DEPT OF DEFENSE (709065)DEPT OF THE NAVY (156983)NAVFAC (10916)NAVFAC ATLANTIC CMD (6597)NAVFAC MID-ATLANTIC (3667)NAVAL FAC ENGINEERING CMD MID LANT (3395)
Unlock the best of InstantMarkets.
Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.
This project includes bucket dredging of approximately 108,360 CY of mud and silt material at Pier R-3, Naval Weapons Station Yorktown, Yorktown, Virginia, along with incidental related work. An additional option is included to dredge approximately 87,027 CY of mud and silt material at Pier CAD-A, Naval Weapons Station Yorktown, Cheatham Annex, Williamsburg, Virginia along with incidental related work. Material dredged shall be safely transported via bottom dumping barge (or scow) and disposed within the Norfolk Ocean Disposal Site (NODS). The project schedule will allow for dredging work to be performed 24 hours/7 days per week and will require a minimum daily production rate of 2,500 CY per day. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=N4008522B2506' to obtain more