Pinto Campus - Public Admin/Guardian Building and Warehouse Building Roof Replacement Public Administration Guardian Building - Chiller and Cooling Tower Replac...

expired opportunity(Expired)
From: Southern Nevada Regional Housing Authority(State)
606340-22 Addendum 2

Basic Details

started - 29 Aug, 2022 (19 months ago)

Start Date

29 Aug, 2022 (19 months ago)
due - 06 Oct, 2022 (17 months ago)

Due Date

06 Oct, 2022 (17 months ago)
Bid Notification

Type

Bid Notification
606340-22 Addendum 2

Identifier

606340-22 Addendum 2
Southern Nevada Regional Housing Authority

Customer / Agency

Southern Nevada Regional Housing Authority
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact listed in this bid. Scope 1 – Pinto Campus Public Admin/Guardian: Roof Replacement RP.D0919040 The "Project" of which the "Work" of the Contract is a part titled Pinto Campus Administration Guardian Building and Warehouse Roof Replacement (RP.D0919040) and is located at 515 Shadow Lane Las Vegas, Nevada 89106 (Admin Guardian Building), and at 1700 Kenyon Place Las Vegas, Nevada 89106 (Warehouse). The "Work" is described in the Project Drawings and Divisions 01 through 26 of the Project Manual. The Work consists of the demolition and disposal of existing, and installation of new roof on (2) separate buildings, the Public Administration Guardian Building which is approximately 15,290 square feet, and the Warehouse building, which is approximately 14, 292 square feet. Both building roof decks were constructed using metal deck with rigid insulation placed
over the deck and completed with (2) layers of built roofing. Demolition and removal of the existing roof flashings; cleaning of all roof and overflow drains; provide and install new dome strainers; new PVC roofing system and flashings, new skylight fall protection on both buildings, and modification to air handler 1 and 2 on the Public Administration Guardian Building, including modifications to the existing hydronic piping and valves servicing the units including repair and replacement. Construction includes all administrative work as required by Division 01 General Requirements for the demolition and removal of the existing roof and flashings, cleaning of all roof and overflow drains; provide and install new dome strainers, new PVC roofing system and flashings, and new skylight fall protection on both the Public Administration Building and the Warehouse Building. Additional work on the Public Administration Guardian Building includes; Design/Build of exterior scaffolding to access the roof, removal and/or upgrades to the existing exterior EIFS system on the penthouse and mechanical screen, modifications to air handler 1 and 2, including modifications to the existing hydronic piping and valves servicing the units including repair and replacement, interior below deck work to install new drip pan. Roofing work includes; disconnect existing equipment and utilities and temporarily move equipment to allow for the removal of the roof and flashings, removal of existing roof covering, coverboard, and insulation down to the steel deck and legally disposing of the material, removal of sheet metal flashing and counter flashing around perimeter walls including flashing at skylights, vents, fans, piping, air handlers, and HVAC equipment, installation of new PVC roof covering including roof covering, walkpads, coverboard, and insulation to meet current IECC requirements, reinstall existing removed fans and HVAC equipment, including curbs as detailed in drawings, re-connect and test all utilities to equipment to verify operational, and install new base terminations and flashing throughout. Scope 2 – Pinto Campus Public Administrator: Chiller and Cooling Tower Replacement RP.D0920046. The "Project" of which the "Work" of the Contract is a part titled Pinto Campus Administrator Building Chiller and Cooling Tower Replacement (RP.D0920046) and is located at 1700 Kenyon Place Las Vegas, Nevada 89106. The "Work" is described in the Project Drawings and Divisions 01 through 26 of the Project Manual The Work consists of the replacement. Selective demolition for removal of all existing infrastructure, piping, and equipment, including safing off and disconnections needed to remove the existing cooling tower and chiller from the site. Procurement and installation of new infrastructure, piping and equipment. Construction includes all administrative work as required by Division 01 General Requirements for selective demolition including removal of all existing infrastructure, piping, and equipment including safing off and disconnections needed to remove the existing cooling tower and chiller from the site. Work shall include; providing and installing temporary chillers, piping, and feeders to maintain existing systems while the new systems are being replaced. System shall be tested and run for two (2) full weeks prior to any work being started on the chiller/cooling tower replacement. Provide and install new chiller and cooling tower including new piping and infrastructure. All work shall be done in accordance with the project manual for this project and as noted on the drawings. If workflow requires a shut-down of building services, the contractor shall coordinate with the owner a minimum of (1) week prior to the anticipated shut down. If the Anticipated shut-down of services will require additional time (Above one (1) day’s normal work schedule), the shut-down shall occur over the weekend. At no time during the normal operating hours of the facility shall services NOT be available. Additional work includes installation of concrete modifications for concrete housekeeping pads as detailed in the drawings, and waterproofing modifications to the interior of the penthouse pump room of the Public Administration Guardian Building. Bid opening will be held on WebEx. To join copy and paste url: https://clarkcountynv.webex.com/clarkcountynv/j.php?MTID=me0ba0b0f723deb9f834cc0351fbdf523 To join by phone Dial 1-408-418-9388 Meeting/Access Code: 2496 842 8979

340 N 11th Street, Las Vegas, NV 89101Location

Address: 340 N 11th Street, Las Vegas, NV 89101

Country : United StatesState : Nevada

You may also like

Cooling Tower and Chiller Replacement

Due: 15 Apr, 2024 (in 18 days)Agency: PIEDMONT COMMUNITY COLLEGE

COOLING TOWER REPLACEMENT PROJECT - JOHN W. BRICKER FEDERAL BUILDING, COLUMBUS, OHIO

Due: 24 May, 2024 (in 1 month)Agency: PUBLIC BUILDINGS SERVICE

Please Sign In to see more like these.

Don't have an account yet? Create a free account now.

Classification

Purchasing