Upgrades to HVAC Systems to improve indoor air quality to include: replace HVAC control systems, replace hot water (HW) & chill water (CW) pumps, replace gas fi...

expired opportunity(Expired)
From: Robeson Community College(Higher Education)
119-NCCCS2674

Basic Details

started - 25 Jul, 2022 (20 months ago)

Start Date

25 Jul, 2022 (20 months ago)
due - 16 Aug, 2022 (19 months ago)

Due Date

16 Aug, 2022 (19 months ago)
Bid Notification

Type

Bid Notification
119-NCCCS2674

Identifier

119-NCCCS2674
Robeson Community College

Customer / Agency

Robeson Community College
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Page 1 of 3 DESIGN-BUILD: REQUEST FOR QUALIFICATIONS (RFQ) ADVERTISEMENT FOR OWNER (Adopted by the State Building Commission on June 25th, 2019) Department/Agency Robeson Community College Project Title Building 4 & 6 - HVAC Improvements Scope of Work Upgrades to HVAC Systems to improve indoor air quality to include: replace HVAC control systems, replace hot water (HW) & chill water (CW) pumps, replace gas fired boiler, and upgrade space temperature controls. Contact Robert Gooding Telephone (910) 272-3618 Email rgooding@robeson.edu Total Project Budget $2,000,000 Source of Funds Higher Education Emergency Relief Funds (HEERF) Approved OC-25 # NCCCS # 2674 Publish Date Monday - July 25, 2022 Closing Date Monday – August 15, 2022 Submit THREE (3) copies of qualifications information package (Mailing Address): PO Box 1420 Lumberton, NC 28359 Physical Location for Fed Ex/UPS delivery (Delivery Address): 5160 N. Fayetteville Rd
Lumberton, NC 28360 NC Licensing Statement In order to offer CONSTRUCTION Services (General Contracting, Electrical Contracting, Plumbing, Heating and Fire Sprinkler Contracting, or Landscape Contracting) and DESIGN Services (Architecture, Engineering, or Landscape Architecture) as part of the response to this RFQ, the proposing firms must be properly licensed to provide Construction Services and Design Services in the State of North Carolina. More information on the North Carolina state boards may be found at the following websites: CONSTRUCTION: NC Licensing Board for General Contractors: (https://nclbgc.org) NC State Board of Examiners of Electrical Contractors: (https://www.ncbeec.org) NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors: (https://www.nclicensing.org) NC Landscape Contractors’ Licensing Board: (https://nclclb.com) DESIGN: NC Board of Architecture: (http://www.ncbarch.org) NC Board of Examiners for Engineers and Surveyors: (http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org) https://nclbgc.org/ https://www.ncbeec.org/ https://www.nclicensing.org/ https://nclclb.com/ http://www.ncbarch.org/ http://www.ncbels.org/ http://www.ncbola.org/ Page 2 of 3 STATE BUILDING COMMISSION - SELECTING CRITERIA for DESIGN-BUILD In selecting the Design-Builder, the selection committee should take into consideration qualification information expressed by the Design-Builder in a package that includes the following: 1. Profile of each key firm on the team (design-builder, contractor(s), designer(s), etc.). Include firm history, ownership, description of services, location, staff size and record of successfully completed projects without major legal or technical problems. 2. Resume of each key personnel represented on the team (design-builder, contractor(s), designer(s), etc.). Identify licenses (with numbers) and qualifications. 3. Examples of experience in each of these areas: a. Projects with scope similar to proposed project, successfully completed by team members (firms and/or personnel). b. Design-Build projects successfully delivered by team members (firms and/or personnel). c. Collaboration between team members (firm and/or personnel). 4. Examples of recent experience with estimating project cost. Include examples of design-build projects with comparison between initial design-build estimate and final cost. 5. Examples of recent experience with adhering to project schedules. Include examples of design-build projects with comparison between initial schedule and final delivery date. 6. Understanding of the project location as exhibited by past experience in the geographic area and/or with the client. Indicate team’s proximity to the project area. 7. Quantifiable description of current workload and available resources to successfully complete this project. 8. Description, with examples if applicable, of process for successfully delivering this proposed project. Address each phase of project (design, pre-construction and construction). Include strategy for pre-qualifying construction subcontractors and obtaining competitive bidding; practices and procedures to ensure quality; and other factors that may be applicable. 9. Certifications: a. A letter, dated within the last 30 days, from your surety company, signed by their Attorney in Fact, verifying their willingness to issue sufficient payment and performance bonds for this project, on behalf of your firms or its agent licensed to do business in North Carolina, and verifying your company’s capability and capacity based on your current value of work. Surety company bond rating shall be rated “A” or better under the A.M. Best Rating system or The Federal Treasury List. b. HUB Participation: Describe the program (plan) that your company has developed to encourage participation by HUB firms to meet or exceed the goals set by North Carolina General Statute 143-128.2. Please explain how the firm will address minority participation in the management levels of the company. Include a HUB plan in the proposal. Provide documentation of HUB participation that the firm achieved over the past three (3) years on both public and private construction projects. Outline specific outreach efforts that your firm will take to notify HUB firms of opportunities for participation. Indicate the minority participation goal that you expect to achieve on the project. c. Written certification by the design-builder that each licensed design professional included as part of the team was selected based solely on qualifications without regard to fee. Include evidence that a qualifications-based selection (QBS) process was utilized. 10. Additional information as requested by the Owner or deemed appropriate by the Design-Builder. Page 3 of 3 STATE BUILDING COMMISSION - SELECTING CRITERIA for DESIGN-BUILD Proposing firms must submit THREE (3) copies of the qualifications information package. In the interest of cost-savings to the Design-Builders, consistency of the submittals and more efficient use of time by the pre-selection committee, the qualifications information package should not include any notebooks, binders, tab, clips, etc. The format should be 8-1/2" x 11" pages stapled in the upper left-hand corner. The qualifications information package should not exceed forty (40) single-sided pages or twenty (20) double-sided pages, not including the cover. E-mail and Fax submittals will not be accepted. For Design-Build projects, the minimum period of advertisement shall not be less than twenty-one (21) calendar days.

2 W Edenton St, Raleigh, NC 27601, USALocation

Address: 2 W Edenton St, Raleigh, NC 27601, USA

Country : United StatesState : North Carolina

You may also like

BUSH 41 - REPLACE CHILLED WATER PUMP PROJECT

Due: 22 Aug, 2027 (in about 3 years)Agency: NATIONAL ARCHIVES AND RECORDS ADMINISTRATION

Headquarters HVAC System Equipment and Chiller Plant Upgrades

Due: 24 Apr, 2024 (in 25 days)Agency: Professional Services

HVAC AND BOILER SYSTEMS REPLACEMENT

Due: 18 Sep, 2024 (in 5 months)Agency: ATF ACQUISITION AND PROPERTY MGMT DIV

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.