The scope of the Work includes, but is not limited to, the following: i. Schedule A: Wastewater Treatment Plan Flood Protection Berm a. ECO plan preparation and implementation, b. Supply and installation of erosion and sediment control, c. Care of Water plan, d. Wildlife sweeps, e. Supply, installation, and removal of snow fencing and temporary (reusable) chain link fencing, f. Site surveying, site clearing, and tree/shrub clearing, g. Berm construction with a clay material, h. Berm control structure installation in the existing wastewater effluent channel to the river, i. Berm concrete retaining wall around existing pump station electrical panel, j. Coordination with Capital Project Coordinator and Plant Operations and Maintenance for any required shutdowns, k. Effluent channel diversion, l. Entrance road regrading and storm system upgrades, m. Coordination with Alberco for access to the WWTP during entrance road work (Alberco work starts in March 2024), n. Electrical relocation of existing entrance road gate and entrance road keypad, o. Supply and install of topsoil and seeding, and rehabilitation of all landscaped areas Contract duration The estimated contract period will be 7 month(s), with a proposed start date of 2024/05/01. Trade agreements Canadian Free Trade Agreement (CFTA) Canada-European Union Comprehensive Economic and Trade Agreement (CETA) Contracting organization Organization The City of Red Deer Address 4914 - 48 Avenue Box 5008 Red Deer, Alberta, T4N 3T4 Canada Contracting authority Shelly Flahr Phone 403-342-8272 Email
Shelly.flahr@reddeer.ca Fax 403-341-6960 Address Box 5008 Red Deer, Alberta, 403-342-8272