Richard Bolling Federal Building 1st Floor Terrazzo Honing & Polish

expired opportunity(Expired)
From: Federal Government(Federal)
47PG0622F9966

Basic Details

started - 20 Jul, 2022 (21 months ago)

Start Date

20 Jul, 2022 (21 months ago)
due - 08 Aug, 2022 (21 months ago)

Due Date

08 Aug, 2022 (21 months ago)
Bid Notification

Type

Bid Notification
47PG0622F9966

Identifier

47PG0622F9966
GENERAL SERVICES ADMINISTRATION

Customer / Agency

GENERAL SERVICES ADMINISTRATION (20145)PUBLIC BUILDINGS SERVICE (15818)PBS R6 (508)
[object Object]

SetAside

SBA(Total Small Business Set-Aside (FAR 19.5))

Attachments (6)

unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

The Contractor shall furnish all necessary labor, material, equipment, and supervision toAccomplish the following work for the General Services Administration (GSA), at 601 E.12th Street Kansas City, MO 64106.All work shall be performed in accordance with following specifications.1. The Contractor will treat 1st floor with the Diamond Pad Buffing System: Thisconsists of approximately 11,464 square footage.2. All terrazzo floors, approximately 11,464SF shall be completely stripped andprepared for a diamond pad maintenance system such as 3M Stone FloorProtection System, or its equivalent.3. Contractor will re grout entire 1st floor 11,464 square footage with Terroxy skimcoating to fill in all defects and damages from wear and age to floor.4. After thoroughly preparing the floor, contractor shall apply the appropriatesealer, 3M Stone Floor Protection System or equivalent.5. COR must approve processes, materials, and chemicals before proceeding. Waxshall not be utilized on terrazzo
flooring.6. The old finish or wax shall be removed in accordance with standard commercialpractices. Spots shall be eliminated. There shall be no evidence of gum, bums,scuffmarks, or wax build-up in comers or crevices. UNDER NOCIRCUMSTANCES SHALL BURNISHING OR DRY STRIPPING METHODSBE USED ON ACBM FLOORING.7. Finishing Floors: Walls, baseboards, and other surfaces shall be free of finishresidue and marks from equipment. Floors shall be free of streaks, mop strandmarks, and skipped areas. The applied finished area shall have a uniform luster.8. The Contractor must provide a schedule of preparation and the Diamond Padapplication process for each floor and must be submitted to the COR by the PreConstruction meeting.9. Contractors shall visit the site and perform a thorough site inspection. Thecontractor shall inspect the site to become familiar with the existing conditionsrelating to the work to be performed and the difficulties and restrictions to thework to be performed.10. Drawings are intended only to provide visual representation of the design concept.11. Contractor shall field verify actual co 

Kansas City ,
 MO  64106  USALocation

Place Of Performance : N/A

Country : United StatesState : MissouriCity : Kansas City

Classification

naicsCode 561790Other Services to Buildings and Dwellings
pscCode Z1AAMAINTENANCE OF OFFICE BUILDINGS