Addendum 2 to ITB 005-23

expired opportunity(Expired)
From: Fort Oglethorpe(City)
ITB 005-23

Basic Details

started - 24 Jun, 2023 (10 months ago)

Start Date

24 Jun, 2023 (10 months ago)
due - 11 Jul, 2023 (9 months ago)

Due Date

11 Jul, 2023 (9 months ago)
Bid Notification

Type

Bid Notification
ITB 005-23

Identifier

ITB 005-23
City of Fort Oglethorpe

Customer / Agency

City of Fort Oglethorpe
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

ADDENDUM NO. 2 City of Fort Oglethorpe Tennis Courts Date: 5 July 2023 Invitation to Bid (ITB) #005-23 Derthick Henley & Wilkerson Architects File: 2212 The following amendments to the specifications and/or revisions to the drawings shall be a part of the contract documents. Bidders, therefore, shall consider them when preparing cost estimates, and the contractors shall be bound by them. FRONT END 1. See attached revised Bid Bond Form showing 5% of the bid amount. SPECIFICATIONS The following sections are added to the specification: 1. 32 18 23 Tennis Pickleball Court Surfacing 2. 32 31 13 PVC COATED CHAIN LINK FENCES, POSTS, AND GATES DRAWINGS Sheet C100 – see narrative description of changes. Sheet C700 – see narrative description of changes. NARRATIVE See attached narrative for Addendum #2 REFERENCE REPORT OF GEOTECHNICAL EXPLORATION City of Fort Oglethorpe – Tennis Courts Gilbert‐Stephenson Park Fort Oglethorpe, Georgia GEOServices Project No. 41‐22615 13 BID BOND FORM KNOW ALL
MEN BY THESE PRESENTS THAT WE (Contractor) ______________________________________ as Principal, hereinafter called the Principal, and (Surety)_______________________________________, a corporation duly organized under the laws of the State of ________________________________ as Surety, hereinafter called the Surety, are held, and firmly bound unto City of Fort Oglethorpe, 500 City Hall Drive Fort Oglethorpe, GA 30742, Mayor Earl Gray as Obligee, hereinafter called Obligee, in the sum of five (5%) percent of the amount bid. for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for City of Fort Oglethorpe Tennis Courts, 19 Van Cleve Street, Fort Oglethorpe, Ga 30742 NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this _________day of _______________________, 202__. _____________________________________ (Principal) _____________________________ By: __________________________________ (Witness) (Title) _____________________________________ (Surety) ______________________________ By: __________________________________ (Witness) (Title) PERFORMANCE BOND FORM MARCH ADAMS & ASSOCIATES, INC. P.O. Box 3689 ∙ Chattanooga, TN 37404 Ph: (423) 698-6675 Fax: (423) 698-3638 marchadams@marchadams.com T:\2021\21280_Fort Oglethorpe Tennis Courts\DOCS\Narr-Addenda\Fort O Tennis Pickleball ADDENDUM 2.doc Page 1 of 4 PROJECT: Tennis Courts– Fort Oglethorpe, GA PROJECT NO. 21280 Narrative For Addendum #2 PREPARED BY: J Parks DATE: 7-05-2023 See the following bidder questions and clarifications listed below. 1.) I see there is a fence around the perimeter of the pickleball courts. Can you confirm that it is 10’ high? Response: See site plan C100 from addendum 1, with fence heights of 4’ and 10’. See addendum 2 revision to add an interior 4’ fence. 2.) Are there interior fences dividing the pickleball courts? There definitely should be but the plan does not show fences. If there are, where are they and how high? Response: See site plan C100 from addendum 2, with the addition of an interior 4’ fence. 3.) Also they show a double gate on the perimeter of the pickleball courts. The walkway is only 5’ wide? Response: The concrete walkway next to the double gate is wider (16’). 4.) Can you confirm the thickness of the asphalt and the stone on the new pickleball courts? It says 10’ of reclaimed asphalt? Response: See revised pickleball court section, with 6” of base stone, 2” of asphalt topping, then surface coating, per specification 32 18 23. 5.) For the double tennis court that is to be resurfaced: Is this just repairing the cracks and repainting? Response: See revised C100 with spec to mill and top with 1” asphalt topping and new playing surface coating. 6.) What are the specs to repair and paint courts? Response: See response above, paint per specification 32 18 23. 7.) The plans show a cross section of stone and asphalt for the tennis courts. Do the tennis courts get new net posts and nets? Response: Provide new tennis court nets and posts. Narrative Continued Page 2 of 4 8.) Tennis Courts: In order to complete the required full depth reclamation and paving work scope at the tennis courts, we will have to remove the existing fence. Should we assume installing new fence per the fence specified at the pickleball courts? Response: See response to question 5. We will not use FDR. Contractor shall protect the existing tennis court fence fabric and posts. Fabric can be removed and reinstalled if required for equipment access. 9.) Pickleball Courts: Cross section 1A/C700 calls for full depth reclamation of existing asphalt for the pickleball courts. With these requiring new construction, what stone base and paving profile will be required? Response: See response to question 4. 10.) Pickleball Courts: Fence design calls for 10’ fences with 1-3/4” mesh. Typical pickleball fences are 8’ with standard 2” mesh as a pickleball will not lodge in the mesh due to its size. This would provide cost savings for the owner. Response: Keep the fence height at 10’ and 4’. See revised specification 32 31 13 (2.04) (A) (2) for 2” mesh. 11.) What are the liquidated damages for the project? Response: Damages shall be assessed at $200 per working day. 12.) Is the grading Sub contractor required to have an Underground Utilities license? Response: The contractor installing the lights will need electrical license. 13.) Does this project require permits? If so, who is responsible for permitting and the associated fees? Response: Yes, the owner has applied for land disturbing permit and NOC from GA EPD. Contractor will be required to sign as primary permittee and provided Level 1A erosion control certified personal as required by the state. 14.) Who is responsible for inspections and materials testing and the associated fees? If the General Contractor is responsible for the testing, please provide all the testing requirements for this project. Response: The owner will engage a geotechnical testing company to provide testing for earthwork and asphalt. 15.) How would the owner want to address soft soil conditions and rocks, if encountered? Response: See specification 31 20 00. The project has classified excavation, with unit prices. Contractor shall provide units prices to establish allowances for each based on the quantities listed in the updated bid unit form in addendum 1 16.) When is the anticipated start date? Response: Middle of August 17.) Will weather days count against the project? Response: Contractor shall track days lots for weather, rain fall amounts, and scheduled work that was delayed. 18.) What’s the budget for this project? Response: The project is budgeted at $800,000 Narrative Continued Page 3 of 4 19.) Does this project have a Force Majeure clause? Response: Requests for additional contract time shall be submitted to the owner for review, with original project schedule, extreme event, and schedule impacts included in the report. Force Majeure will be considered when determining if liquated damages should be enforced. 20.) What are the working hours? Any restrictions that we should be aware of? Response: Note the following city ordinance. Construction work. The erection (including excavating), demolition, alteration or repair of any building in any residential district or section, the excavation of streets and highways in any residential district or section, other than between the hours of 7:00 a.m. and 6:00 p.m. on weekdays except in cases of urgent necessity, and then only with a permit from the city, which permit may be granted for a period not to exceed 60 days while the emergency continues. 21.) Any events or special dates at the park that we should stop our work for? Response: Access to the pool shall be maintained while it is open. Pool hours and events are listed at https://fortogov.com/gilbert-stephenson-park/ 22.) Can we work on the weekends? Response: See response to question 20 above. 23.) What are the requirements to safe-up the project site? Do you require the placement of chain- link fences, signages, and barricades? Response: See revised specification 31 10 00 addendum 1. 24.) Are there any vehicular traffic and/or pedestrian control requirements? Are there any signages required? Response: Contractor shall work with city to determined traffic control needs on an as needed basis. City can provide temporary signage if required. 25.) What are the requirements for staging areas/ contractor’s laydown area? Are there any designated parking areas for construction personnel? Any designated areas for dumpsters and equipment? Response: Contractor shall provide their recommended site logistics sketch for the owner to review. 26.) Is there any existing irrigation system within the construction areas? If there is, how would you want us to address it? Response: The team is not aware of any existing operating irrigation system. 27.) Do we have to use the services of a private underground utility locator for this project? Response: See specification 31 10 00 paragraphs 1.07, 1.08, & 3.04 28). Is there any activity on the site throughout the contract time involving the County’s staff and machinery? Response: No. 29.) Are there any restroom facilities on-site for the construction crew? Response: GC shall provide their own facilities, see sheet C505 for requirements to provided portable sanitary units. 30.) Does this project have a subsurface investigation? If so, is the geotechnical report available? Response: Yes. See the attached GEOServices report for reference Narrative Continued Page 4 of 4 31.) Can Milling materials that were removed from the existing asphalt parking lots be used as backfill materials? We have done this with a similar project in Rockdale County and was approved by the materials testing agency, which represents the County. Response: Proposed backfill material shall be tested by the owner’s geotechnical engineer. If the milling meet spec, then they can be used. 32.) Are there interior fences dividing the pickleball courts? If so, what are the specs? Response: See revised site plan C100. (4’ height, 2” mesh) 33.) Is the walkway between the pickleball courts 5’ wide? Response: Yes. See site plan C100. 34.) Can you please confirm the existing fence scope at the tennis courts that get repaired? The note on drawing C100 indicates "existing fence to be repaired where chain link fencing is bent on north end of courts". See attached photos of the existing conditions. All the fencing around the entire courts is bent. Please confirm we are just re-fencing the north side only. Response: Yes. Bid should included repaired fabric on north end of court. If bends can’t be satisfactorily repaired, as determined by architect, then new fabric shall be provided. Note mesh for tennis court if replaced shall be 1-3/4” The following amendments to the specifications and/or revisions to the drawing shall be considered part of the contract, and shall replace documents by the same name. Section 32 31 13 PVC Coated Chain Link Fences 1. Paragraph 2.04 revised to make proposed fence fabric 2” mesh. SHEET C100 1. Revised to list separate detail references for tennis and pickleball courts pavement sections 2. A 4’ fence has been added between the north and south row of pickleball courts SHEET C700 1. Revised fence detail to use 2” mesh fabric 2. Revised court paving details. 2212 / City of Fort Oglethorpe 32 18 23 - 1 TENNIS PICKLEBALL COURT SURFACING New Tennis Courts SECTION 32 18 23 TENNIS PICKLEBALL COURT SURFACING PART 1 GENERAL 1.1 SECTION INCLUDES A. Asphalt tennis court surface color coating system. 