for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-10 from a point 1.360 miles east of the SR-193 Interchange (MP 18.467) to the Wallace T...
(Expired)
From: Alabama Department of Transportation(Transportation)
Proposal 20220527010 for constructing the Micro-Milling, Resurfacing, and Traffic Stripe on I-10 from a point 1.360 miles east of the SR-193 Interchange (MP 18.467) to the Wallace Tunnel (MP 26.651) in Mobile. Length 8.272 mi. Proposal information tableDate Generated:05/02/2022Sections: 1 Date Revised: Amendments: 0Call Order: 010 Highway Number: Items: 45 Counties: MOBILE Project ID: IM-I010(349) Not available for contractor viewing until 05/02/2022. Not yet available for contractor viewing. You must be logged in to view item