Valley View Trunk Sewer Design

expired opportunity(Expired)
From: Coachella Valley Water District(Utilities)
2024-09

Basic Details

started - 22 Mar, 2024 (1 month ago)

Start Date

22 Mar, 2024 (1 month ago)
due - 26 Apr, 2024 (2 days ago)

Due Date

26 Apr, 2024 (2 days ago)
Bid Notification

Type

Bid Notification
2024-09

Identifier

2024-09
Engineering

Customer / Agency

Engineering
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Project Title Valley View Trunk Sewer Design Invitation # 2024-09 Bid Posting Date 03/22/2024 3:00 PM (PDT) Project Stage Bidding Bid Due Date 04/26/2024 2:00 PM (PDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Categories 90735 - Designing Services 90742 - Geotechnical - Soils 90779 - Surveying Services (Not Aerial 91800 - Consulting Services 91842 - Engineering Consulting 91855 - Geological Consulting and Stud 92500 - ENGINEERING SERVICES, PROFESSI 96866 - Right of Way Services (Includi License Requirements Civil Engineering / Professional Engineering Department Engineering Address 75-515 Hovley Lane East Palm Desert, California 92211 County Riverside Bid Valid Liquidated Damages Estimated Bid Value Start/Delivery Date Anticipated Start Date of May 15, 2024 Project Duration Anticipated Completion Date of June 30, 2025 Bid Bond Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting
Information Pre-Bid Meeting Yes - Not Mandatory Pre-Bid Meeting Date 04/17/2024 10:00 AM (PDT) Pre-Bid Meeting Location Pre-Proposal Meeting will be held via Microsoft Teams: Meeting ID: 278 625 935 870 Passcode: okP6SF Call In (Audio Only): +1 323-484-5815,,863853925# United States, Los Angeles Phone Conference ID: 863 853 925# Online Q&A Online Q&A Yes Q&A Deadline 04/19/2024 4:00 PM (PDT) Contact Information Contact Info Armando Rodriguez / 760-398-2651 Ext. 2365 arodriguez@cvwd.org Bids to PlanetBids Owner's Agent Armando Rodriguez Description Scope of Services CVWD’s Engineering Department is requesting formal proposals from Respondents to prepare final plans, specifications, and cost estimates for the Valley View Trunk Sewer Design (Project). The Project work scope includes utility research, survey, potholing, right-of-way research and acquisition of necessary pipeline easements, fee title and temporary construction easements (TCE) if applicable (including preparation of legal descriptions and plats), geotechnical services, identification of alternatives and preferred pipeline alignments, final design documents, specifications, cost estimates, and permits for: 1. Proposed offsite improvements include a new sewer lift station (750 gpm firm capacity), 1,250 linear feet of 6-inch forcemain, 14,200 linear feet of 8-inch and 1,420 linear feet of 10-inch diameter gravity sewer pipeline along portions of Soto Street, Airport Blvd. The 6-inch forcemain will connect to CVWD’s existing 10-inch gravity sewer pipeline at the intersection of Grapefruit and Avenue 57. This system is expected to include 44 manholes. Please refer to the attached exhibit for the project limits. 2. A new sewage lift station would be constructed at the southwest parcel of Desert Cactus Drive and Avenue 57th. From there 1,250 linear feet of 6-inch diameter force main would be constructed to the connection point on Grapefruit Blvd and Avenue 57. 3. The design effort needs to include onsite improvements and laterals needed to convey flows from Desert View Mobile Home Park, Magdaleno Lopez Mobile Home Park, Campos Mobile Home Park, Meza’s Ranch, Rodriguez’ Ranch, Villa De Josue Mobile Home Park. Valley View Mobile Home Park, Leon Housing, Durans Farms, Oscar Cruz Water System, Luciano Valenzuela, Vista Norte Estates, De Leon Ranch, and Soto Water to the offsite sewer main. Approximately 6,175 feet of onsite pipelines for these 14 mobile home park to connect to the offsite sewer system. Onsite improvements also includes abandonment of 28 septic tanks. Please refer to the attached exhibit for the project limits. Other Details Notes Special Notices Local Programs & Policies Place eBid

75-515 Hovley Lane East Palm Desert, California 92211Location

Address: 75-515 Hovley Lane East Palm Desert, California 92211

Country : United StatesState : California

You may also like

Clearwell Improvements - Design

Due: 16 May, 2024 (in 18 days)Agency: Pittsburgh Water and Sewer Authority

East Trunk Sewer Line - Wetland Crossing

Due: 09 Aug, 2024 (in 3 months)Agency: Town of Fairfield

21-5794 TO#3 - 60110 Rainbow Valley WRF Expansion (Design)

Due: 31 Oct, 2024 (in 6 months)Agency: City of Goodyear

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.