1.2 RELATED REQUIREMENTS A. Section 32 11 00 – Subgrade and Base Course Preparation B. Section 32 12 16 – Hot Mix Asphalt Paving 1.3 REFERENCE STANDARDS A. American Sports Builders Association (ASBA). B. United States Tennis Association (USTA) Rules of Tennis. C. ASBA/USA Pickleball Construction Manual 1.4 SUBMITTALS A. Comply with Section 01 33 00 – Submittal Procedures. B. Product Data: Submit manufacturer’s product data, including surface and crack preparation and application instructions. C. Samples: Submit manufacturer’s color samples of color coating. D. Test Reports: 1. Submit independent test results for solar reflectance index. 2. Submit independent test results for 2000 Hour ASTM G154, accelerated weathering UV test, to demonstrate long-term durability and fade resistance. 3. Submit independent test results for 2000 Hour, accelerated weathering ASTM G155 Xenon Arc test, to demonstrate long-term fade resistance and quality of pigment. E. Manufacturer’s Certification: Submit manufacturer’s certification that materials comply with specified requirements and are suitable for intended application. F. Manufacturer’s Project References: Submit manufacturer’s list of successfully completed asphalt tennis court surface color coating system projects, including project name, location, and date of application. G. Applicator’s Project References: Submit applicator’s list of successfully completed asphalt tennis court surface color coating system projects, including project name, location, type and quantity of color coating system applied, and date of application. H. Warranty Documentation: Submit manufacturer’s standard warranty. I. Authorized Installer Certificate: Submit manufacturer’s authorized installer certificate. 2212 / City of Fort Oglethorpe 32 18 23 - 2 TENNIS PICKLEBALL COURT SURFACING New Tennis Courts 1.5 QUALITY ASSURANCE A. Manufacturer’s Qualifications: 1. Manufacturer regularly engaged, for past 5 years, in manufacture of asphalt tennis court surface color coating systems of similar type to that specified. 2. United States owned company. 3. Member: ASBA. 4. Manufacturer has surfaces that are classified by the ITF’s (International Tennis Federation) pace classification program. B. Applicator's Qualifications: 1. Applicator regularly engaged, for past 3 years, in application of tennis court surface color coating systems of similar type to that specified. 2. Employ persons trained for application of tennis court surface color coating systems. 3. Applicator must be authorized installer of the surfacing brand used. 1.6 DELIVERY, STORAGE, AND HANDLING A. Delivery and Acceptance Requirements: Deliver materials to site in manufacturer’s original, unopened containers and packaging, with labels clearly identifying product name and manufacturer. B. Storage and Handling Requirements: 1. Store and handle materials in accordance with manufacturer’s instructions. 2. Keep materials in manufacturer’s original, unopened containers and packaging until application. 3. Store materials in clean, dry area indoors. 4. Store materials out of direct sunlight. 5. Keep materials from freezing. 6. Protect materials during storage, handling, and application to prevent contamination or damage. 7. Close containers when not in use. 8. Retain manufacturer batch codes on each container and application dates, for warranty purposes. 1.7 AMBIENT CONDITIONS A. Do not apply asphalt tennis court surface color coating system when air or surface temperatures are below 50°F (10°C) during application or within 24 hours after application. B. Do not apply asphalt tennis court surface color coating system when rain is expected during application or within 24 hours after application. PART 2 PRODUCTS 2.1 MATERIALS A. Asphalt Tennis Court Surface Color Coating System: SportMaster Color Coating System. B. Crack Sealant: SportMaster “Crack Magic”. 1. 100 percent acrylic emulsion elastomeric crack sealant. 2. Seals cracks up to 1/2 inch wide in asphalt pavement. 3. Weight per Gallon at 77 Degrees F: 8.8 lbs., plus or minus 0.5 lbs. 4. Non-Volatile Material: 61 percent, plus or minus 5 percent. 5. Color: Match Finished Surface Color C. Crack Filler: SportMaster “Acrylic Crack Patch”. 1. 100 percent acrylic emulsion trowel-grade crack filler. 2. Fills cracks in asphalt pavement up to 1 inch wide. 3. Chemical Characteristics, by Weight, Minimum: 2212 / City of Fort Oglethorpe 32 18 23 - 3 TENNIS PICKLEBALL COURT SURFACING New Tennis Courts a. Acrylic Emulsion: 10.0 percent. b. Hiding Pigment: 0.2 percent. c. Mineral Inert Fillers: 78.0 percent. d. Film Formers, Additives: 1.8 percent. e. Water: 8.5 percent. 4. Weight per Gallon at 77 Degrees F: 15.2 lbs., plus or minus 1.0 lbs. 5. Non-Volatile Material: 80 percent, plus or minus 5 percent. 6. Color: Match Finished Surface Color D. Patch Binder: SportMaster “Acrylic Patch Binder”. 1. 100 percent acrylic emulsion liquid binder. 2. Mix on-site with sand and cement. 3. Levels and repairs low spots and depressions up to 3/4 inch deep in asphalt pavement. 4. Fills Cracks in Asphalt up to 1” in width. 5. Weight per Gallon at 77 Degrees F: 8.8 lbs., plus or minus 0.5 lbs. E. Color Coating: SportMaster “ColorPlus System”. 1. 100 percent acrylic emulsion coating. 2. Mix on-site with silica sand and water. 3. Color coats tennis and multipurpose courts. 4. Weight per Gallon at 77 Degrees F: 9.2 lbs., plus or minus 0.5 lbs. 5. Color: Maroon out of bounds and Green in bounds (submit samples for owner review) F. Line Markings Primer: SportMaster “Stripe-Rite”. 1. 100 percent acrylic emulsion primer, clear drying. 2. Primes line markings and prevents bleed-under for sharp lines. 3. Chemical Characteristics, by Weight, Nominal: a. Acrylic Emulsion: 38.0 percent. b. Hiding Pigment: 0.0 percent. c. Mineral Inert Fillers: 7.0 percent. d. Film Formers, Additives: 1.5 percent. e. Water: 50.0 percent. 4. Weight per Gallon at 77 Degrees F: 8.9 lbs., plus or minus 0.5 lbs. 5. Non-Volatile Material: 29 percent, plus or minus 5 percent. H. Line Paint: SportMaster “Textured Line Paint”. 1. Pigmented, 100 percent acrylic emulsion line paint. 2. Line marking on asphalt tennis courts. 3. Chemical Characteristics, by Weight, Nominal: a. Acrylic Emulsion: 25.89 percent. b. Pigment: 14.90 percent. c. Mineral Inert Fillers: 13.12 percent. d. Additives: 4.73 percent. e. Water: 41.36 percent. 4. Weight per Gallon at 77 Degrees F: 10.65 lbs., plus or minus 0.75 lbs. 5. Non-Volatile Material: 45.17 percent, plus or minus 5 percent. 6. Color: White. PART 3 EXECUTION 3.1 EXAMINATION A. Examine asphalt tennis court surfaces to receive color coating system. C. Verify asphalt tennis & pickleball courts meet ASBA construction requirements. 2212 / City of Fort Oglethorpe 32 18 23 - 4 TENNIS PICKLEBALL COURT SURFACING New Tennis Courts C. Notify Architect of conditions that would adversely affect application or subsequent use. D. Do not begin surface preparation or application until unacceptable conditions are corrected. 3.2 SURFACE PREPARATION A. Protection of In-Place Conditions: Protect adjacent surfaces and landscaping from contact with asphalt tennis court surface color coating system. B. Prepare surfaces in accordance with manufacturer’s instructions. C. Cure new asphalt surfaces a minimum of 14 to 30 days before application of asphalt tennis court surface color coating system. D. Remove dirt, dust, debris, oil, grease, vegetation, loose materials, and other surface contaminants which could adversely affect application of asphalt tennis court surface color coating system. Pressure wash entire surface. E. Repair cracks, depressions, and surface defects in accordance with manufacturer’s instructions before application of filler course and color coating. F. Level depressions 1/8 inch and deeper with patch binder in accordance with manufacturer’s instructions. G. Apply 1 or 2 coats of filler course as required by surface roughness and porosity to provide smooth underlayment for application of color coating. H. Ensure surface repairs are flush and smooth to adjoining surfaces. 3.3 APPLICATION A. Apply asphalt tennis court surface color coating system in accordance with manufacturer’s instructions at locations indicated on the Drawings. B. Mix materials in accordance with manufacturer’s instructions. C. Apply Filler Course and Color Coating with a 50-60 durometer, soft rubber squeegee. D. Filler Course: 1. Apply 2 coats on new asphalt or existing acrylic surfaces with extensive cracks or low spot repair. 2. Apply 1 coat on existing acrylic surfaces with minimal repairs. E. Color Coating: Apply a minimum of 2 coats of color coating to prepared surfaces in accordance with manufacturer’s instructions. F. Allow material drying times in accordance with manufacturer’s instructions before applying other materials or opening completed surface to foot traffic. 3.4 LINE MARKINGS A. Lay out tennis court and pickle ball line markings in accordance with USTA Rules of Tennis and applicable rules of pickle ball. B. Apply line markings primer, after masking tape has been laid, to seal voids between masking tape and tennis court surface to prevent bleed-under when line paint is applied. C. Apply a minimum of 1 coat of line paint in accordance with manufacturer’s instructions. 3.5 PROTECTION 2212 / City of Fort Oglethorpe 32 18 23 - 5 TENNIS PICKLEBALL COURT SURFACING New Tennis Courts A. Allow a minimum of 24 hours curing time before opening courts for play. B. Protect applied asphalt court surface color coating system to ensure that, except for normal weathering, coating system will be without damage or deterioration at time of Substantial Completion. END OF SECTION 2212 / City of Fort Oglethorpe 32 31 13 - 1 PVC COATED CHAIN LINK FENCES, New Tennis Courts POSTS, AND GATES SECTION 32 31 13 PVC COATED CHAIN LINK FENCES, POSTS AND GATES PART 1 - GENERAL 1.01 SCOPE A. Summary: The work covered by this section includes furnishing all labor, materials, and equipment required to install Class 2b Fused and Adhered, Poly Vinyl Chloride (PVC) Coated, Steel Chain Link Fence, including all excavation, concrete, and accessories, as shown on the Drawings or specified herein. B. General: Like items of materials provided hereafter shall be the end products of one manufacturer in order to achieve standardization for appearance, maintenance and replacement. C. Delivery, Storage and Handling: Deliver material to the site in an undamaged condition. Carefully store material off the ground to provide proper protection against oxidation caused by ground moisture. 1.02 SUBMITTALS A. Shop Drawings: Include complete details of fence and gate construction, fence height, post spacing, dimensions and unit weights of framework and concrete footing details. Actual samples and certificates of compliance may be requested. B. Product Data: Provide manufacturer's catalog cuts with printed specifications. Manufacturer shall provide certification of compliance with material specifications. Actual samples of the material may be requested. 