The Bucksburn Road Erosion Control and Outfall Replacement Project involves the construction of a vegetated rip-rap buttress, rock vanes and replacement of an existing outfall with a new armourstone headwall and concrete pipe to provide protection to two private properties located at 22 and 24 Bucksburn Road. Scope of work includes: ESC measures; tree protection/removals/injuries, bypass, installation of access; staging/stockpiling; construction of vegetated buttress, risk vanes and new outfall; earthworks; granular base; landscape restoration (fencing, plantings, topsoil, seed, sod, etc.). Bid Document Access : - Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $418.95, per bid fee -