Repair Ash Handling Control System at the Central Heating & Power Plant (CH&PP)

expired opportunity(Expired)
From: Federal Government(Federal)
FA5004-AE-FTQW121008

Basic Details

started - 21 Feb, 2017 (about 7 years ago)

Start Date

21 Feb, 2017 (about 7 years ago)
due - 23 Mar, 2017 (about 7 years ago)

Due Date

23 Mar, 2017 (about 7 years ago)
Bid Notification

Type

Bid Notification
FA5004-AE-FTQW121008

Identifier

FA5004-AE-FTQW121008
Department of the Air Force

Customer / Agency

Department of the Air Force
unlockUnlock the best of InstantMarkets.

Please Sign In to see more out of InstantMarkets such as history, intelligent business alerts and many more.

Don't have an account yet? Create a free account now.

ARCHITECT-ENGINEERING (A-E) SERVICES AT EIELSON AFB, AK."Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date for receipt of proposals. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs."The 354th Contracting Squadron is seeking qualification packages and past performance information from vendors interested in providing professional architect and engineering services at Eielson AFB, AK to Repair Ash Handling Control System at the Central Heating & Power Plant (CH&PP).BACKGROUND: Eielson AFB owns and operates the Central Heat and Power Plant (CH&PP), a coal-fired co-generation plant. The plant has six boilers; each originally rated at 120,000 pounds of steam per hour. Each boiler is equipped with bottom ash
hoppers, sifting hoppers, fly ash hoppers at several levels, and a dedicated baghouse to capture fly ash. Ash from the boilers baghouses is collected in two silos using a piped vacuum collection system. Fly ash is collected in one silo and bottom ash is collected in the other. The bottom ash silo was erected in about 1986 and the fly ash silo was put into service in about 2005. Ash from the silos is gravity fed into a custom-made box fitted to a dump truck. The ash is transported several miles from the plant and land filled. The existing ash collection control system was installed in 1987 and is based on an Allen-Bradley PLC 5 and a PanelView 1250, which are no longer supported by the manufacturer. In addition, the existing panel is an upgrade from an older system. Many of the indicator lights and switches on the existing control panel are no longer functional. Ash unloading controls are not all in a single location. Workers operating the system must run upstairs to operate some controls - pug mill and mixer unloaders, for example. While operating the upstairs controls, the operator can't see what is happening at the truck. The level sensor in the ash silos no longer function reliably. In addition, there is no silo level indication located at the truck loading level. There is no reliable method installed to determine when the truck-mounted ash box is full. As a result, workers must pull the ash chute out of the ash box far enough to see the level of the ash in the box. Pulling the chute up during loading exacerbates the airborne dust problem./ a mercury tilt switch dangling from a cable off the end of the ash chute has been tried as a means to signal when the ash truck is full, however, the ash sometimes trapped the switch against the roof of the ash box. When that happened, the switch was torn off when the chute was retracted. Almost all areas inside the plant are dusty. Many areas are classified as Class II, Div 1 or 2, Group F. In addition, many of the metal surfaces inside may be coated with lead-based paint and there may be asbestos containing materials in the project area.This is a competitive selection process in which competing offeror's qualifications will be evaluated in accordance with (IAW) FAR Part 36.6 to determine the most highly qualified firms. The Government intends to award one Firm Fixed-Price contract.IAW FAR 36.603(b): To be considered for architect-engineer contracts, a firm must file with the appropriate office or board the Standard Form 330, "Architect-Engineer Qualifications," Part II and when applicable, SF 330, Part I. Responders are advised that the Government will not pay for any information or administrative costs incurred in response to this posting; all costs associated with responding will be solely at the interested parties' expense. Failure to respond to this post does not preclude participation in the subsequent technical evaluation so long as a firm's SF 330 is currently on file with the 354th Contracting Squadron. It is the responsibility of the potential offerors to monitor these sites for additional information pertaining to this requirement.This acquisition will be a 100% Small Business set-aside. The NAICS 541330 (Engineering Services) applies to this acquisition, with a small business size standard of $15M. The Disclosure of Magnitude for the subsequent construction project is between $500,000 and $1,000,000 IAW FAR 36.204(e).A-E EXPERIENCE REQUIREMENTS: A-E's experience shall include that which is commensurate with the requirements specific to the scope of design.A. The A-E shall demonstrate that they have experienced personnel with Alaska Registrations, and adequate capacity and depth in the following disciplines:1. Electrical EngineerB. The A-E shall also demonstrate that they have experienced personnel with certification and adequate capacity and depth in the following disciplines:1. Project/ Program Management2. Industrial Hygienists3. Cost Estimating4. Process Controls DesignerThe Air Force requires complete and functional designs that are appropriate for the sub-arctic environment of interior Alaska and that meet all applicable Federal, State, Local, Industry, U.S. Air Force and Eielson AFB requirements.The A-E shall be responsible for all travel and lodging arrangements and expenses involved in the performance of work under this contract. The A-E shall furnish the Air Force with complete and usable products to include: planning documents, investigative reports, study reports, design analyses, project drawings, technical provisions (specifications), equipment layouts, cost estimates, submittal registers, quality assurance plans, constructability review reports, construction bidding amendments, construction contract modifications, and other documents.QUESTIONS: All questions regarding this synopsis must be submitted in writing no later than 23 March 2017Primary POC email: zachary.bowens@us.af.milAlternate POC email: donovan.wall@us.af.milThe following documents are considered Attachments to this Synopsis/Solicitation:Attachment 1 - Instructions to OfferorsAttachment 2 - Evaluation CriteriaAttachment 3 - Statement of WorkAttachment 4 - SF 330Attachment 5 - Past Performance QuestionnaireAttachment 6 - AMRDEC GuideContact Information: Zachary S. Bowens, Contract Specialist, Phone 9073772760, Email zachary.bowens@us.af.mil - Donovan A. Wall, Contracting Officer, Phone 9073770108, Email donovan.wall@us.af.mil Office Address :2310 Central Ave Eielson AFB AK 99702 Location: 354 CONS - Eielson Set Aside: Total Small Business

Eielson AFB, Alaska, 99702Eielson AFB, AKLocation

Place Of Performance : Eielson AFB, Alaska, 99702Eielson AFB, AK

Country : United StatesState : Alaska

You may also like

Tecumseh, Nebraska; Power Plant Cooling Improvements

Due: 09 May, 2024 (in 6 days)Agency: Carroll Boone Water District

Wastewater Treatment Plant Lagoon Liner Repair

Due: 15 May, 2024 (in 12 days)Agency: City of Coffeyville

Classification

NAISC: 541330 GSA CLASS CODE: C