1.03 STANDARDS A. ASTM B 6 Slab Zinc B. ASTM F567 Installation of Chain Link Fence C. ASTM F668 Poly(Vinyl Chloride) (PVC) and Other Organic Polymer-Coated Steel Chain Link Fence Fabric, Class 2b D. Federal Specification RR-F-191K/1D Fencing, Wire and Post Metal (Chain-Link Fence Fabric), Type IV E. American Association of State Highway Transportation Officials (AASHTO) M-181 Chain Link Fence, Type IV, Class A F. ASTM F1043 Strength and Protective Coating on Metal Industrial Chain Link Fence Framework Group I-A and Group I-C Heavy Industrial G. ASTM F934 Standard Colors for Polymer-Coated Chain Link Fence Materials H. Federal Specification RR-F-191K/3D Fencing, Wire and Post Metal (Chain-Link Fence Posts, Topsails and Braces), Class 1, Grade A or B I. American Association of State Highway Transportation Officials (AASHTO) M-181 Chain Link Fence, Grades 1 and 2 PART 2 - PRODUCTS 2.01 FENCE FABRIC A. The base metal of the chain link fence fabric shall be composed of commercial quality, medium-carbon galvanized (zinc coated) steel wire. The vinyl coating shall be thermally bonded to a thermoset-bonding layer over a galvanized steel wire. Vinyl coating thickness, coating weight, and wire tensile strength conform to Federal specification RR-F-191K/1D, ASTM F668, Class 2b and (AASHTO) M-181, Type IV, Class A, as shown in Table 1. The 2212 / City of Fort Oglethorpe 32 31 13 - 2 PVC COATED CHAIN LINK FENCES, New Tennis Courts POSTS, AND GATES wire is PVC coated before weaving, is free and flexible at all joints, and is knuckled at both selvages. Table 1-PVC Coated Steel Wire Characteristics Zinc Coated Core Wire Size PVC Coated Finished Wire Size PVC Coated Wire Allowable Variance Core Wire Zinc Coating Weight, Min PVC Coating Thickness Breaking Strength, minimum Tensile Strength, min ga inch mm ga Inch mm oz/ft2 g/m2 Inch mm lbf N ksi MPa 9 0.148 3.76 8 +- 0.005 +-0.13 0.30 92 0.006 to 0.010 0.15 to 0.25 1,290 5,740 75 515 B. Coating: Only plasticized poly(vinyl chloride) (PVC) with a low temperature (-20°C, -4°F) plasticizer and no extenders or extraneous matter other than the necessary stabilizers and pigments, is used. The PVC coating resists attack from prolonged exposure to dilute solutions of most common mineral acids, seawater, and dilute solutions of most salts and alkali. The vinyl coating is thermally bonded to a thermoset-bonding layer over a galvanized steel wire. The wire is PVC coated before weaving and is free and flexible at all joints. C. Color: Shall Conform to ASTM F934, Black 2.02 FENCE POSTS AND RAILS A. The base metal of the posts and rails shall be commercial steel conforming to ASTM F1043 Group I-A and I-C, Heavy Industrial Fence, and also conform to Federal specification RR-F- 191, Class 1, Grades A and B and ASSHTO M181 Grades 1 and 2. The thickness of the PVC coating shall be a minimum 0.010 to 0.015 in. B. Coating: Only plasticized poly(vinyl chloride) (PVC) with a low temperature (-20°C, -4°F) plasticizer and no extenders or extraneous matter other than the necessary stabilizers and pigments, is used. The PVC coating resists attack from prolonged exposure to dilute solutions of most common mineral acids, seawater, and dilute solutions of most salts and alkali. 2.03 FITTINGS A. Fittings and other accessories shall be zinc-coated (galvanized) pressed steel, cast steel or malleable iron, as specified and are coated with matching PVC by the same process as post and rails. PVC coating thickness shall be a minimum 0.006 mils. Painted fittings are not acceptable. B. Color: Shall Conform to ASTM F934, Black 2.04 FENCE MATERIALS A. Fabric Fused and Adhered Poly(Vinyl Chloride)-PVC Coated Steel Chain Link Fence Fabric 1. 9 gauge zinc coated core wire with 8 gauge PVC coated finished wire size 2. 2.00-inch mesh 3. Knuckled at both selvages unless otherwise specified. B. Posts: Steel pipe, ASTM F1043, capped 1. Line post: 2 1/2 inch O.D. 2. Corner, end, angle, and pull posts: 3 inch O.D., Schedule 40 3. Gate posts, 4 inch O.D. Schedule 40 C. Top rail: 1 5/8 inch O.D., with expansion couplings spaced at not less than 10 feet intervals. 2212 / City of Fort Oglethorpe 32 31 13 - 3 PVC COATED CHAIN LINK FENCES, New Tennis Courts POSTS, AND GATES D. Mid rail: 1 5/8 inch O.D., with expansion couplings spaced at not less than 10 feet intervals. E. Bottom rail: 1 5/8 inch O.D., with expansion couplings spaced at not less than 10 feet intervals. F. Fittings: pressed steel, cast steel or heavy malleable iron. 2.05 GATE A. Pedestrian Type: 4 foot minimum, single swing B. Frames 1. 2 inch O.D. pipe 2. Material: Galvanized steel. 3. Construction: Welded corners or assembled with corner fittings and 3/8-inch steel truss rods. 4. Provide horizontal 2 inch brace rail and 3/8-inch truss rod for gates 5 feet wide or greater. 5. Provide vertical 2 inch brace rail for gates 6 feet wide or wider, spacing not to exceed 5-foot centers. C. Hinges 1. Standard type. 2. Size to accommodate gate frame and post. D. Latches 1. Industrial gate latch with drop rod or center stop. 2. See plan for latches at playgrounds E. Keepers 1. Mechanical keeper for each gate leaf. 2. Secure free end of gate when in full open position. 2.06 CONCRETE A. Posts shall be placed in masonry wall as shown on the details. Concrete shall be a min. 3000 psi. PART 3 - EXECUTION 3.01 PREPARATION A. Verify that final grading in fence location is complete without irregularities, which would interfere with fence installation. B. Measure and lay out complete fence line. C. Locate line posts at equal distance spacing, not exceeding 10-foot centers. D. Use corner posts at positions where fence changes direction more than 10 degrees. E. Contractor to grout entire length of masonry wall to the top of last block after installation of fence posts, fabric, and net poles. 3.02 INSTALLATION A. Install Fence, Fence Posts and Gates in accordance with ASTM practice 567. 3.03 ADJUST AND CLEAN A. Adjust brace rails for rigid installation. B. Tighten hardware, fasteners and accessories. C. Level and smooth all disturbed areas. END OF SECTION 30 98 28 5 6 7 8 11 9 9 9 8 8 FENCE 1' OFFSET INSIDE OF PAVEMENT C700 C700 2 CONCRETE SIDEWALK TYP. ON SITE C700 2 C700 3TENNIS COURT NET POST, TYP NET ANCHOR, TYPC700 4 CRACK CONTROL & EXPANSION JOINTS AS SHOWN 7 C700 RESURFACE AND RESTRIPE FOR TWO TENNIS COURTS MILL THEN APPLY NEW ASPHALT TOP COAT AND COLOR SYSTEM TO MATCH PICKLEBALL C700 1190° PARKING TYP ONSITE SAWCUT & PAVEMENT TRANSITION CONC. EXTRUDED CURB, TYP ONSITE 6 C700 7 C700 TIE TO EX. SIDEWALK WITH EXPANSION JOINT 7 C700 REPAVE WITH LIGHT DUTY ASPHALT TO MATCH EX. ASPHALT ONCE PICKLEBALL COURTS HAVE BEEN CONSTRUCTED AND NO HEAVY MACHINERY IS REQUIRED TO CROSS ASPHALT TRACK AGAIN APPROXIMATE LOCATION OF EX. 8" DIP WATER, CONTRACTOR TO FIELD VERIFY 12" DEPRESSION & 12" TAPER OF CONC. EXTRUDED CURB 10 C700 12" DEPRESSION & 12" TAPER OF CONC. EXTRUDED CURB 10 C700 PRE-CAST CONC. CURB STOP, TYP. WHERE SHOWN 13 C700 EXISTING FENCE TO BE REPAIRED WHERE CHAIN LINK FENCING IS BENT ON NORTH END OF COURTS. N1802975.68 E1971097.77 N1802989.30 E1970828.11 PROPOSED 12 NEW PICKLEBALL COURTS TIE PROP. CURB INTO EX. (LOCATION OF EX. CURB APPROX. AS THERE IS NO SURVEY IN THIS LOCATION) RETAIN EX. CURB (LOCATION APPROX.) IF LOT IS ABLE TO BE CONSTRUCTED WITH SHOWN DIMENSIONS (NO SURVEY IN THIS LOCATION) ADA PARKING SIGN & SYMBOL TYP, 3-PLACES 12 C700 LOCATION OF EX. CURB APPROX. AFTER THIS POINT 2" CAL. DBH CLASS I SHADE TREES WHERE SHOWN. USE 3 SPECIES MINIMUM AT LANDSCAPE CONTRACTOR'S OPTION SUBMIT SPECIES FOR APPROVAL FROM LIST IN SEC 4.7 TABLE 4-C CITY OF FORT. OGLETHORPE UDC C700 1APICKLEBALL COURT ASPHALT PAVEMENT EQ EXISTING POOL AND BUILDING TO REMAIN CONCRETE SIDEWALK FLUSH WITH ASPHALT PAVEMENT CONC. EXTRUDED CURB, TYP ONSITE 6 C700 ADA PARKING SIGN & SYMBOL TYP, 2-PLACES 12 C700 SIDEWALK DRAIN 9 C700 N1802549.23 E1970646.93 N1802416.43 E1970639.63 CRACK CONTROL & EXPANSION JOINTS AS SHOWN 7 C700 EQ 4' GATE DOUBLE GATE 4' GATE APPROXIMATE LOCATION OF EX. 8" DIP WATER, CONTRACTOR TO FIELD VERIFY STANDARD DUTY ASPHALT PARKING PAVING, WHERE SHADED 15 C700 STANDARD DUTY ASPHALT PARKING PAVING, WHERE SHADED 15 C700 COLD MILL 1" AND ADD 1.5" HOT MIX ASPHALT TOPPING OVER EXISTING ASPHALT WHERE HATCHED SAWCUT & PAVEMENT TRANSITION 14 C700 SEVEN SCREENING EVERGREEN TREES 6' HEIGHT MIN. 40 SPACING PICK SPECIES FROM TABLE 4-E IN UDC. 25 FT STREAM BUFFER TO NOT BE DISTURBED AS MEASURED FROM EDGE OF STREAM BEGIN 10' FENCE BEGIN 10' FENCE 10' FENCE 10' FENCE BEGIN 10' FENCE BEGIN 10' FENCE 4' FENCE 4' FENCE 4' FENCE 4' FENCE 4' FENCE C700 1TENNIS COURT ASPHALT PAVEMENT LEGEND Know what's below. before you dig.Call R MAA CIVIL CONTACT: MICHAEL HUTCHERSON, P.E. DIRECT LINE: 423-664-1484 1 Revisions : Key Plan Title: Sheet No. Scale: ALL DRAWINGS AND WRITTEN MATERIAL CONSTITUTE ORIGINAL WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT CONSENT OF THE ARCHITECT. © 2022 DHW ARCHITECTS, ALL RIGHTS RESERVED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A L B C D E F G H J K 1001 Carter Street - Chattanooga - 37402 423 | 266 | 4816 www.dhw-architects.com New Tennis Courts Date: 05/09/2023 Drawn: JP File: 2212 Gilbert-Stephenson Park 19 Van Cleve Street Fort Oglethorpe, GA March Adams& Associates Consulting Engineers 310 Dodds Ave. P.O. Box 3689 Chattanooga, Tennessee 37404 PH: (423)698-6675 MAA #21280 GSWCC QR CODE NORTH SITE STAKING C100 ADDENDUM 1 2 ADDENDUM 2 6-21-23 7-05-23 2 2 2 AutoCAD SHX Text BH-6 AutoCAD SHX Text BH-4 AutoCAD SHX Text W AutoCAD SHX Text W AutoCAD SHX Text BH-3 AutoCAD SHX Text BH-2 AutoCAD SHX Text BH-1 AutoCAD SHX Text W AutoCAD SHX Text ELECTRIC CONTROL PANEL AutoCAD SHX Text W AutoCAD SHX Text 1. AutoCAD SHX Text 2. AutoCAD SHX Text x FFE=719.14 AutoCAD SHX Text x FFE=718.68 AutoCAD SHX Text ELECTRIC CONTROL PANEL AutoCAD SHX Text SHED AutoCAD SHX Text SHED AutoCAD SHX Text OVERHANG WITH CONCRETE UNDER AutoCAD SHX Text GRAVEL AutoCAD SHX Text CONCRETE AutoCAD SHX Text CONC. AutoCAD SHX Text CONC. AutoCAD SHX Text CONC. AutoCAD SHX Text TOP=716.88 AutoCAD SHX Text INV=708.58 AutoCAD SHX Text 18" RCP AutoCAD SHX Text SS AutoCAD SHX Text TOP=716.29 AutoCAD SHX Text 24" RCP AutoCAD SHX Text INV=708.09 AutoCAD SHX Text INV=708.43 AutoCAD SHX Text INV=708.44 AutoCAD SHX Text 8" PVC AutoCAD SHX Text UNABLE TO DETERMINE TERMINUS AutoCAD SHX Text INV=707.84 AutoCAD SHX Text TOP=715.54 AutoCAD SHX Text 24" RCP AutoCAD SHX Text TOP=719.88 INV=713.40 AutoCAD SHX Text TOP=721.78 INV=717.13 AutoCAD SHX Text 8" CLAY AutoCAD SHX Text TOP=717.81 AutoCAD SHX Text FL=716.71 AutoCAD SHX Text TOP=718.03 FL=715.78 AutoCAD SHX Text 6" PVC AutoCAD SHX Text TOP=715.71 AutoCAD SHX Text FL=713.76 AutoCAD SHX Text 4" PVC AutoCAD SHX Text FL=714.15 AutoCAD SHX Text FL=713.90 AutoCAD SHX Text 4" PVC AutoCAD SHX Text TENNIS COURT AutoCAD SHX Text ASPHALT AutoCAD SHX Text ASPHALT AutoCAD SHX Text CONCRETE AutoCAD SHX Text CONCRETE AutoCAD SHX Text GATE AutoCAD SHX Text CONCRETE AutoCAD SHX Text CONCRETE AutoCAD SHX Text GATE AutoCAD SHX Text CONCRETE AutoCAD SHX Text CONCRETE AutoCAD SHX Text 3 SPACES AutoCAD SHX Text 3 SPACES AutoCAD SHX Text CURB (TYP.) AutoCAD SHX Text CURB (TYP.) AutoCAD SHX Text CONCRETE AutoCAD SHX Text CURB (TYP.) AutoCAD SHX Text CONCRETE AutoCAD SHX Text FENCE AutoCAD SHX Text FENCE AutoCAD SHX Text GATE AutoCAD SHX Text FENCE AutoCAD SHX Text FENCE AutoCAD SHX Text FENCE AutoCAD SHX Text FENCE AutoCAD SHX Text FENCE AutoCAD SHX Text ASPHALT AutoCAD SHX Text BRIDGE AutoCAD SHX Text BRIDGE AutoCAD SHX Text FL=719.30 AutoCAD SHX Text 8"PVC AutoCAD SHX Text TOP=715.94 AutoCAD SHX Text FL=713.71 AutoCAD SHX Text FL=713.57 AutoCAD SHX Text 18" PVC AutoCAD SHX Text 6" PVC AutoCAD SHX Text FL=715.73 AutoCAD SHX Text FL=715.81 AutoCAD SHX Text BUILDING LINE AutoCAD SHX Text BUILDING LINE AutoCAD SHX Text CONC. AutoCAD SHX Text *NOTE: RIPRAP ALONG DITCH AutoCAD SHX Text H AutoCAD SHX Text Y AutoCAD SHX Text D AutoCAD SHX Text DE - NEW DRAINAGE EASEMENT (SEE PLAN FOR WIDTH). AutoCAD SHX Text SSE - NEW PUBLIC SANITARY SEWER EASEMENT (SEE PLAN FOR WIDTH). AutoCAD SHX Text L/A BUFFER - NEW LANDSCAPE BUFFER (SEE PLAN FOR WIDTH AND TYPE). AutoCAD SHX Text %%UABBREVIATIONS: AutoCAD SHX Text FFE - FINISHED FLOOR ELEVATION AutoCAD SHX Text TW - FINISH GRADE AT TOP OF RETAINING WALL AutoCAD SHX Text BW - FINISHED GROUND GRADE AT BOTTOM OF RETAINING WALL AutoCAD SHX Text FYSB- FRONT YARD SETBACK/ AutoCAD SHX Text SYSB -SIDE YARD SETBACK / RYSB-REAR YARD SETBACK AutoCAD SHX Text Ex. Irrigation Line AutoCAD SHX Text Ex. Water Line AutoCAD SHX Text Ex. Centerline AutoCAD SHX Text Ex. Sanitary Sewer Force Main AutoCAD SHX Text Ex. Sanitary Sewer Line AutoCAD SHX Text Ex. Ditch Centerline AutoCAD SHX Text Ex. Swale Centerline AutoCAD SHX Text Ex. Underground Telephone AutoCAD SHX Text Ex. Underground Fiber Optics AutoCAD SHX Text Ex. Underground Electrical AutoCAD SHX Text Ex. Overhead Elect. or Utility Line AutoCAD SHX