process, the City reserves, holds without limitation, and may exercise, at its sole discretion, the following rights and conditions: 1. To terminate the procurement process or decide not to award a contract as a result thereof by written notice to the Suppliers for any reason whatsoever with or without substitution of another solicitation. 2. To waive any defect, technicality, or any other minor informality or irregularity in any submittal, or any other response from Suppliers. 3. To issue addenda for any purpose including: a. To make minor or major changes or alterations to the evaluation, selection and/or performance schedule(s) for any events associated with a procurement. b. To supplement, amend, reduce, cancel, or otherwise modify a Solicitation, including but not limited to modifications to the description of services and/or products contained in the solicitation, by omitting services/products and/or including services/products. 4. To request clarifications, additional information, and/or revised Submittals from one or more Suppliers.

747 Market Street Tacoma, WA 98402Location

Address: 747 Market Street Tacoma, WA 98402

Country : United StatesState : Washington

You may also like

Industrial/Janitorial Supplies (MRO) - Veritiv Operating Company

Due: 30 Jun, 2024 (in 2 months)Agency: Fort Hays State University

MAINTENANCE, REPAIR, OPERATING SUPPLIES(MRO)

Due: 30 Jun, 2024 (in 2 months)Agency: Department of General Services

MAINTENANCE, REPAIR, OPERATING SUPPLIES(MRO)

Due: 30 Jun, 2024 (in 2 months)Agency: Department of General Services

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.