The Contractor shall furnish all necessary labor, material, equipment, and supervision toAccomplish the following work for the General Services Administration (GSA), at 601 E.12th Street Kansas City, MO 64106.All work shall be performed in accordance with following specifications.1. The Contractor will treat 1st floor with the Diamond Pad Buffing System: Thisconsists of approximately 11,464 square footage.2. All terrazzo floors, approximately 11,464SF shall be completely stripped andprepared for a diamond pad maintenance system such as 3M Stone FloorProtection System, or its equivalent.3. Contractor will re grout entire 1st floor 11,464 square footage with Terroxy skimcoating to fill in all defects and damages from wear and age to floor.4. After thoroughly preparing the floor, contractor shall apply the appropriatesealer, 3M Stone Floor Protection System or equivalent.5. COR must approve processes, materials, and chemicals before proceeding. Waxshall not be utilized on terrazzo
flooring.6. The old finish or wax shall be removed in accordance with standard commercialpractices. Spots shall be eliminated. There shall be no evidence of gum, bums,scuffmarks, or wax build-up in comers or crevices. UNDER NOCIRCUMSTANCES SHALL BURNISHING OR DRY STRIPPING METHODSBE USED ON ACBM FLOORING.7. Finishing Floors: Walls, baseboards, and other surfaces shall be free of finishresidue and marks from equipment. Floors shall be free of streaks, mop strandmarks, and skipped areas. The applied finished area shall have a uniform luster.8. The Contractor must provide a schedule of preparation and the Diamond Padapplication process for each floor and must be submitted to the COR by the PreConstruction meeting.9. Contractors shall visit the site and perform a thorough site inspection. Thecontractor shall inspect the site to become familiar with the existing conditionsrelating to the work to be performed and the difficulties and restrictions to thework to be performed.10. Drawings are intended only to provide visual representation of the design concept.11. Contractor shall field verify actual co