Text Ex. Gas Line AutoCAD SHX Text Ex. Curb AutoCAD SHX Text Ex. Fence AutoCAD SHX Text Ex. Fire Line AutoCAD SHX Text LANDSCAPE BUFFER LINE AutoCAD SHX Text PROP. FENCE LINE AutoCAD SHX Text CURB AutoCAD SHX Text LOT LINE AutoCAD SHX Text CENTERLINE AutoCAD SHX Text ROW LINE AutoCAD SHX Text PROPERTY LINE AutoCAD SHX Text BUILDING LINE AutoCAD SHX Text EASEMENT LINE AutoCAD SHX Text BUILDING SETBACK LINE AutoCAD SHX Text MAP REVISED 9/11/2009. BASE FLOOD VARIES 717.7-718.7 AutoCAD SHX Text FROM THE FIRM MAP COMMUNITY-PANEL NUMBER 13047C0009E, AutoCAD SHX Text FLOOD ZONE "AE" AS SCALED AutoCAD SHX Text PORTIONS OF THE PROPERTY ARE LOCATED IN AutoCAD SHX Text %%UFLOODZONE: AutoCAD SHX Text REGULAR H'CAP SPACES: AutoCAD SHX Text 4 AutoCAD SHX Text STREET ADDRESS: AutoCAD SHX Text SUPPLY AVAILABILITY: AutoCAD SHX Text STORM DRAINAGE: AutoCAD SHX Text POTABLE WATER AutoCAD SHX Text SANITARY SEWER AVAILABILITY: AutoCAD SHX Text TOTAL PARKING PROVIDED: AutoCAD SHX Text %%UVAN ACCESSIBLE H'CAP SPACES: AutoCAD SHX Text REGULAR PARKING SPACES: AutoCAD SHX Text LAND DISTURBANCE AREA: AutoCAD SHX Text SITE AREA: AutoCAD SHX Text SITE IS ZONED: AutoCAD SHX Text TAX MAP PARCEL #: AutoCAD SHX Text PROPERTY OWNER: AutoCAD SHX Text %%USITE INFORMATION: AutoCAD SHX Text CITY OF FORT OGLETHORPE AutoCAD SHX Text 147 SPACES AutoCAD SHX Text %%U1 AutoCAD SHX Text 102 NEW + 40 OVERLAID=142 AutoCAD SHX Text OF THE PROPERTY. AutoCAD SHX Text AN EXISTING BLACK BRANCH TO THE EAST AutoCAD SHX Text NA AutoCAD SHX Text NA AutoCAD SHX Text 19 VAN CLEVE ST. FORT OGLETHORPE, GA AutoCAD SHX Text 0003-G-001 AutoCAD SHX Text 3.0%%P ACRES AutoCAD SHX Text MUNCIPAL PROPERTY (MP) AutoCAD SHX Text 13.42 ACRES AutoCAD SHX Text STORM DRAINAGE WILL DISCHARGE INTO AutoCAD SHX Text WE - NEW PUBLIC WATER EASEMENT (SEE PLAN FOR WIDTH). AutoCAD SHX Text SDCO / SSCO - STORM DRAINAGE / SANITARY SEWER CLEAN-OUT AutoCAD SHX Text DS - ROOF DOWNSPOUT CONNECTION AutoCAD SHX Text SSWL-SINGLE SOLID WHITE LINE, DSYL- DOUBLE SOLID YELLOW LINE AutoCAD SHX Text SDWL-SINGLE DASHED WHITE LINE AutoCAD SHX Text 0 AutoCAD SHX Text 30' AutoCAD SHX Text 30' AutoCAD SHX Text 60' AutoCAD SHX Text Scale 1" = 30' AutoCAD SHX Text LOCATION MAP AutoCAD SHX Text N.T.S. AutoCAD SHX Text NORTH AutoCAD SHX Text SITE AutoCAD SHX Text BATTLEFIELD PKWY AutoCAD SHX Text ALAMAR ST AutoCAD SHX Text VAN CLEVE ST AutoCAD SHX Text GLEN ST AutoCAD SHX Text NORRIS ST AutoCAD SHX Text HOWARD CIR AutoCAD SHX Text PHILLIPS DR AutoCAD SHX Text HOWARD DR AutoCAD SHX Text TALLEY CIR AutoCAD SHX Text STEPHENSON DR AutoCAD SHX Text GILBERT CIR AutoCAD SHX Text GILBERT DR AutoCAD SHX Text ROBERTSON DR AutoCAD SHX Text ROBERT E LEE ST AutoCAD SHX Text SHELBY ST AutoCAD SHX Text GRACE AVE AutoCAD SHX Text WALKER AVE AutoCAD SHX Text FORREST RD AutoCAD SHX Text EATON CIR Revisions : Key Plan Title: Sheet No. Scale: ALL DRAWINGS AND WRITTEN MATERIAL CONSTITUTE ORIGINAL WORK OF THE ARCHITECT AND MAY NOT BE DUPLICATED, USED, OR DISCLOSED WITHOUT CONSENT OF THE ARCHITECT. © 2022 DHW ARCHITECTS, ALL RIGHTS RESERVED 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A L B C D E F G H J K 1001 Carter Street - Chattanooga - 37402 423 | 266 | 4816 www.dhw-architects.com New Tennis Courts Date: 05/09/2023 Drawn: JP File: 2212 Gilbert-Stephenson Park 19 Van Cleve Street Fort Oglethorpe, GA March Adams& Associates Consulting Engineers 310 Dodds Ave. P.O. Box 3689 Chattanooga, Tennessee 37404 PH: (423)698-6675 MAA #21280 GSWCC QR CODE SITE NOTES: 1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE BEGINNING CONSTRUCTION. 2. FOR EXACT BUILDING DIMENSIONS SEE ARCHITECTURAL PLANS. 3. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY & ARE NOT TO BE USED TO LAYOUT FOOTINGS. REFER TO THE STRUCTURAL DRAWINGS FOR FOUNDATION INFORMATION. 4. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB, FACE OF SIDEWALK, OR FACE OF BUILDING UNLESS NOTED OTHERWISE. 5. A 1' CURB TAPER SHALL BE FORMED AT ALL PLACES WHERE CURB & GUTTER MEETS AN ADJACENT CONCRETE SIDEWALK OR PARKING AREA WHICH IS 0.5' LOWER THAN THE TOP OF CURB ELEVATION. 6. REFER ALSO TO GENERAL NOTES FOR ADDITIONAL REQUIREMENTS. DEMOLITION NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING DEMOLITION PERMITS AS WELL AS OTHER ASSOCIATED PERMITS PRIOR TO CONSTRUCTION. 2. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY & ARE NOT TO BE USED TO LAYOUT FOOTINGS. REFER TO THE STRUCTURALDRAWINGS FOR FOUNDATION INFORMATION. 3. ALL DEMOLITION DIMENSIONS SHOWN ARE APPROXIMATE & SHALL BE FIELD VERIFIED PRIOR TO CONSTRUCTION. 4. THE CONTRACTOR SHALL SAW-CUT TIE-INS AT EXISTING PAVEMENT OR CONC. AREAS AS NECESSARY TO ENSURE SMOOTH TRANSITIONS. THE CONTRACTOR SHALL SAW-CUT AND TRANSITION TO MEET EXISTING PAVEMENT AS NECESSARY & AS DIRECTED BY THE INSPECTOR TO ENSURE POSITIVE DRAINAGE (TYPICAL AT ALL INTERSECTIONS). INSTALL EXPANSION JOINTS AT ALL CONC. SAW-CUT TIE-INS. 5. ALL EXISTING TREES, VEGETATION & ORGANIC TOPSOIL SHALL BE STRIPPED & REMOVED FROM THE CONSTRUCTION AREA, AS REQUIRED. 6. EXISTING STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED, OR RELOCATED AS REQUIRED. COORDINATE WITH PROPER AUTHORITIES AND/OR UTILITY COMPANIES. 7. REFER ALSO TO GENERAL NOTES FOR ADDITIONAL REQUIREMENTS. DRAINAGE & GRADING NOTES: 1. CONTRACTOR SHALL OBTAIN ALL PERMITS BEFORE CONSTRUCTION BEGINS. 2. NEW FINISHED CONTOURS SHOWN ARE TOP OF NEW PAVING IN AREAS TO RECEIVE PAVEMENT & TOP OF TOPSOIL IN AREAS TO BE SEEDED. 3. PROPOSED CONTOUR INTERVALS ARE AS LABELED. ALL PROPOSED CONTOURS ARE FINISHED GRADE. 4. CONTRACTOR SHALL NOTIFY & COOPERATE WITH ALL UTILITY COMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFORE DISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAID FACILITIES. CONTRACTOR SHALL PAY ALL COSTS IN CONNECTION WITH THE ALTERNATION OF OR RELOCATION OF THE FACILITIES. CONTRACTOR SHALL RAISE OR LOWER TOPS OF EXISTING MANHOLES AS REQUIRED TO MATCH FINISHED GRADES. 5. A QUALIFIED SOILS LABORATORY SHALL DETERMINE THE SUITABILITY OF THE EXISTING SUB-GRADE & EXISTING ON SITE MATERIAL PRIOR TO BEGINNING ANY FILLING OPERATION. 6. UNUSABLE EXCAVATED MATERIALS (SOIL) SHALL BE RESPREAD ON SITE AT LOCATIONS APPROVED BY THE ARCHITECT. ALL WASTE RESULTING FROM DEMOLITION, CLEARING & GRUBBING SHALL BE DISPOSED OF OFF SITE BY THE CONTRACTOR AT AN APPROVED LOCATION. 7. BEFORE ANY MACHINE WORK IS DONE, CONTRACTOR SHALL STAKE OUT & MARK THE ITEMS ESTABLISHED BY THE SITE PLAN. CONTROL POINTS SHALL BE PRESERVED AT ALL TIMES DURING THE COURSE OF THE PROJECT. LACK OF PROPER WORKING POINTS AND GRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH POINTS & GRADES HAVE BEEN PLACED TO THE OWNER'S SATISFACTION. 8. COMPACTION OF THE BACK FILL OF ALL TRENCHES SHALL BE COMPACTED TO THE DENSITY OF 95% OF THEORETICAL MAXIMUM DRY DENSITY (ASTM D698). BACK FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, OR OTHER FOREIGN DEBRIS & SHALL BE PLACED AT OR NEAR OPTIMUM MOISTURE. CORRECTION OF ANY TRENCH SETTLEMENT WITHIN A YEAR FROM THE DATE OF APPROVAL WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 9. THE CONTRACTOR WILL INSURE THAT POSITIVE & ADEQUATE DRAINAGE IS MAINTAINED AT ALL TIMES WITHIN THE PROJECT LIMITS. THIS MAY INCLUDE, BUT NOT BE LIMITED TO, REPLACEMENT OR RECONSTRUCTION OF EXISTING DRAINAGE STRUCTURES THAT HAVE BEEN DAMAGED OR REMOVED OR RECONSTRUCTED AS REQUIRED BY THE ENGINEER, EXCEPT FOR THOSE DRAINAGE ITEMS SHOWN AT SPECIFIC LOCATIONS IN & HAVING SPECIFIC PAY ITEMS IN THE DETAILED ESTIMATE. NO SEPARATE PAYMENT WILL BE MADE AT ANY COSTS INCURRED TO COMPLY WITH THIS REQUIREMENT. 10. THE CONTRACTOR SHALL PROVIDE ANY EXCAVATION & MATERIAL SAMPLES NECESSARY TO CONDUCT REQUIRED SOIL TESTS. ALL ARRANGEMENTS & SCHEDULING FOR THE TESTING SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 11. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL VERIFY EXISTING GRADES ESPECIALLY WITHIN & ALONG DRAINAGE WAYS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES PRIOR TO COMMENCEMENT OF WORK. 12. UNLESS OTHERWISE SPECIFIED, ALL SLOPES TO BE COVERED WITH MINIMUM OF 4" TOPSOIL. 13. MAXIMUM EMBANKMENT SLOPES TO BE AS FOLLOWS: CUT AREA - 3:1; FILL AREAS 3:1 (UNLESS NOTED OTHERWISE). 14. STOCKPILED TOPSOIL IS TO BE SPREAD OVER LAWN AREAS AT COMPLETION OF PROJECT (PROVIDE 4" MINIMUM SPREAD). IT IS THE INTENT OF THIS PROJECT FOR THE CONTRACTOR TO VERIFY & MATCH EXISTING CONDITIONS UNLESS OTHERWISE NOTED. 15. THE CONTRACTOR SHALL NOTIFY THE ENGINEER/ARCHITECT OF ANY ITEMS THAT DO NOT EXIST AS SHOWN. 16. STORM DRAIN PIPE TO BE CLASS III REINFORCED CONCRETE CONFORMING TO ASTM C-76, OR CMP, FULLY COATED (16 GAGE MIN.) PER ASTM A44, OR ADS N-12 WITH WATERTIGHT GASKET AS SHOWN ON DRAWINGS. 17. PRE CAST STRUCTURES MAY BE USED AT THE CONTRACTORS OPTION. ALL CONCRETE TO HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3000 P.S.I. 18. CONTRACTOR SHALL BLEND ALL SLOPES WITH THE SURROUNDING ENVIRONMENT. 19. THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT ENGINEER FOR ANY FIELD GRADE ADJUSTMENTS NEEDED DUE TO ACTUAL TOPOGRAPHY VARYING FROM THE TOPOGRAPHIC SURVEY 20. REFER ALSO TO GENERAL NOTES FOR ADDITIONAL REQUIREMENTS. CENTER STRAP ANCHORDETAIL:4 C700 NET POSTDETAIL:3 C700 7 C700 DETAIL:EXPANSION JOINTS TYPICAL SIDEWALK CONSTRUCTION JOINT TYPICAL SIDEWALK EXPANSION JOINT TYPICAL SIDEWALK CONTROL JOINT TYP. CONSTRUCTION, CONTROL & TYPICAL CONCRETE PAVING CONSTRUCTION JOINT TYPICAL CONCRETE PAVING CONTROL JOINT TYPICAL CONCRETE PAVING EXPANSION JOINT TYPICAL CONCRETE PAVING CONSTRUCTION JOINT w/PREFORMED METAL KEY CHAIN LINK FENCE DETAIL:8 C700 Site Notes & Details C700 TAPER OR TRANSITION CONCRETE EXTRUDED CURB C700 10 DETAIL: EXTRUDED CONCRETE CURB TAPER CONCRETE SIDEWALKDETAIL: STD. CONCRETE SIDEWALK 5 C700 CONCRETE TURNDOWN SIDEWALK CONCRETE SIDEWALK ADJACENT TO CURB CONCRETE SIDEWALK FLUSH w/ PAVEMENT GENERAL NOTES: 1. THESE DRAWINGS DO NOT PURPORT TO LOCATE ALL UTILITIES. 2. ALL UTILITY LOCATIONS TO BE FIELD VERIFIED BY PROPER AGENCIES BEFORE BEGINNING CONSTRUCTION. UNDERGROUND UTILITIES ARE NOT FIELD LOCATED NOR ARE ALL PURPORTED TO BE SHOWN. INFORMATION SHOWN SHOULD BE CONSIDERED APPROXIMATE. CONTRACTOR TO CONTACT ALL UTILITY COMPANIES TO HAVE UTILITIES FIELD LOCATED BEFORE EXCAVATION OR DEMOLITION WORK BEGINS. 3. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHOWN HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES WITHIN THE WORKING AREA BEFORE COMMENCING WORK & AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE & PRESERVE ANY & ALL UNDERGROUND UTILITIES. 4. THE CONTRACTOR SHALL COORDINATE LOCATION & INSTALLATION OF ALL UNDERGROUND UTILITIES & APPURTENANCES TO MINIMIZE DISTURBING CURB & GUTTER, PAVING, EXISTING UTILITIES & COMPACTED SUBGRADE. 5. CONTRACTOR SHALL VERIFY EXISTING UTILITY LINE OR EXISTING INFRASTRUCTURE PRIOR TO BEGINNING WORK. CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES ON THE DRAWING OR IN THE FIELD BEFORE BEGINNING WORK OR DURING CONSTRUCTION. 6. CONTRACTOR TO COORDINATE ALL WORK WITH OTHER UTILITY INSTALLATIONS NOT COVERED IN THESE PLANS (ELECTRIC, TELEPHONE, GAS, CABLE, ETC.) & ALLOW FOR THEIR OPERATIONS & CONSTRUCTION TO BE PREPARED. 7. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE OWNERS REPRESENTATIVE OR ENGINEER OF ANY DISCREPANCIES OR ERRORS HE DISCOVERS IN THE PLAN. 8. DEVIATION FROM THESE PLANS & NOTES WITHOUT THE PRIOR CONSENT OF THE OWNERS REPRESENTATIVE MAY BE CAUSE FOR THE WORK TO BE UNACCEPTABLE. 9. ALL WORK SHALL COMPLY WITH APPLICABLE STATE, FEDERAL, AND LOCAL CODES, & ALL NECESSARY LICENSES & PERMITS SHALL BE OBTAINED BY THE CONTRACTOR AT HIS EXPENSE UNLESS PREVIOUSLY OBTAINED BY THE OWNER/DEVELOPER. 