The project includes the following work: replacing wood poles consisting of: (47) Transmission, (5) Distribution and (5) guy-stubs, reconductor of a 2.4 mile length of 115kV transmission line from 336 ACSR to 795 AAC, transferring the existing 397 AAC 12.5kv distribution conductor to the new poles, and other associated work as described in the Summary of Work section. Number B638 Title Line Rebuild & Reconductor: Clark-Pioneer Available Date 9/13/2022 10:10 AM Due Date 9/27/2022 11:00 AM Contact Information Bid Type Contractor Services -