10. FOR ANY WORK IN THE STATE OR CITY RIGHT-OF-WAY, THE CONTRACTOR SHALL: A. NOT STORE MATERIAL, EXCESS DIRT OR EQUIPMENT ON THE SHOULDERS OF PAVEMENT; IN THE CASE OF MULTI-LANE HIGHWAYS, IN THE MEDIAN STRIPS. THE PAVEMENT SHALL BE KEPT FREE FROM ANY MUD OR EXCAVATION WASTE FROM TRUCKS OR OTHER EQUIPMENT. ON COMPLETION OF THE WORK, ALL EXCESS MATERIAL SHALL BE REMOVED FROM THE RIGHT-OF-WAY. B. PROVIDE ALL NECESSARY & ADEQUATE SAFETY PRECAUTIONS SUCH AS SIGNS, FLAGS, LIGHTS, BARRICADES & FLAG MEN AS REQUIRED BY THE LOCAL AUTHORITIES & IN ACCORDANCE WITH THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR & HOLD HARMLESS THE CITY OF FORT OGLETHORPE & THE OWNER FROM ANY CLAIMS FOR DAMAGE DONE TO EXISTING PRIVATE PROPERTY, PUBLIC UTILITIES, OR TO THE TRAVELING PUBLIC. C. COMPLETE THE WORK TO THE SATISFACTION OF THE CITY OF FORT OGLETHORPE OR DOT AND OBTAIN A LETTER FROM THE DEPARTMENT STATING THAT THE WORK IS ACCEPTABLE. D. POST NECESSARY BONDS AS REQUIRED BY THE CITY AND/OR STATE. 11. ALL WORK & MATERIALS SHALL COMPLY WITH CITY OF FORT OGLETHORPE REGULATIONS & CODES OF O.S.H.A. STANDARDS. 12. A MINIMUM CLEARANCE OF TWO FEET SHALL BE MAINTAINED BETWEEN THE FACE OF CURB & ANY PART OF A TRAFFIC SIGNAL OR LIGHT POLE. 13. NECESSARY & SUFFICIENT BARRICADES, LIGHTS, SIGNS & OTHER TRAFFIC CONTROL MEASURES AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC SHALL BE PROVIDED & MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD. 14. CONTRACTORS SHOULD NOT BE DOING ANY OPEN BURNING OF CONSTRUCTION MATERIALS OR DEBRIS WITHOUT A PERMIT FROM THE DEPARTMENT OF AIR POLLUTION CONTROL OR LOCAL AUTHORITY. IF A CONTRACTOR DESIRES TO PERFORM OPEN BURNING, HE MUST BE RESPONSIBLE FOR OBTAINING ANY PERMITS AND IS RESPONSIBLE FOR ANY VIOLATION OF THE AIR POLLUTION LAWS. 15. CONTRACTOR SHALL BE RESPONSIBLE DURING CONSTRUCTION FOR THE CONTINUOUS MAINTENANCE OF SEDIMENT & EROSION CONTROL MEASURES AS CALLED FOR ON THE DRAWINGS. 16. EROSION CONTROL MEASURES ARE TO BE MAINTAINED DURING ALL PHASES OF CONSTRUCTION (SEE GRADING & DRAINAGE PLAN AND/OR SEDIMENT & EROSION CONTROL PLAN). 17. EXISTING DRAINAGE STRUCTURES TO BE INSPECTED, REPAIRED AS NEEDED & CLEANED OUT TO REMOVE ALL SILT & DEBRIS. 18. THE CONTRACTOR SHALL REPAIR OR REPLACE IN-KIND ANY DAMAGE THAT OCCURS TO PROPERTY AS RESULT OF HIS WORK. 19. ALL SIDE DITCHES TO BE CLEANED AND/OR REGRADED TO PROVIDE PROPER DRAINAGE. 20. ALL AREAS NOT OTHERWISE SURFACED ARE TO BE SEEDED, LANDSCAPED, MULCHED, WATERED, & MAINTAINED UNTIL ADEQUATE STAND OF GRASS IS OBTAINED. 21. UNLESS OTHERWISE SPECIFIED, ALL SLOPES TO BE COVERED WITH MINIMUM OF 4" OF TOPSOIL. 22. ALL PIPE LENGTHS & DISTANCES BETWEEN STRUCTURES ARE MEASURED FROM CENTER OF STRUCTURE TO CENTER OF STRUCTURE ALONG A HORIZONTAL PLANE. 23. THE CONTRACTOR SHALL PROVIDE ALL THE MATERIALS & APPURTENANCES NECESSARY FOR THE COMPLETE INSTALLATION OF THE STORM DRAINAGE, SEWER, WATER & UTILITY SYSTEMS. ALL PIPE & FITTINGS SHALL BE INSPECTED BY THE UTILITY DEPARTMENT INSPECTOR PRIOR TO BEING COVERED. THE INSPECTOR MUST ALSO BE PRESENT DURING PRESSURE TESTING & DISINFECTION OF LATERALS & HIS SIGNATURE OF APPROVAL IS REQUIRED. 24. THE CONTRACTOR SHALL MAKE ARRANGEMENTS WITH THE LOCAL UTILITY AUTHORITIES FOR CONNECTION TO THE EXISTING MAINS & PAY ALL APPLICABLE FEES. 25. UTILITY COORDINATION & COSTS SHALL BE INCLUDED IN THE PROJECT SCHEDULE & IT IS THE EXPLICIT RESPONSIBILITY OF THE CONTRACTOR TO ASSURE THAT THE PROJECT SCHEDULE INCLUDES THE NECESSARY RELOCATION. THE CONTRACTOR WILL NOT BE PAID ADDITIONALLY FOR THIS COORDINATION. THE CONTRACTOR SHOULD SEEK ASSISTANCE FROM ALL UTILITY COMPANIES TO LOCATE & PROTECT THEIR FACILITIES. 26. CONTRACTOR SHALL OBTAIN ALL PERMITS BEFORE CONSTRUCTION BEGINS. 27. DIMENSIONS ON BUILDINGS ARE FOR GRADING PURPOSES ONLY & ARE NOT TO BE USED TO LAYOUT FOOTINGS. REFER TO THE STRUCTURAL DRAWINGS FOR FOUNDATION INFORMATION. 28. ALL DIMENSIONS SHOWN ARE TO FACE OF CURB OR EDGE OF S/W UNLESS NOTED OTHERWISE. 29. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO BEGINNING CONSTRUCTION. 30. JOINTS OR SCORE MARKS ARE TO BE SHARP & CLEAN WITHOUT SHOWING EDGES OF JOINT TOOL. 31. THE CONTRACTOR SHALL PROVIDE FOR ANY NECESSARY BONDS AS REQUIRED BY GOVERNING AGENCIES. 32. AN AUTO CAD BASE PLAN MAY BE PROVIDED TO THE CONTRACTOR FOR CONSTRUCTION PURPOSES. 33. TEMPORARY BENCHMARKS: ARE LOCATED WHERE SHOWN ON SURVEY, MAG NAIL W/ WASHER SET ELEV=717.19 AND FIRE HYDRANT TOP BOLT ELEV: 718.41 & WAS SET BY HOPKINS SURVEYING 34. TOPOGRAPHIC & BOUNDARY SURVEY BY HOPKINS SURVEYING & PROVIDED BY THE OWNER. 35. SEE FINAL PLAT BY SURVEYOR FOR LOCATIONS OF ALL NEW SANITARY SEWER & STORM DRAINAGE EASEMENTS. ALL DETENTION AREAS WILL BE A STORM DRAINAGE EASEMENT. 6 C700 DETAIL:MOUNTABLE EXTRUDED CONCRETE CURB 11 C700 90° PARKINGDETAIL: DETAIL:ACCESSIBLE PARKING SIGN & SYMBOL ADA SYMBOLACCESSIBLE SIGN C700 12 13 C700 DETAIL:PRE-CAST CONC. CURB STOP DETAIL DETAIL: C700 14 SAWCUT & PAVEMENT TRANSITION SIDEWALK DRAINDETAIL: C700 9 ASPHALT PAVEMENT PARKING SECTIONSDETAIL: C700 15 TENNIS COURT PAVEMENT SECTIONDETAIL: C700 1 2 ADDENDUM 2 7-05-23 2 2 PICKLE-BALL COURT PAVEMENT SECTION DETAIL: C700 1A AutoCAD SHX Text NO. PE034052 AutoCAD SHX Text E AutoCAD SHX Text G AutoCAD SHX Text O AutoCAD SHX Text A AutoCAD SHX Text G AutoCAD SHX Text R AutoCAD SHX Text I AutoCAD SHX Text PROFESSIONAL AutoCAD SHX Text 05/09/2023 AutoCAD SHX Text Level II Design Professional Certification #35390 AutoCAD SHX Text (NTS) AutoCAD SHX Text (NTS) AutoCAD SHX Text (NTS) AutoCAD SHX Text SEAL JOINT WITH EUCO NEO-SEAL AutoCAD SHX Text BY EUCLID CHEMICAL COMPANY AutoCAD SHX Text NEO-SEAL BY EUCLID AutoCAD SHX Text SEAL JOINT WITH EUCO AutoCAD SHX Text TOOL 3/16" WIDE AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text 1/2 " AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text JOINT AS SOON AS AutoCAD SHX Text 1/2" PREFORMED BITUMINOUS AutoCAD SHX Text EXPANSION BOARD (TYP.) AutoCAD SHX Text (TYP.) AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text KEY (TYP.) AutoCAD SHX Text PREFORMED METAL AutoCAD SHX Text BONDING OF SECOND POUR AutoCAD SHX Text JOINT WITH FORM OIL TO PREVENT AutoCAD SHX Text COAT ONE SIDE OF PREFORMED AutoCAD SHX Text CHEMICAL COMPANY AutoCAD SHX Text PRACTICAL AutoCAD SHX Text 2" AutoCAD SHX Text JOINTS NOT TO EXCEED 30 TIMES THE CONCRETE THICKNESS AS PER AMERICAN AutoCAD SHX Text CONCRETE INSTITUTES RECOMMENDATIONS. AutoCAD SHX Text SEAL JOINT WITH EUCO NEO-SEAL AutoCAD SHX Text BY EUCLID CHEMICAL COMPANY AutoCAD SHX Text NEO-SEAL BY EUCLID AutoCAD SHX Text SEAL JOINT WITH EUCO AutoCAD SHX Text TOOLED 3/16" WIDE AutoCAD SHX Text 1/2 " AutoCAD SHX Text JOINT AutoCAD SHX Text 1/2" PREFORMED BITUMINOUS AutoCAD SHX Text EXPANSION BOARD (TYP.) AutoCAD SHX Text CHEMICAL COMPANY AutoCAD SHX Text 2' LONG 3/4" DIA. SMOOTH DOWEL @ 15" O.C. PAINTED AND GREASED AutoCAD SHX Text SEAL JOINT WITH EUCO NEO-SEAL AutoCAD SHX Text BY EUCLID CHEMICAL COMPANY AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text KEY (TYP.) AutoCAD SHX Text PREFORMED METAL AutoCAD SHX Text BONDING OF SECOND POUR AutoCAD SHX Text JOINT WITH FORM OIL TO PREVENT AutoCAD SHX Text COAT ONE SIDE OF PREFORMED AutoCAD SHX Text 2' LONG 3/4" DIA. SMOOTH DOWEL @ 15" O.C. PAINTED AND GREASED AutoCAD SHX Text CENTER IN CONC. THICKNESS AutoCAD SHX Text CENTER IN CONC. THICKNESS AutoCAD SHX Text NOTES: 1. JOINTS NOT TO EXCEED 30 TIMES THE CONCRETE THICKNESS AS PER JOINTS NOT TO EXCEED 30 TIMES THE CONCRETE THICKNESS AS PER AMERICAN CONCRETE INSTITUTES RECOMMENDATIONS. 2. DOWEL BARS SHALL BE HELD IN PLACE BY BAR SUPPORT ASSEMBLY. DOWEL BARS SHALL BE HELD IN PLACE BY BAR SUPPORT ASSEMBLY. DOWEL CONC. PAVEMENT TO CURB & GUTTER. PROVIDE EXPANSION JOINT WHERE CONC. PAVEMENT AND CURB & GUTTER MEET. AutoCAD SHX Text 0.25 x THICKNESS AutoCAD SHX Text OF CONCRETE AutoCAD SHX Text 0.25 x THICKNESS AutoCAD SHX Text OF CONCRETE AutoCAD SHX Text 2" (TYP.) AutoCAD SHX Text FABRIC: NO.9 GA. FINISHED AutoCAD SHX Text GALVANIZED STEEL WIRES WITH AutoCAD SHX Text PVC COATING, 1.75" MESH, WITH AutoCAD SHX Text BOTH TOP & BOTTOM SELVAGES AutoCAD SHX Text TWISTED & BARBED. FURNISH AutoCAD SHX Text ONE-PIECE FABRIC WIDTHS AutoCAD SHX Text 2.5" LINE POSTS AutoCAD SHX Text (NTS) AutoCAD SHX Text FOR FENCING. AutoCAD SHX Text 10' O.C. MAX. AutoCAD SHX Text 10' AutoCAD SHX Text 3" CORNER POSTS AutoCAD SHX Text 3" END POSTS AutoCAD SHX Text 4" GATE POSTS AutoCAD SHX Text 2" GATE FRAME AutoCAD SHX Text 1-5/8" TOP RAIL AutoCAD SHX Text 1-5/8" BOTTOM RAIL AutoCAD SHX Text 1-5/8" BRACE RAIL AutoCAD SHX Text FOUNDATION, TYP AutoCAD SHX Text 12" DIAMETER; 42" DEEP AutoCAD SHX Text %%UNOTES AutoCAD SHX Text POST TO STOP 6" FROM AutoCAD SHX Text BOTTOM OF FOUNDATION AutoCAD SHX Text (NTS) AutoCAD SHX Text (NTS) AutoCAD SHX Text TRANSITION AutoCAD SHX Text CURB IN 12" AutoCAD SHX Text TAPER AutoCAD SHX Text PAVEMENT AutoCAD SHX Text CONCRETE CURB AutoCAD SHX Text EXTRUDED AutoCAD SHX Text (NTS) AutoCAD SHX Text COMPACTED SUBGRADE AutoCAD SHX Text MIN. AutoCAD SHX Text 4" AutoCAD SHX Text 1.5%%% DESIGN/2%%% MAX SLOPE AutoCAD SHX Text SEE PLANS FOR ACTUAL WIDTH AutoCAD SHX Text 1/2 " PREFORMED EXPANSION JOINT AutoCAD SHX Text SEE PLANS FOR ACTUAL WIDTH AutoCAD SHX Text COMPACTED SUBGRADE AutoCAD SHX Text 1.5%%% DESIGN/2%%% MAX SLOPE AutoCAD SHX Text 4" AutoCAD SHX Text MIN. AutoCAD SHX Text 6" AutoCAD SHX Text 6" AutoCAD SHX Text 8" AutoCAD SHX Text 2. AutoCAD SHX Text SEE ALSO DETAIL: %%uTYP. CONSTRUCTION, CONTROL & EXPANSION JOINTS AutoCAD SHX Text 4,000 PSI CONCRETE @ 28 DAYS WITH REINFORCEMENT - 6X6-W1.4 X W1.4 W.W.M. AutoCAD SHX Text 1. AutoCAD SHX Text %%UNOTES: AutoCAD SHX Text 3. AutoCAD SHX Text PROVIDE 1" DEEP TRANSVERSE GROOVES AT 5'-0" INTERVALS, OR AS SHOWN ON PLAN. AutoCAD SHX Text PROVIDE 1/2 " WIDE EXPANSION JOINT AT 20' INTERVALS AND AT AutoCAD SHX Text 4. AutoCAD SHX Text ALL CURBS, RIGID STRUCTURES AND RIGID PAVEMENT. AutoCAD SHX Text 6. AutoCAD SHX Text BROOM FINISH ACROSS DIRECTION OF TRAVEL. AutoCAD SHX Text TOOL ALL EXPOSED EDGES AND JOINTS TO 1/4 " RADIUS. AutoCAD SHX Text 5. AutoCAD SHX Text MAXIMUM SLOPE = 5%. AutoCAD SHX Text 7. AutoCAD SHX Text 1/2 " PREFORMED EXPANSION JOINT AutoCAD SHX Text SEE PLANS FOR ACTUAL WIDTH AutoCAD SHX Text 1.5%%% DESIGN/2%%% MAX SLOPE AutoCAD SHX Text CURB & GUTTER WHERE USED. AutoCAD SHX Text 4" AutoCAD SHX Text COMPACTED SUBGRADE AutoCAD SHX Text ASPHALT & BASE COURSE AutoCAD SHX Text 6" AutoCAD SHX Text 10" AutoCAD SHX Text 10" AutoCAD SHX Text 6" AutoCAD SHX Text ASPHALT & BASE COURSE AutoCAD SHX Text 8" AutoCAD SHX Text 6" AutoCAD SHX Text 1/2 " PREFORMED EXPANSION JOINT AutoCAD SHX Text SEE PLANS FOR ACTUAL WIDTH AutoCAD SHX Text 1.5%%% DESIGN/2%%% MAX SLOPE AutoCAD SHX Text 4" AutoCAD SHX Text MIN. AutoCAD SHX Text COMPACTED SUBGRADE AutoCAD SHX Text 8" AutoCAD SHX Text 6" AutoCAD SHX Text 2" OF CRUSH STONE BASE AutoCAD SHX Text 2" OF CRUSH STONE BASE AutoCAD SHX Text 2" OF CRUSH STONE BASE AutoCAD SHX Text 2" OF CRUSH STONE BASE AutoCAD SHX Text 1/4 "/FT. AutoCAD SHX Text LOW SLUMP MIX AS AutoCAD SHX Text 12%%d AutoCAD SHX Text 3" AutoCAD SHX Text 6" PLUS AutoCAD SHX Text 12" AutoCAD SHX Text 2"R AutoCAD SHX Text BITUMINOUS TACK COAT (SEE DETAIL) AutoCAD SHX Text ASPHALT SURFACE COURSE (SEE DETAIL) AutoCAD SHX Text PER CITY SPECIFICATIONS AutoCAD SHX Text (NTS) AutoCAD SHX Text ASPHALT BINDER COURSE (SEE DETAIL) AutoCAD SHX Text %%UNOTE:%%U SEE DETAIL %%UASPHALT PAVEMENT SECTIONS AutoCAD SHX Text COMPACTED SUB GRADE (SEE DETAIL) AutoCAD SHX Text MINERAL AGGREGATE BASE (SEE DETAIL) AutoCAD SHX Text SURFACE AutoCAD SHX Text COURSE AutoCAD SHX Text THICKNESS AutoCAD SHX Text ACCESSIBLE LANDING AutoCAD SHX Text & RAMP (SEE AutoCAD SHX Text DETAIL) AutoCAD SHX Text (SEE DETAIL THIS SHEET) AutoCAD SHX Text ACCESSIBLE. SIGN AutoCAD SHX Text RAMP (1:20 AutoCAD SHX Text MAX. SLOPE) AutoCAD SHX Text ACCESSIBLE. AutoCAD SHX Text SYMBOL AutoCAD SHX Text (SEE DETAIL) AutoCAD SHX Text HANDICAP LANDING AutoCAD SHX Text SPACE AutoCAD SHX Text PARKING AutoCAD SHX Text ACCESSIBLE. AutoCAD SHX Text TYP. STD. AutoCAD SHX Text SPACE AutoCAD SHX Text TYP. STD. AutoCAD SHX Text TURN DOWN SIDEWALK AutoCAD SHX Text ACCESSIBLE. AutoCAD SHX Text PARKING AutoCAD SHX Text (TYP.) AutoCAD SHX Text 9'-0" AutoCAD SHX Text 18'-0" AutoCAD SHX Text TRAFFIC PAINT AutoCAD SHX Text 2 COATS WHITE AutoCAD SHX Text 8'-0" AutoCAD SHX Text (SEE DETAIL) AutoCAD SHX Text 8'-0" AutoCAD SHX Text 8'-0" AutoCAD SHX Text 5'-0" AutoCAD SHX Text & RAMP (SEE DETAIL) AutoCAD SHX Text (NTS) AutoCAD SHX Text PARKING SPACE AutoCAD SHX Text TYP. REGULAR AutoCAD SHX Text ACCESSIBLE AISLE AutoCAD SHX Text TYP. VAN ACCESSIBLE. AutoCAD SHX Text TYP. STD. ACCESSIBLE. AutoCAD SHX Text ACCESSIBLE AISLE AutoCAD SHX Text %%UNOTES: AutoCAD SHX Text SHALL CONFORM TO ALL ADA SPECIFICATIONS & LOCAL ORDINANCES. AutoCAD SHX Text CURB RAMP & PARKING SPACE CONSTRUCTION & INSTALLATION AutoCAD SHX Text 1. AutoCAD SHX Text PAVEMENT STRIPING PER LOCAL DOT STANDARDS AND SPECIFICATIONS. AutoCAD SHX Text 2. AutoCAD SHX Text W/ VAN ACCESSIBLE SIGN AutoCAD SHX Text 3. AutoCAD SHX Text FINISHED GROUND SLOPE AT NEW ACCESSIBLE PARKING SPACES AND ACCESS AISLES SHALL NOT BE STEEPER THAN 1:50 (2%) AutoCAD SHX Text %%UNOTES: AutoCAD SHX Text ADA SIGN & SYMBOL CONSTRUCTION AutoCAD SHX Text & INSTALLATION SHALL CONFORM TO ALL AutoCAD SHX Text (NTS) AutoCAD SHX Text 1'-4" AutoCAD SHX Text 10" AutoCAD SHX Text 1'-10" AutoCAD SHX Text 8" AutoCAD SHX Text OF TRAFFIC AutoCAD SHX Text 14"R AutoCAD SHX Text 4" WIDE AutoCAD SHX Text PAINT AutoCAD SHX Text 8"%%C AutoCAD SHX Text LINES AutoCAD SHX Text PAINTED AutoCAD SHX Text 2" METAL POST AutoCAD SHX Text ONE SIGN PER ACCESSIBLE SPACE AutoCAD SHX Text SIGN TO BE MOUNTED ON AutoCAD SHX Text AND LETTERING TO MATCH ADA SIGN AutoCAD SHX Text SPECIFIED ON PLANS. COLORING AutoCAD SHX Text BELOW STANDARD ADA SIGN WHERE AutoCAD SHX Text VAN ACCESSIBLE SIGN TO BE MOUNTED AutoCAD SHX Text LETTERING MINIMUM 1" HEIGHT AutoCAD SHX Text GREEN LETTERING AND SYMBOL AutoCAD SHX Text REFLECTIVE BLUE BACKGROUND AutoCAD SHX Text 18" AutoCAD SHX Text 1" MIN. AutoCAD SHX Text PERMIT PARKING ONLY AutoCAD SHX Text TOW-AWAY ZONE AutoCAD SHX Text 3" MIN. AutoCAD SHX Text 7 FEET AutoCAD SHX Text 12" AutoCAD SHX Text VAN-ACCESSIBLE AutoCAD SHX Text %%UVAN-ACCESSIBLE AutoCAD SHX Text MAXIMUM FINE $*** AutoCAD SHX Text FINISH AutoCAD SHX Text 12" AutoCAD SHX Text 1" MIN. AutoCAD SHX Text GRADE AutoCAD SHX Text 2 COATS AutoCAD SHX Text ADA SPECIFICATIONS & LOCAL ORDINANCES. AutoCAD SHX Text 5. AutoCAD SHX Text 3. AutoCAD SHX Text 2. AutoCAD SHX Text 4. AutoCAD SHX Text 1. AutoCAD SHX Text ***MAX. FINE ON SIGN AutoCAD SHX Text PER LOCAL ORDINANCES. AutoCAD SHX Text 2 COATS BLUE BACKGROUND PAINT AutoCAD SHX Text 1/4" AutoCAD SHX Text & BASE COURSE AutoCAD SHX Text 18" LONG PER AutoCAD SHX Text EACH UNIT AutoCAD SHX Text ASPHALT PAVING AutoCAD SHX Text 2-1/2" AutoCAD SHX Text 6" AutoCAD SHX Text 1" AutoCAD SHX Text 12" AutoCAD SHX Text 1/4" AutoCAD SHX Text 2" AutoCAD SHX Text 4-1/2" AutoCAD SHX Text 9" AutoCAD SHX Text 2" AutoCAD SHX Text (2) 3/4" %%C RODS AutoCAD SHX Text 1" DRAINAGE SLOTS AutoCAD SHX Text (2) #5 REINFORCED BARS AutoCAD SHX Text 6' LONG PRECAST AutoCAD SHX Text CONC. CURB STOP AutoCAD SHX Text 1'-0" AutoCAD SHX Text 1'-0" AutoCAD SHX Text 1" DRAINAGE SLOTS AutoCAD SHX Text 2'-0" AutoCAD SHX Text 6'-0" AutoCAD SHX Text 1'-0" AutoCAD SHX Text 1'-0" AutoCAD SHX Text (NTS) AutoCAD SHX Text CLEAR SEALER OVER RODS AutoCAD SHX Text (NTS) AutoCAD SHX Text NEW PAVEMENT AutoCAD SHX Text %%UNOTE:%%U NEW PAVEMENT TO MATCH ELEVATION OF EXISTING AutoCAD SHX Text PAVEMENT. SAW CUT EXISTING PAVEMENT AS NECESSARY AutoCAD SHX Text TO OBTAIN A FULL DEPTH SEAL BETWEEN THE PROPOSED AutoCAD SHX Text PAVEMENT AND THE EXISTING PAVEMENT. AutoCAD SHX Text SAWCUT EXIST. PAVEMENT AutoCAD SHX Text WITH JOINT SEALER AutoCAD SHX Text EXIST. PAVEMENT AutoCAD SHX Text (NTS) AutoCAD SHX Text CURB & GUTTER AutoCAD SHX Text PITCH SIDEWALK TO DRAIN AWAY FROM GUTTER 2% MAX AutoCAD SHX Text 36" CLEAR AutoCAD SHX Text W1 AutoCAD SHX Text W3 AutoCAD SHX Text DRY DENSITY IN ACCORDANCE WITH AASHTO T99, METHOD A AutoCAD SHX Text AND AT 2 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENT. AutoCAD SHX Text COMPACT TOP 6" OF SUBGRADE TO 100 PERCENT OF MAXIMUM AutoCAD SHX Text "B" PER GA.DOT SPECS. SEC. 828. AutoCAD SHX Text ASPHALT BINDER COURSE, TYPE AutoCAD SHX Text (NTS) AutoCAD SHX Text ASPH. SURFACE COURSE THICKNESS "W1" AutoCAD SHX Text ASPH. BINDER COURSE THICKNESS "W2" AutoCAD SHX Text 1.5" AutoCAD SHX Text 2" AutoCAD SHX Text STANDARD DUTY AutoCAD SHX Text THICKNESS AutoCAD SHX Text AGGREGATE BASE THICKNESS "W3" AutoCAD SHX Text 6" AutoCAD SHX Text W2 AutoCAD SHX Text "F" PER GA.DOT SPECS. SEC. 828. AutoCAD SHX Text ASPHALT SURFACE COURSE, TYPE AutoCAD SHX Text MINERAL AGGREGATE BASE COMPACT TO 100 PERCENT OF AutoCAD SHX Text METHOD A (GA.D.O.T. STD. SPEC. SEC. 310) AutoCAD SHX Text MAXIMUM DRY DENSITY IN ACCORDANCE WITH AASHTO T99, AutoCAD SHX Text (NTS) AutoCAD SHX Text ASPH. SURFACE COURSE THICKNESS "W1" AutoCAD SHX Text EXISTING AGGREGATE BASE "W2" AutoCAD SHX Text 1" AutoCAD SHX Text UNKOWN AutoCAD SHX Text THICKNESS AutoCAD SHX Text FOR PICKLE BALL COURT USE 2" MESH. AutoCAD SHX Text SEE C100 FOR FENCE HEIGHTS. AutoCAD SHX Text APPLY A 4-COAT PLAYING SYSTEM AND LINES THAT WILL PROVIDE A MEDIUM SPEED PLAYING SURFACE. SEE SPEC. 32 18 23 AutoCAD SHX Text EXISTING TENNIS COURT ASPHALT, THICKNESS UNKOWN AutoCAD SHX Text EXISTING AGGREGATE BASE COURSE. AutoCAD SHX Text MILL AND RESURFACE TOP 1" AutoCAD SHX Text SEE SITE PLAN C100 FOR FENCE HEIGHTS. FABRIC: NO.9 GA. FINISHED GALVANIZED STEEL WIRES WITH PVC COATING, 2.00" MESH, WITH BOTH TOP AND BOTTOM SELVAGES TWISTED & BARBED. FURNISH ONE-PIECE FABRIC WIDTHS FOR FENCING. AutoCAD SHX Text W1 AutoCAD SHX Text W3 AutoCAD SHX Text (NTS) AutoCAD SHX Text ASPH. SURFACE COURSE THICKNESS "W1" AutoCAD SHX Text ASPH. BINDER COURSE THICKNESS "W2" AutoCAD SHX Text 1.0" AutoCAD SHX Text 2" AutoCAD SHX Text THICKNESS AutoCAD SHX Text AGGREGATE BASE THICKNESS "W3" AutoCAD SHX Text 6" AutoCAD SHX Text W2 AutoCAD SHX Text MINERAL AGGREGATE BASE COURSE. AutoCAD SHX Text ASPHALT SURFACE COURSE, TYPE "F" PER GA. DOT SPECS. SEC. 828. AutoCAD SHX Text ASPHALT BINDER COURSE, TYPE "B" PER GA. DOT SPECS. SEC. 828. AutoCAD SHX Text APPLY A 4-COAT PLAYING SYSTEM AND LINES THAT WILL PROVIDE A MEDIUM SPEED PLAYING SURFACE. SEE SPEC. 32 18 23 GEOServices, LLC | 6607 Mountain View Road, Suite 139, Ooltewah, Tennessee 37363 | Phone (423) 614‐6471 Fax (423) 614‐6479 September 23, 2022 DH&W Architects 1001 Carter Street Chattanooga, TN 37402 ATTENTION: Mr. Raymond Boaz, Jr., AIA rboaz@dhw‐architects.com Subject: REPORT OF GEOTECHNICAL EXPLORATION City of Fort Oglethorpe – Tennis Courts Gilbert‐Stephenson Park Fort Oglethorpe, Georgia GEOServices Project No. 41‐22615 Dear Mr. Boaz: We are submitting the results of the geotechnical exploration performed for the subject project. The geotechnical exploration was performed in general accordance with GEOS Proposal No. 14‐ 22370, dated July 5, 2022. The following report presents our findings and recommendations for the proposed park expansion in Fort Oglethorpe, Georgia. GEOServices sincerely appreciates the opportunity to serve as your geotechnical consultant. Should you have any questions regarding this report, or if we can be of any further assistance, please contact us at your convenience. Sincerely, GEOServices, LLC Jeremy T. Haley, P.E. (TN) Jacob E. Ervin, P.E. Geotechnical Engineer Geotechnical Engineer GA 048666 Submitted by: GEOServices, LLC 6607 Mountain View Road, Suite 139 Ooltewah, Tennessee 37363 Phone (423) 614‐6471 FAX (423) 614‐6479 REPORT OF GEOTECHNICAL EXPLORATION CITY OF FORT OGLETHORPE – TENNIS COURTS Gilbert‐Stephenson Park Fort Oglethorpe, Georgia GEOSERVICES, LLC PROJECT NO. 41‐22615 Submitted to: DH&W Architects 1001 Carter Street Chattanooga, TN 37402 TABLE OF CONTENTS Page 1.0 INTRODUCTION ................................................................................................................................................. 1 1.1 PURPOSE ......................................................................................................................................................... 1 1.2 PROJECT INFORMATION AND SITE DESCRIPTION ........................................................................................ 1 1.3 SCOPE OF STUDY ........................................................................................................................................... 1 2.0 EXPLORATION AND TESTING PROGRAMS ...................................................................................................... 3 2.1 FIELD EXPLORATION ....................................................................................................................................... 3 2.2 LABORATORY TEST PROGRAM ...................................................................................................................... 3 3.0 SUBSURFACE CONDITIONS ............................................................................................................................... 5 3.1 GEOLOGIC CONDITIONS ................................................................................................................................ 5 3.2 SUBSURFACE CONDITIONS ............................................................................................................................ 5 3.2.1 Surficial Materials ................................................................................................................................... 6 3.2.2 Existing Fill ............................................................................................................................................... 6 3.2.3 Residual Soils ........................................................................................................................................... 6 3.2.4 Subsurface Water ................................................................................................................................... 7 3.2.5 Auger Refusal Conditions ....................................................................................................................... 7 4.0 CONCLUSIONS AND RECOMMENDATIONS .................................................................................................... 8 4.1 SITE ASSESSMENT ........................................................................................................................................... 8 4.1.1 Existing Fill Soils ...................................................................................................................................... 8 4.1.2 Soft to Firm Surficial Residual Soils ........................................................................................................ 9 4.1.3 Potentially Difficult Excavations ............................................................................................................. 9 4.1.4 Karst Geology .......................................................................................................................................... 9 4.2 SITE PREPARATION ....................................................................................................................................... 10 4.2.1 Subgrade ............................................................................................................................................... 10 4.2.2 Structural Soil Fill .................................................................................................................................. 10 4.2.3 Compacted Crushed Stone Fill .............................................................................................................. 11 4.3 PAVEMENT DESIGN RECOMMENDATIONS ................................................................................................ 11 4.3.1 Tennis Court Pavement Design ............................................................................................................ 12 4.3.2 Flexible Pavement Design (Parking Lot) .............................................................................................. 14 4.4 LATERAL EARTH PRESSURES ........................................................................................................................ 15 5.0 CONSTRUCTION CONSIDERATIONS ............................................................................................................... 17 5.1 EXCAVATIONS ............................................................................................................................................... 17 5.2 MOISTURE SENSITIVE SOILS .............................................................................................................. 17 5.3 DRAINAGE AND SURFACE WATER CONCERNS .................................................................................. 18 5.4 SINKHOLE CONSIDERATIONS ............................................................................................................. 18 6.0 LIMITATIONS .................................................................................................................................................... 20 APPENDICES APPENDIX A – Figures and Test Boring Records APPENDIX B – Soil Laboratory Data Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 1 | P a g e 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this geotechnical exploration was to characterize the subsurface conditions for the design and construction of the proposed expansion at the existing Gilbert‐Stephenson Park in Fort Oglethorpe, Georgia. This report provides recommendations for general site preparation, excavation and fill requirements, and pavement recommendations for the proposed park expansion. 1.2 PROJECT INFORMATION AND SITE DESCRIPTION Project information was provided by Mr. Ray Boaz with DH&W Architects. We were also provided with a Conceptual Site Plan prepared by DH&W Architects. The site for the proposed expansion is located at the existing Gilbert‐Stephenson Park at 19 Van Cleve Street in Fort Oglethorpe, Georgia. Based on the provided information, we understand that the project will consist of the construction of four new tennis courts, the resurfacing of existing tennis courts, and a new parking area. The area for the new tennis courts currently exists as a relatively level grass covered field in the southern portion of the park. The area for the new parking area currently exists as an asphalt covered parking area, a set of two tennis courts, and the surrounding grass covered areas in the northern portion of the park. No grading information was available at the time of this report; however, based on the existing grades, we anticipate earthwork cuts and fills will be on the order of 3 feet or less in order to establish the proposed grades at the site. 1.3 SCOPE OF STUDY This geotechnical exploration involved a site reconnaissance, field drilling, laboratory testing, and engineering analysis. The following sections of this report present discussions of the field exploration, site conditions, and conclusions and recommendations. Following the text of this Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 2 | P a g e report, Appendix A presents figures and test boring records. Appendix B presents a summary of laboratory test results. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands, or hazardous or toxic materials in the soil, bedrock, surface water, subsurface water, or air, on or below, or around this site. Any statements in this report or on the boring logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for informational purposes. Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 3 | P a g e 2.0 EXPLORATION AND TESTING PROGRAMS 2.1 FIELD EXPLORATION The site subsurface conditions were explored with a total of six (6) soil test borings (B‐1 through B‐ 6). Three of the borings (B‐1 through B‐3) were performed within the proposed northern parking area and three of the borings (B‐4 through B‐6) were performed within the proposed southern tennis court area. The boring locations and depths were selected by GEOServices personnel in conjunction with the Conceptual Site Plan prepared by DH&W Architects. Approximate boring locations are shown on the Boring Location Plan, Figure 3 of Appendix A. The boring locations were located and staked in the field by GEOServices personnel. Drilling was performed on September 16, 2022. The depths reference the ground surface elevations at the site that existed at the time of the exploration. The borings were advanced using 3.25‐inch inside diameter hollow stem augers (HSA) with a tracked Geoprobe drill rig. The drill crew worked in general accordance with ASTM D6151 (HSA Drilling). Sampling of overburden soils was accomplished using the standard penetration test procedure (ASTM D1586). The borings were backfilled with soil cuttings prior to leaving the site. Detailed test boring records are presented in Appendix A. In split–spoon sampling, a standard 2‐inch O.D. split‐spoon sampler is driven into the bottom of the boring with a 140‐pound hammer falling a distance of 30 inches. The number of blows required to advance the sampler the last 12 inches of the standard 18 inches of total penetration is recorded as the Standard Penetration Resistance (N‐value). These N‐values are indicated on the boring logs at the testing depth and provide an indication of the relative density of granular materials and strength of cohesive materials. 2.2 LABORATORY TEST PROGRAM Soil samples collected during drilling were transported to our laboratory for visual classification and laboratory testing. The following laboratory testing was performed on select samples to determine various properties of the soil: Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 4 | P a g e  Atterberg Limits (ASTM D4318): Two (2) Atterberg limits tests were performed for this project. These tests help us to confirm our visual classifications according to the Unified Soil Classification System (USCS). The plastic limit and liquid limit represent the moisture content at which a cohesive soil changes from a semi‐solid to a plastic state and from a plastic state to liquid state, respectively.  Natural Moisture Content (ASTM D2216): Moisture content determinations were performed on fifteen (15) samples for this project. The natural moisture content is defined as the ratio of the weight of water present in the soil to the dry weight of soil. The test results are presented on individual laboratory data sheets and a Soil Data Summary, both enclosed in Appendix B. Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 5 | P a g e 3.0 SUBSURFACE CONDITIONS 3.1 GEOLOGIC CONDITIONS The project site, as most of north Georgia, lies in the Appalachian Valley and Ridge Physiographic Province. The Province is characterized by elongated, northeasterly‐trending ridges formed on highly resistant sandstones and shales. Between ridges, broad valleys and rolling hills are formed primarily on less resistant limestones, dolomites and shales. Published geologic information indicates that the proposed construction area is underlain by limestones of the Chickamauga Group. The Chickamauga Group is comprised mostly of limestone with minor amounts of shale. Weathering of the Chickamauga Group generally produces a medium to high plasticity clay soil with minor amounts of chert gravel. Since the bedrock formation at the site contains limestone, the site is susceptible to the typical carbonate hazards of irregular weathering, cave and cavern conditions, and overburden sinkholes. Carbonate rock, while appearing very hard and resistant, is soluble in slightly acidic water. This characteristic, plus differential weathering of the bedrock mass, is responsible for the hazards. Of these hazards, the occurrence of sinkholes is potentially the most damaging to overlying soil supported structures. In north Georgia, sinkholes occur primarily due to differential weathering of the bedrock and "flushing" or "raveling" of overburden soils into the cavities in the bedrock. The loss of solids creates a cavity or "dome" in the overburden. Growth of the dome over time or excavation over the dome can create a condition in which rapid, local subsidence or collapse of the roof of the dome occurs. 3.2 SUBSURFACE CONDITIONS The below subsurface description is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring logs included in Appendix A should be reviewed for specific information at individual boring locations. The depth and Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 6 | P a g e thickness of the subsurface strata indicated on the boring cross‐sections were generalized from and interpolated between test locations. The transition between materials will be more or less gradual than indicated and may be abrupt. Information on actual subsurface conditions exists only at the specific boring locations and is relevant to the time the exploration was performed. Variations may occur and should be expected between boring locations. The stratification lines were used for our analytical purposes and, unless specifically stated otherwise, should not be used as the basis for design or construction cost estimates. 3.2.1 Surficial Materials A surficial layer of asphalt and stone approximately 6 inches in thickness was encountered in one of the six borings (B‐1). A surficial layer of topsoil ranging from 3 to 6 inches in thickness was encountered in the remaining five borings (B‐2 through B‐6). Beneath these surficial layers, existing fill soils and residual soils were encountered to auger refusal depths ranging from 5.6 to 8.3 feet. 3.2.2 Existing Fill Beneath the surficial topsoil layer in two of the six borings (B‐2 and B‐3), existing fill soils were encountered to a depth of approximately 2 feet. Fill is generally classified as material that has been transported and placed by man. The fill soils generally consisted of dark brown and gray clays with trace amounts of organics. The N‐values of the fill soils ranged from 2 to 6 blows per foot (bpf), indicating a consistency of very soft to firm. The natural moisture contents of the fill soils ranged from 30 to 37 percent. 3.2.3 Residual Soils Beneath the existing fill soils in two of the borings (B‐2 and B‐3) and beneath the surficial layers in the remaining four borings (B‐1 and B‐4 through B‐6), residual soils were encountered to auger refusal depths ranging from 5.6 to 8.3 feet. Residual soils are classified as soils which have been formed in place from the weathering of the underlying bedrock. The residual soils generally consisted of brown, light brown, and gray clays with varying amounts of rock fragments. The N‐values of the residuum ranged from 4 bpf to 50 blows per one inch of Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 7 | P a g e penetration, indicating a consistency of soft to very hard. The residuum was generally firm in consistency. The natural moisture contents of the residuum ranged from 17 to 28 percent. Atterberg limits testing on two select samples of the residuum revealed liquid limits (LL) of 32 and 35 percent and plasticity indices (PI) of 17 and 18 percent, respectively. These soils are classified as CL (lean clay) in general accordance with the Unified Soil Classification System. 3.2.4 Subsurface Water Subsurface water was not observed in any of the six borings at the time of drilling. Subsurface water levels may fluctuate due to seasonal changes in precipitation amounts. Additionally, discontinuous zones of perched water may exist within the overburden and/or at the contact with bedrock. The groundwater information presented in this report is the information that was collected at the time of our field activities. 3.2.5 Auger Refusal Conditions Auger refusal materials were encountered in each of the six borings at depths ranging from 5.6 to 8.3 feet during field exploration. Refusal is a designation applied to any material that cannot be penetrated by the power auger. Auger refusal may indicate dense gravel or cobble layers, boulders, rock ledges or pinnacles, or the top of continuous bedrock. A summary of the auger refusal depths encountered is shown below: Table 1 – Auger Refusal Summary Boring No. Auger Refusal Depth (Feet) B‐1 6.5 B‐2 8.3 B‐3 6.8 B‐4 5.6 B‐5 5.8 B‐6 7.6 Note: Depths reference the existing ground elevations at the time of the exploration. Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 8 | P a g e 4.0 CONCLUSIONS AND RECOMMENDATIONS 4.1 SITE ASSESSMENT The results of the field exploration indicate that the site is adaptable for the proposed construction, however, there are some challenges associated with the development of this site. These challenges include the existing fill soils, the soft to firm surficial residual soils, the potentially difficult excavations, and the underlying karst geology. 4.1.1 Existing Fill Soils Existing fill was encountered in two of the six borings (B‐2 and B‐3) to a depth of approximately 2 feet. We have not been provided with testing records for the fill at the time of this report. Accordingly, there are certain risks associated with construction on these types of fill. The risk primarily consists of excessive and/or non‐uniform settlement caused by extensive zones or pockets of soft, loose, or uncompacted material. The boring data indicates the fill soils generally consisted of dark brown and gray clays with trace amounts of organics. The N‐values of the fill soils ranged from 2 to 6 blows per foot (bpf), indicating a consistency of very soft to firm. Typically, an engineered fill would have N‐values in excess of 8 to 10 bpf and would be generally free of deleterious material. Based on our observations of the fill, the majority of the fill appears to have been subjected to only limited compactive efforts and does contain deleterious material in the form of organics. At this time, the existing fill soils were only encountered within the proposed northern parking areas around the existing tennis courts. We would recommend that any existing fill that is soft in consistency and/or contains deleterious material be removed and replaced with suitable structural soil fill. Additionally, for the proposed parking lot addition, it may be more advantageous to treat the soil subgrade with a soil cement stabilization process than undercut and replacement. It has been our experience that existing fill can change abruptly and may contain isolated pockets of unsuitable materials. As such, we recommend that the existing fill soils be subjected Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 9 | P a g e to a detailed proofroll prior to placement of new fill (in fill areas) or at final subgrade elevation (in cut areas) under the supervision of the geotechnical engineer or their qualified representative. Any areas judged to perform unsatisfactorily during the proofroll should be remediated at the engineer’s discretion. Remedial measures typically include undercutting and replacement with structural soil fill or dense graded aggregate. 4.1.2 Soft to Firm Surficial Residual Soils Soft to firm surficial residual soils (N‐values ranging from 4 to 8 bpf) were encountered in five of the six borings (B‐1 and B‐3 through B‐6). Depending on when the construction is performed, there is a high probability that the upper residual soils (on the order of approximately 3 to 5 feet) will need to be scarified, dried, and recompacted or undercut prior to placement of new fill over these areas. Additionally, for the tennis court construction, it may be more advantageous to treat the soil subgrade with a soil cement stabilization process in order to create a stable subgrade. There is the potential of encountering softer, saturated soils between the boring locations, depending on the time of year when grading and/or construction occurs. 4.1.3 Potentially Difficult Excavations Auger refusal materials were encountered in each of the six borings at depths ranging from 5.6 to 8.3 feet. No grading information was available at the time of this report; however, based on the existing grades, we anticipate the refusal materials will be below any potential grading activities at the site. It is possible that these materials may be encountered in utility excavations, especially in any excavations greater than 5 feet. It has been our experience that subsurface rock elevations can vary in short distances. Based on the subsurface auger refusal conditions, these auger refusal materials will likely require difficult excavation techniques such as excavators with rock teeth, hoe‐ramming, or blasting. 4.1.4 Karst Geology A certain degree of risk with respect to sinkhole formation and subsidence should be considered with any site located within geologic areas underlain by potentially soluble rock units. While a rigorous effort to assess the potential for sinkhole formation on this site was beyond the scope of Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 10 | P a g e this evaluation, our borings did not encounter obvious indications of sinkhole development. However, a review of the USGS topographic map of the area did reveal the presence of a single closed depression, which may denote past sinkhole activity, to the southeast of the project site. Based on these findings and our experience with this formation at other sites, we consider that this site has no greater risk for sinkhole activity than other sites in the immediate vicinity of this site. 4.2 SITE PREPARATION 4.2.1 Subgrade Gravel, topsoil, asphalt, concrete, rock fragments greater than 6 inches, and other debris should be removed from the proposed construction areas. In previously developed areas, it is often common to find buried zones of construction debris. If these materials are encountered, they should be undercut and replaced at the discretion of the geotechnical engineer. After completion of any stripping operations and any required excavations to reach subgrade level, we recommend that the subgrade be proofrolled with a fully‐loaded, tandem‐axle dump truck or other pneumatic‐tired construction equipment of similar weight. The geotechnical engineer or their qualified representative should observe proofrolling. Areas judged to perform unsatisfactorily should be remediated at the geotechnical engineer’s discretion. Typically, remedial options consist of undercutting and replacement with structural soil fill or dense graded aggregate. There is a good likelihood that the upper soils currently covering the site may require some scarifying and drying due to exposure to weather (precipitation and freeze/thaw) for an extended period of time. 4.2.2 Structural Soil Fill Material considered suitable for use as compacted fill should be clean soil free of organics, trash, and other deleterious material, containing no rock fragments greater than 6 inches in any one dimension. Preferably, borrow material to be used as structural soil fill should have a standard Proctor maximum dry density of 90 pounds per cubic foot (pcf) or greater and a plasticity index (PI) Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 11 | P a g e of 35 percent or less. All material being used as soil fill should be tested and confirmed by the geotechnical engineer to be in accordance with the project requirements before being placed. Based on limited laboratory testing, we anticipate the on‐site soils are suitable for use as structural soil fill provided that the existing fill is screened to remove all organics prior to placement as structural soil fill. Structural fill should be placed in loose, horizontal lifts not exceeding 8 inches in thickness. Each lift should be compacted to at least 95 percent of maximum dry density per the standard Proctor method (ASTM D698) and within the range of minus 2 percent to plus 3 percent of the optimum moisture content. Each lift should be compacted and tested by geotechnical personnel to confirm that the contractor's method is capable of achieving the project requirements before placing any subsequent lifts. Any areas which have become soft or frozen should be removed before additional structural fill is placed. 4.2.3 Compacted Crushed Stone Fill Compacted crushed stone fill should be Group 1 Aggregates in accordance with Section 815 of the Georgia Department of Transportation specifications. The crushed stone fill should be placed in loose, horizontal lifts not exceeding 10 inches in loose thickness. Each lift should be compacted to at least 98 percent of maximum dry density per the standard Proctor method (ASTM D698). Each lift should be compacted and tested by geotechnical personnel to confirm that the contractor's method is capable of achieving the project requirements before placing any subsequent lifts. 4.3 PAVEMENT DESIGN RECOMMENDATIONS Our recommendations are based upon the assumption that the subgrade has been properly prepared as described in previous report sections and that any off‐site soil borrow to be used to backfill to the final subgrade meets the requirements for structural soil fill. All paved areas should be constructed with positive drainage to direct water off‐site and to minimize surface water seeping into the pavement subgrade. The subgrade should have a Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 12 | P a g e minimum slope of 1 percent. In down grade areas, the basestone should extend through the slope to allow any water entering the basestone a path to exit. For rigid pavements, water‐tight seals should also be provided at formed construction and expansion joints. 4.3.1 Tennis Court Pavement Design We recommend that all tennis court surface construction conform to the recommendations of the A.S.B.A Guidelines for Tennis Court Construction. Based on this, we would recommend the following asphalt surface for the proposed tennis courts: Table 2 – Asphalt Surface Summary Recommended Thickness (Inches) Pavement Materials Tennis Court Bituminous Asphalt Surface Mix 1.0 Bituminous Asphalt Binder Mix 2.0 Compacted Crushed Aggregate Base 6.0 Total Flexible Pavement Thickness 9.0 The recommended pavement thickness’ presented in this report section are considered typical and minimum for the assumed parameters in the general site area. We understand that budgetary considerations sometimes warrant thinner pavement sections than those presented. However, the client, the owner, and the project designers should be aware that thinner pavement sections may result in increased maintenance costs and lower than anticipated pavement life. Due to the soft to firm surficial residual soils encountered in the proposed construction areas, it may be advantageous to treat the soil subgrade with a soil cement stabilization process in order to create a stable subgrade for the proposed tennis courts. We anticipate that this process will improve the conditions and strength of the soil subgrade, and the basestone section listed above can be reduced to a minimum of 4 inches in thickness. This could help offset the cost of the soil cement stabilization but will still facilitate under court drainage. Report of Geotechnical Exploration GEOServices Project No. 41‐22615 City of Fort Oglethorpe Tennis Courts – Fort Oglethorpe, Georgia September 23, 2022 13 | P a g e A summary of the A.S.B.A recommendations is presented below. It should be noted that this summary only includes the recommendations for the subgrade and pavement thicknesses. For all other items, please refer to the A.S.B.A Guidelines for Tennis Court Construction. The subgrade shall be prepared such that the finished subgrade is 4 to 6 i...

500 City Hall Drive Fort Oglethorpe, GA 30742Location

Address: 500 City Hall Drive Fort Oglethorpe, GA 30742

Country : United StatesState : Georgia

You may also like

Addendum 1 20240423

Due: 30 Apr, 2024 (Tomorrow)Agency: Fire Department

UPS - PATHOLOGY AND LABORATORY SERVICE

Due: 30 Sep, 2024 (in 5 months)Agency: VETERANS AFFAIRS, DEPARTMENT OF

A&E BASE CONTRACT AWARD FOR PROJECT#688-CSI-011 RO SYSTEM FOR DIALYSIS 100 DESIGN DC.

Due: 19 Aug, 2024 (in 3 months)Agency: VETERANS AFFAIRS, DEPARTMENT OF

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.